St Louis County Public Works Department

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

CP 0984-262771 TST - CP 0984-262771 TST - Reclaim & OverlayNorthland Constructors of Duluth, Inc. Ulland Brothers, Inc. KGM Contractors, Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,500.00$4,500.00$11,726.65$11,726.65$13,000.00$13,000.00
2104.502REMOVE SIGN TYPE CEACH1$52.00$52.00$50.00$50.00$65.40$65.40
2104.502REMOVE PIPE APRONEACH1$120.00$120.00$600.00$600.00$650.00$650.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT602$2.00$1,204.00$2.00$1,204.00$3.00$1,806.00
2104.503REMOVE PIPE CULVERTSLIN FT48$20.00$960.00$9.00$432.00$13.00$624.00
2104.504REMOVE CONCRETE PAVEMENTSQ YD2,228$8.00$17,824.00$6.00$13,368.00$15.00$33,420.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD4,566$4.00$18,264.00$4.50$20,547.00$2.75$12,556.50
2106.507COMMON EMBANKMENT (CV) (P)CU YD1,010$12.00$12,120.00$9.00$9,090.00$10.60$10,706.00
2118.509AGGREGATE SURFACING CLASS 5TON438$20.00$8,760.00$19.50$8,541.00$15.40$6,745.20
2123.5108 TON STEEL-WHEELED ROLLERHOUR10$230.00$2,300.00$250.00$2,500.00$155.00$1,550.00
2123.5100.5 CU YD SHOVELHOUR5$180.00$900.00$250.00$1,250.00$165.00$825.00
2123.510MOTOR GRADERHOUR10$290.00$2,900.00$250.00$2,500.00$200.00$2,000.00
2123.51012 CU YD TRUCKHOUR2$140.00$280.00$290.00$580.00$125.00$250.00
2123.5104.0 CU YD FRONT END LOADERHOUR2$160.00$320.00$260.00$520.00$170.00$340.00
2130.523WATERM GALLON25$45.00$1,125.00$35.00$875.00$33.00$825.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD12$40.00$480.00$40.00$480.00$50.00$600.00
2211.509AGGREGATE BASE CLASS 5TON30$15.00$450.00$8.50$255.00$18.00$540.00
2215.504FULL DEPTH RECLAMATIONSQ YD9,699$0.92$8,923.08$0.75$7,274.25$0.60$5,819.40
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON643$3.00$1,929.00$2.00$1,286.00$2.70$1,736.10
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON2,261$56.00$126,616.00$70.00$158,270.00$65.65$148,434.65
2451.507GRANULAR BEDDING (CV) (P)CU YD14$40.00$560.00$37.00$518.00$40.00$560.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD70$30.00$2,100.00$16.00$1,120.00$20.00$1,400.00
2451.507GRANULAR BACKFILL (CV) (P)CU YD30$45.00$1,350.00$31.00$930.00$34.00$1,020.00
2501.50224" RC PIPE APRONEACH1$1,110.00$1,110.00$1,700.00$1,700.00$1,345.00$1,345.00
2501.50218" RC PIPE APRONEACH2$970.00$1,940.00$800.00$1,600.00$1,175.00$2,350.00
2501.50318" RC PIPE CULVERT DES 3006LIN FT50$87.00$4,350.00$73.00$3,650.00$86.00$4,300.00
2501.602CONCRETE CULVERT COLLAREACH1$435.00$435.00$850.00$850.00$1,500.00$1,500.00
2540.602MAIL BOX SUPPORTEACH6$135.00$810.00$130.00$780.00$140.00$840.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,750.00$1,750.00$2,800.00$2,800.00$4,800.00$4,800.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT2,703$3.00$8,109.00$3.00$8,109.00$3.00$8,109.00
2574.507COMMON TOPSOIL BORROWCU YD480$33.00$15,840.00$21.00$10,080.00$22.00$10,560.00
2575.504RAPID STABILIZATION METHOD 4SQ YD4,450$2.00$8,900.00$1.75$7,787.50$1.85$8,232.50
2580.503INTERIM PAVEMENT MARKINGLIN FT6,256$0.25$1,564.00$0.40$2,502.40$0.15$938.40
2582.5036" SOLID LINE MULTI COMPLIN FT6,935$0.62$4,299.70$0.60$4,161.00$0.65$4,507.75
2582.5034" BROKEN LINE MULTI COMPLIN FT660$0.52$343.20$0.50$330.00$0.55$363.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT409$1.04$425.36$1.00$409.00$0.80$327.20
2582.5034" SOLID LINE MULTI COMPLIN FT1,650$0.52$858.00$0.50$825.00$0.55$907.50
 Totals for project CP 0984-262771 TST $264,771.34 $289,500.80 $294,553.60
 
Contract Total:$264,771.34$289,500.80$294,553.60