CP 0254-244395 TST - CP 0254-244395 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. Northland Constructors of Duluth, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$11,000.00$11,000.00$6,000.00$6,000.00$15,000.00$15,000.00$20,000.00$20,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$4,080.00$4,080.00$4,200.00$4,200.00$4,300.00$4,300.00$4,000.00$4,000.00
2104.501REMOVE PIPE CULVERTSLIN FT134$15.00$2,010.00$25.00$3,350.00$10.00$1,340.00$12.00$1,608.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD447$10.00$4,470.00$3.25$1,452.75$4.00$1,788.00$3.00$1,341.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT144$2.00$288.00$2.00$288.00$4.00$576.00$1.54$221.76
2105.604GEOGRIDSQ YD225$6.00$1,350.00$3.25$731.25$5.00$1,125.00$2.50$562.50
2105.604GEOTEXTILE FABRIC TYPE VISQ YD528$3.50$1,848.00$3.00$1,584.00$3.25$1,716.00$2.15$1,135.20
2118.501AGGREGATE SURFACING CLASS 5TON569$17.00$9,673.00$20.00$11,380.00$19.50$11,095.50$17.00$9,673.00
2123.503MOTOR GRADERHOUR16$300.00$4,800.00$275.00$4,400.00$195.00$3,120.00$200.00$3,200.00
2123.5070.5 CU YD SHOVELHOUR4$375.00$1,500.00$305.00$1,220.00$155.00$620.00$173.00$692.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR16$300.00$4,800.00$185.00$2,960.00$160.00$2,560.00$200.00$3,200.00
2130.501WATERM GALLON30$45.00$1,350.00$48.00$1,440.00$40.00$1,200.00$45.00$1,350.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON2,043$1.10$2,247.30$1.15$2,349.45$1.10$2,247.30$1.00$2,043.00
2211.501AGGREGATE BASE CLASS 5TON915$7.30$6,679.50$16.00$14,640.00$10.75$9,836.25$12.00$10,980.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD175$24.00$4,200.00$25.00$4,375.00$28.00$4,900.00$31.40$5,495.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD15,176$0.45$6,829.20$0.47$7,132.72$0.65$9,864.40$0.70$10,623.20
2215.501FULL DEPTH RECLAMATIONSQ YD16,422$0.42$6,897.24$0.42$6,897.24$0.60$9,853.20$0.65$10,674.30
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON1,682$1.00$1,682.00$1.04$1,749.28$1.00$1,682.00$1.00$1,682.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON4,430$2.50$11,075.00$2.55$11,296.50$2.55$11,296.50$2.43$10,764.90
2356.506BITUMINOUS SEAL COATSQ YD13,426$0.70$9,398.20$0.72$9,666.72$0.72$9,666.72$0.69$9,263.94
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON863$2.00$1,726.00$2.20$1,898.60$2.50$2,157.50$2.00$1,726.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON597$2.00$1,194.00$2.80$1,671.60$2.65$1,582.05$2.50$1,492.50
2360.501TYPE SP 9.5 WEARING COURSE MIX (3,C)TON1,287$45.00$57,915.00$44.00$56,628.00$51.50$66,280.50$48.00$61,776.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON1,736$41.90$72,738.40$44.00$76,384.00$46.50$80,724.00$47.00$81,592.00
2401.521STRUCTURE EXCAVATION CLASS E (P)CU YD591$14.00$8,274.00$13.00$7,683.00$11.30$6,678.30$19.20$11,347.20
2411.521GRANULAR BACKFILL (CV) (P)CU YD363$20.00$7,260.00$25.00$9,075.00$14.70$5,336.10$25.85$9,383.55
2451.507GRANULAR BEDDING (CV) (P)CU YD43$38.00$1,634.00$34.00$1,462.00$33.00$1,419.00$39.10$1,681.30
2501.51518" RC PIPE APRONEACH2$800.00$1,600.00$600.00$1,200.00$570.00$1,140.00$645.50$1,291.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT74$60.00$4,440.00$92.00$6,808.00$81.00$5,994.00$73.50$5,439.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH4$980.00$3,920.00$625.00$2,500.00$570.00$2,280.00$643.00$2,572.00
2501.56118" RC PIPE CULVERT DES 3006LIN FT40$40.00$1,600.00$80.00$3,200.00$57.00$2,280.00$52.60$2,104.00
2540.602MAIL BOX SUPPORTEACH2$130.00$260.00$133.00$266.00$135.00$270.00$127.50$255.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$300.00$300.00$400.00$400.00$1,050.00$1,050.00$350.00$350.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,800.00$2,800.00$5,500.00$5,500.00$3,500.00$3,500.00$5,815.00$5,815.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$200.00$200.00$300.00$300.00$1,700.00$1,700.00$250.00$250.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT456$2.15$980.40$2.20$1,003.20$2.20$1,003.20$2.90$1,322.40
2575.572RAPID STABILIZATION METHOD 4SQ YD376$2.25$846.00$2.30$864.80$2.35$883.60$1.26$473.76
2580.603INTERIM PAVEMENT MARKINGLIN FT9,730$0.08$778.40$0.13$1,264.90$0.10$973.00$0.08$778.40
2580.603INTERIM PAVEMENT MARKINGLIN FT9,730$0.12$1,167.60$0.13$1,264.90$0.20$1,946.00$0.12$1,167.60
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT1,471$0.18$264.78$0.19$279.49$0.19$279.49$0.18$264.78
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT1,302$0.06$78.12$0.06$78.12$0.06$78.12$0.06$78.12
2582.50224" SOLID LINE WHITE-PAINTLIN FT12$4.00$48.00$4.20$50.40$4.20$50.40$4.00$48.00
2582.5026" SOLID LINE WHITE-EPOXYLIN FT10,692$0.28$2,993.76$0.28$2,993.76$0.28$2,993.76$0.27$2,886.84
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT1,302$0.37$481.74$0.38$494.76$0.38$494.76$0.36$468.72
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT790$0.18$142.20$0.19$150.10$0.19$150.10$0.18$142.20
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT790$0.06$47.40$0.06$47.40$0.06$47.40$0.06$47.40
2582.5026" SOLID LINE WHITE-PAINTLIN FT10,692$0.09$962.28$0.09$962.28$0.09$962.28$0.09$962.28
2582.50224" SOLID LINE WHITE-POLY PREF-GR INLIN FT12$45.00$540.00$46.00$552.00$46.20$554.40$44.00$528.00
2582.5024" SOLID LINE YELLOW-PAINTLIN FT1,471$0.06$88.26$0.06$88.26$0.06$88.26$0.06$88.26
 Totals for project CP 0254-244395 TST $271,457.78 $282,183.48 $296,683.09 $304,841.11
 
Contract Total:$271,457.78$282,183.48$296,683.09$304,841.11