Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,500.00$4,500.00$7,000.00$7,000.00$10,424.13$10,424.13
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT434$2.00$868.00$3.10$1,345.40$2.00$868.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD3,291$4.50$14,809.50$3.00$9,873.00$4.50$14,809.50
2118.501AGGREGATE SURFACING CLASS 5TON147$35.00$5,145.00$33.33$4,899.51$19.50$2,866.50
2123.5108 TON STEEL-WHEELED ROLLERHOUR3$230.00$690.00$155.00$465.00$250.00$750.00
2123.5104.0 CU YD FRONT END LOADERHOUR12$160.00$1,920.00$170.00$2,040.00$260.00$3,120.00
2123.510MOTOR GRADERHOUR3$290.00$870.00$210.00$630.00$260.00$780.00
2123.51012 CU YD TRUCKHOUR12$140.00$1,680.00$125.00$1,500.00$290.00$3,480.00
2123.5100.5 CU YD SHOVELHOUR12$180.00$2,160.00$165.00$1,980.00$280.00$3,360.00
2130.523WATERM GALLON6$45.00$270.00$33.00$198.00$35.00$210.00
2211.509AGGREGATE BASE CLASS 5TON50$15.00$750.00$16.00$800.00$10.50$525.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON305$3.00$915.00$2.90$884.50$2.00$610.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON943$56.00$52,808.00$73.30$69,121.90$72.00$67,896.00
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON28$180.00$5,040.00$108.80$3,046.40$120.00$3,360.00
2540.602MAIL BOX SUPPORTEACH5$135.00$675.00$215.00$1,075.00$130.00$650.00
2563.601TRAFFIC CONTROLLUMP SUM1$4,280.00$4,280.00$1,900.00$1,900.00$1,600.00$1,600.00
2582.5036" SOLID LINE MULTI COMPLIN FT1,835$0.62$1,137.70$0.65$1,192.75$0.60$1,101.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT1,056$1.04$1,098.24$0.80$844.80$1.00$1,056.00
 Totals for project CP 0985-262770 TST $99,616.44 $108,796.26 $117,466.13
 
CP 0984-262771 TST - CP 0984-262771 TST - Reclaim & OverlayNorthland Constructors of Duluth, Inc. KGM Contractors, Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,500.00$4,500.00$13,000.00$13,000.00$11,726.65$11,726.65
2104.502REMOVE PIPE APRONEACH1$120.00$120.00$650.00$650.00$600.00$600.00
2104.502REMOVE SIGN TYPE CEACH1$52.00$52.00$65.40$65.40$50.00$50.00
2104.503REMOVE PIPE CULVERTSLIN FT48$20.00$960.00$13.00$624.00$9.00$432.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT602$2.00$1,204.00$3.00$1,806.00$2.00$1,204.00
2104.504REMOVE CONCRETE PAVEMENTSQ YD2,228$8.00$17,824.00$15.00$33,420.00$6.00$13,368.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD4,566$4.00$18,264.00$2.75$12,556.50$4.50$20,547.00
2106.507COMMON EMBANKMENT (CV) (P)CU YD1,010$12.00$12,120.00$10.60$10,706.00$9.00$9,090.00
2118.509AGGREGATE SURFACING CLASS 5TON438$20.00$8,760.00$15.40$6,745.20$19.50$8,541.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR10$230.00$2,300.00$155.00$1,550.00$250.00$2,500.00
2123.510MOTOR GRADERHOUR10$290.00$2,900.00$200.00$2,000.00$250.00$2,500.00
2123.51012 CU YD TRUCKHOUR2$140.00$280.00$125.00$250.00$290.00$580.00
2123.5104.0 CU YD FRONT END LOADERHOUR2$160.00$320.00$170.00$340.00$260.00$520.00
2123.5100.5 CU YD SHOVELHOUR5$180.00$900.00$165.00$825.00$250.00$1,250.00
2130.523WATERM GALLON25$45.00$1,125.00$33.00$825.00$35.00$875.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD12$40.00$480.00$50.00$600.00$40.00$480.00
2211.509AGGREGATE BASE CLASS 5TON30$15.00$450.00$18.00$540.00$8.50$255.00
2215.504FULL DEPTH RECLAMATIONSQ YD9,699$0.92$8,923.08$0.60$5,819.40$0.75$7,274.25
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON643$3.00$1,929.00$2.70$1,736.10$2.00$1,286.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON2,261$56.00$126,616.00$65.65$148,434.65$70.00$158,270.00
2451.507GRANULAR BEDDING (CV) (P)CU YD14$40.00$560.00$40.00$560.00$37.00$518.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD70$30.00$2,100.00$20.00$1,400.00$16.00$1,120.00
2451.507GRANULAR BACKFILL (CV) (P)CU YD30$45.00$1,350.00$34.00$1,020.00$31.00$930.00
2501.50224" RC PIPE APRONEACH1$1,110.00$1,110.00$1,345.00$1,345.00$1,700.00$1,700.00
2501.50218" RC PIPE APRONEACH2$970.00$1,940.00$1,175.00$2,350.00$800.00$1,600.00
2501.50318" RC PIPE CULVERT DES 3006LIN FT50$87.00$4,350.00$86.00$4,300.00$73.00$3,650.00
2501.602CONCRETE CULVERT COLLAREACH1$435.00$435.00$1,500.00$1,500.00$850.00$850.00
2540.602MAIL BOX SUPPORTEACH6$135.00$810.00$140.00$840.00$130.00$780.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,750.00$1,750.00$4,800.00$4,800.00$2,800.00$2,800.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT2,703$3.00$8,109.00$3.00$8,109.00$3.00$8,109.00
2574.507COMMON TOPSOIL BORROWCU YD480$33.00$15,840.00$22.00$10,560.00$21.00$10,080.00
2575.504RAPID STABILIZATION METHOD 4SQ YD4,450$2.00$8,900.00$1.85$8,232.50$1.75$7,787.50
2580.503INTERIM PAVEMENT MARKINGLIN FT6,256$0.25$1,564.00$0.15$938.40$0.40$2,502.40
2582.5036" SOLID LINE MULTI COMPLIN FT6,935$0.62$4,299.70$0.65$4,507.75$0.60$4,161.00
2582.5034" SOLID LINE MULTI COMPLIN FT1,650$0.52$858.00$0.55$907.50$0.50$825.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT409$1.04$425.36$0.80$327.20$1.00$409.00
2582.5034" BROKEN LINE MULTI COMPLIN FT660$0.52$343.20$0.55$363.00$0.50$330.00
 Totals for project CP 0984-262771 TST $264,771.34 $294,553.60 $289,500.80
 
CP 0983-262772 TST - CP 0983-262772 TST - Reclaim & OverlayNorthland Constructors of Duluth, Inc. KGM Contractors, Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,500.00$4,500.00$18,000.00$18,000.00$11,276.85$11,276.85
2104.502REMOVE SIGN TYPE CEACH1$52.00$52.00$65.40$65.40$50.00$50.00
2104.503REMOVE PIPE CULVERTSLIN FT88$18.00$1,584.00$12.00$1,056.00$9.00$792.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT727$1.70$1,235.90$3.00$2,181.00$2.50$1,817.50
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,596$4.00$6,384.00$3.00$4,788.00$4.00$6,384.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD1,113$22.00$24,486.00$16.00$17,808.00$30.00$33,390.00
2106.507COMMON EMBANKMENT (CV) (P)CU YD791$10.00$7,910.00$3.80$3,005.80$4.00$3,164.00
2106.507EXCAVATION - COMMON (P)CU YD1,308$12.00$15,696.00$13.75$17,985.00$4.50$5,886.00
2118.509AGGREGATE SURFACING CLASS 5TON128$30.00$3,840.00$19.80$2,534.40$21.50$2,752.00
2123.51012 CU YD TRUCKHOUR2$140.00$280.00$125.00$250.00$290.00$580.00
2123.5100.5 CU YD SHOVELHOUR2$180.00$360.00$165.00$330.00$280.00$560.00
2123.510MOTOR GRADERHOUR1$290.00$290.00$225.00$225.00$250.00$250.00
2123.5104.0 CU YD FRONT END LOADERHOUR2$160.00$320.00$170.00$340.00$260.00$520.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR1$230.00$230.00$170.00$170.00$250.00$250.00
2130.523WATERM GALLON30$45.00$1,350.00$33.00$990.00$35.00$1,050.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD829$33.00$27,357.00$25.00$20,725.00$23.00$19,067.00
2211.509AGGREGATE BASE CLASS 5TON20$15.00$300.00$18.90$378.00$9.50$190.00
2215.504FULL DEPTH RECLAMATIONSQ YD996$1.40$1,394.40$1.70$1,693.20$1.50$1,494.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON496$3.00$1,488.00$2.70$1,339.20$2.00$992.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON1,525$56.00$85,400.00$62.80$95,770.00$72.00$109,800.00
2451.507GRANULAR BEDDING (CV) (P)CU YD21$48.00$1,008.00$40.00$840.00$35.00$735.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD80$28.00$2,240.00$20.00$1,600.00$12.00$960.00
2451.507GRANULAR BACKFILL (CV) (P)CU YD31$45.00$1,395.00$34.00$1,054.00$30.00$930.00
2501.50228" SPAN RC PIPE-ARCH APRONEACH2$1,330.00$2,660.00$1,375.00$2,750.00$1,000.00$2,000.00
2501.50215" RC PIPE APRONEACH2$890.00$1,780.00$1,100.00$2,200.00$700.00$1,400.00
2501.50215" GS PIPE APRONEACH4$260.00$1,040.00$500.00$2,000.00$250.00$1,000.00
2501.50328" SPAN RC PIPE-ARCH CULV CL IIALIN FT32$160.00$5,120.00$143.00$4,576.00$130.00$4,160.00
2501.50315" CS PIPE CULVERTLIN FT72$37.00$2,664.00$60.00$4,320.00$28.00$2,016.00
2501.50315" RC PIPE CULVERT DES 3006LIN FT36$80.00$2,880.00$83.00$2,988.00$70.00$2,520.00
2540.602MAIL BOX SUPPORTEACH1$135.00$135.00$140.00$140.00$130.00$130.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,750.00$1,750.00$2,400.00$2,400.00$2,800.00$2,800.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT322$3.10$998.20$3.10$998.20$3.00$966.00
2574.507COMMON TOPSOIL BORROWCU YD123$50.00$6,150.00$20.00$2,460.00$10.00$1,230.00
2575.504RAPID STABILIZATION METHOD 4SQ YD1,551$2.00$3,102.00$2.00$3,102.00$1.75$2,714.25
 Totals for project CP 0983-262772 TST $217,379.50 $221,062.20 $223,826.60
 
CP 0982-365978 - CP 0982-365978 (Low) Highway 53 to Haugen Road-Mill & OverlayNorthland Constructors of Duluth, Inc. KGM Contractors, Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,500.00$4,500.00$30,000.00$30,000.00$16,263.87$16,263.87
2104.503REMOVE PIPE CULVERTSLIN FT94$16.00$1,504.00$12.00$1,128.00$8.50$799.00
2104.503SAWING BITUMINOUS PAVEMENTLIN FT206$2.00$412.00$3.00$618.00$2.00$412.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD4,418$2.00$8,836.00$2.75$12,149.50$2.50$11,045.00
2104.504REMOVE CONCRETE PAVEMENTSQ YD39$12.00$468.00$25.00$975.00$9.00$351.00
2118.509AGGREGATE SURFACING CLASS 5TON526$22.00$11,572.00$12.00$6,312.00$19.50$10,257.00
2123.510MOTOR GRADERHOUR14$290.00$4,060.00$205.00$2,870.00$260.00$3,640.00
2123.5100.5 CU YD SHOVELHOUR5$180.00$900.00$165.00$825.00$280.00$1,400.00
2123.51012 CU YD TRUCKHOUR5$140.00$700.00$125.00$625.00$290.00$1,450.00
2123.5104.0 CU YD FRONT END LOADERHOUR5$160.00$800.00$170.00$850.00$265.00$1,325.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR14$230.00$3,220.00$155.00$2,170.00$250.00$3,500.00
2130.523WATERM GALLON15$45.00$675.00$33.00$495.00$35.00$525.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD34$50.00$1,700.00$40.00$1,360.00$34.00$1,156.00
2211.509AGGREGATE BASE CLASS 5TON971$10.00$9,710.00$12.00$11,652.00$9.50$9,224.50
2232.504MILL BITUMINOUS SURFACE (6.0")SQ YD2,688$2.80$7,526.40$5.00$13,440.00$4.75$12,768.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON774$3.00$2,322.00$2.75$2,128.50$2.00$1,548.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON2,302$56.00$128,912.00$63.85$146,982.70$72.00$165,744.00
2401.507STRUCTURE EXCAVATION CLASS E (P)CU YD170$22.00$3,740.00$18.10$3,077.00$19.00$3,230.00
2451.507GRANULAR BEDDING (CV) (P)CU YD58$40.00$2,320.00$40.00$2,320.00$35.00$2,030.00
2501.50222" SPAN RC PIPE-ARCH APRONEACH2$1,050.00$2,100.00$1,255.00$2,510.00$950.00$1,900.00
2501.50224" RC PIPE APRONEACH2$1,110.00$2,220.00$1,325.00$2,650.00$1,000.00$2,000.00
2501.50324" RC PIPE CULVERT DES 3006LIN FT40$95.00$3,800.00$95.00$3,800.00$112.00$4,480.00
2501.50322" SPAN RC PIPE-ARCH CULV CL IIALIN FT36$130.00$4,680.00$122.00$4,392.00$145.00$5,220.00
2540.602MAIL BOX SUPPORTEACH7$135.00$945.00$136.50$955.50$130.00$910.00
2563.601TRAFFIC CONTROLLUMP SUM1$7,680.00$7,680.00$2,800.00$2,800.00$1,600.00$1,600.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT153$3.10$474.30$3.10$474.30$3.00$459.00
2575.504RAPID STABILIZATION METHOD 4SQ YD97$2.50$242.50$2.70$261.90$2.50$242.50
2582.5036" SOLID LINE MULTI COMPLIN FT5,116$0.62$3,171.92$0.70$3,581.20$0.60$3,069.60
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT2,609$1.04$2,713.36$0.80$2,087.20$1.00$2,609.00
 Totals for project CP 0982-365978 $221,904.48 $263,489.80 $269,158.47
 