CP 0002-261283 - CP 0002-261283 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Northland Constructors of Duluth, Inc. Hawkinson Construction Co., Inc Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,450.00$6,450.00$14,000.00$14,000.00$5,000.00$5,000.00$30,000.00$30,000.00$400,000.00$400,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$835.00$835.00$1,155.00$1,155.00$1,050.00$1,050.00$1,000.00$1,000.00$5,000.00$5,000.00
2104.501REMOVE PIPE CULVERTSLIN FT419$10.00$4,190.00$15.00$6,285.00$28.00$11,732.00$12.60$5,279.40$5.00$2,095.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD2,558$4.00$10,232.00$3.35$8,569.30$3.50$8,953.00$3.35$8,569.30$5.00$12,790.00
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD22$15.00$330.00$25.00$550.00$15.00$330.00$7.60$167.20$10.00$220.00
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT20$2.00$40.00$5.30$106.00$2.35$47.00$2.45$49.00$5.00$100.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT886$2.00$1,772.00$2.25$1,993.50$2.00$1,772.00$1.95$1,727.70$5.00$4,430.00
2105.602TEMPORARY STREAM DIVERSION SYSTEMEACH1$5,400.00$5,400.00$5,550.00$5,550.00$3,500.00$3,500.00$5,700.00$5,700.00$5,000.00$5,000.00
2105.604GEOGRIDSQ YD600$4.50$2,700.00$5.00$3,000.00$3.30$1,980.00$2.40$1,440.00$0.50$300.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD2,072$3.50$7,252.00$3.35$6,941.20$3.00$6,216.00$2.25$4,662.00$0.50$1,036.00
2118.501AGGREGATE SURFACING CLASS 5TON1,591$17.00$27,047.00$17.50$27,842.50$20.00$31,820.00$17.00$27,047.00$20.00$31,820.00
2123.503MOTOR GRADERHOUR31$315.00$9,765.00$175.00$5,425.00$275.00$8,525.00$180.00$5,580.00$100.00$3,100.00
2123.5070.5 CU YD SHOVELHOUR31$200.00$6,200.00$145.00$4,495.00$260.00$8,060.00$174.00$5,394.00$100.00$3,100.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR31$300.00$9,300.00$150.00$4,650.00$185.00$5,735.00$180.00$5,580.00$100.00$3,100.00
2130.501WATERM GALLON60$40.00$2,400.00$60.00$3,600.00$47.00$2,820.00$45.00$2,700.00$60.00$3,600.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON3,403$1.10$3,743.30$1.10$3,743.30$1.15$3,913.45$1.05$3,573.15$1.00$3,403.00
2211.501AGGREGATE BASE CLASS 5TON6,346$8.00$50,768.00$10.60$67,267.60$17.00$107,882.00$11.80$74,882.80$15.00$95,190.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD854$31.00$26,474.00$21.00$17,934.00$22.80$19,471.20$32.00$27,328.00$30.00$25,620.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD29,494$0.50$14,747.00$0.63$18,581.22$0.50$14,747.00$0.64$18,876.16$1.00$29,494.00
2215.501FULL DEPTH RECLAMATIONSQ YD32,033$0.37$11,852.21$0.55$17,618.15$0.40$12,813.20$0.54$17,297.82$1.00$32,033.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,267$4.00$13,068.00$3.94$12,871.98$3.90$12,741.30$3.75$12,251.25$2.00$6,534.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON8,236$3.00$24,708.00$2.99$24,625.64$3.00$24,708.00$2.85$23,472.60$2.00$16,472.00
2356.506BITUMINOUS SEAL COATSQ YD24,956$0.50$12,478.00$0.47$11,729.32$0.47$11,729.32$0.45$11,230.20$2.00$49,912.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,854$2.00$3,708.00$2.40$4,449.60$2.40$4,449.60$2.00$3,708.00$2.00$3,708.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,711$2.00$3,422.00$2.50$4,277.50$2.40$4,106.40$2.50$4,277.50$2.00$3,422.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON6,235$38.80$241,918.00$43.40$270,599.00$42.00$261,870.00$42.00$261,870.00$50.00$311,750.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON167$63.00$10,521.00$70.00$11,690.00$75.00$12,525.00$72.00$12,024.00$100.00$16,700.00
2412.5117X4 PRECAST CONCRETE BOX CULVERTLIN FT54$500.00$27,000.00$700.00$37,800.00$680.00$36,720.00$586.00$31,644.00$1,000.00$54,000.00
2412.5127X4 PRECAST CONCRETE BOX CULV END SECTEACH2$6,000.00$12,000.00$6,500.00$13,000.00$5,500.00$11,000.00$5,767.00$11,534.00$500.00$1,000.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD3,605$16.00$57,680.00$11.55$41,637.75$12.00$43,260.00$17.45$62,907.25$5.00$18,025.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD2,240$23.00$51,520.00$14.45$32,368.00$28.00$62,720.00$25.65$57,456.00$5.00$11,200.00
2451.507GRANULAR BEDDING (CV) (P)CU YD149$25.00$3,725.00$30.00$4,470.00$35.00$5,215.00$39.00$5,811.00$5.00$745.00
2501.51124" RC PIPE CULVERTLIN FT106$40.00$4,240.00$70.00$7,420.00$51.00$5,406.00$66.25$7,022.50$50.00$5,300.00
2501.51118" RC PIPE CULVERTLIN FT216$34.00$7,344.00$58.00$12,528.00$41.00$8,856.00$61.45$13,273.20$50.00$10,800.00
2501.51524" RC PIPE APRONEACH4$600.00$2,400.00$610.00$2,440.00$780.00$3,120.00$663.00$2,652.00$500.00$2,000.00
2501.51518" RC PIPE APRONEACH10$530.00$5,300.00$550.00$5,500.00$680.00$6,800.00$561.00$5,610.00$500.00$5,000.00
2531.5077" CONCRETE DRIVEWAY PAVEMENTSQ YD22$100.00$2,200.00$122.40$2,692.80$96.00$2,112.00$97.00$2,134.00$50.00$1,100.00
2540.602MAIL BOX SUPPORTEACH51$130.00$6,630.00$131.25$6,693.75$130.00$6,630.00$125.00$6,375.00$150.00$7,650.00
2563.601TRAFFIC CONTROLLUMP SUM1$6,700.00$6,700.00$8,000.00$8,000.00$11,500.00$11,500.00$10,246.00$10,246.00$5,000.00$5,000.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$510.00$510.00$525.00$525.00$600.00$600.00$500.00$500.00$5,000.00$5,000.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT1,695$4.50$7,627.50$6.30$10,678.50$3.40$5,763.00$4.25$7,203.75$1.25$2,118.75
2575.572RAPID STABILIZATION METHOD 4SQ YD2,219$2.00$4,438.00$2.50$5,547.50$1.50$3,328.50$1.55$3,439.45$2.00$4,438.00
2577.504GRANULAR CHANNEL LINER (P)CU YD19$170.00$3,230.00$52.89$1,004.91$95.00$1,805.00$48.95$930.05$30.00$570.00
2580.603INTERIM PAVEMENT MARKINGLIN FT22,752$0.12$2,730.24$0.10$2,275.20$0.13$2,957.76$0.15$3,412.80$0.30$6,825.60
2580.603INTERIM PAVEMENT MARKINGLIN FT22,752$0.12$2,730.24$0.09$2,047.68$0.09$2,047.68$0.20$4,550.40$0.20$4,550.40
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT7,246$0.20$1,449.20$0.05$362.30$0.20$1,449.20$0.20$1,449.20$0.20$1,449.20
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT1,120$0.10$112.00$0.11$123.20$0.13$145.60$0.10$112.00$0.10$112.00
2582.50224" SOLID LINE WHITE-PAINTLIN FT38$4.30$163.40$3.47$131.86$4.10$155.80$3.30$125.40$0.10$3.80
2582.5026" SOLID LINE WHITE-EPOXYLIN FT19,907$0.30$5,972.10$0.08$1,592.56$0.28$5,573.96$0.26$5,175.82$0.10$1,990.70
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,890$0.05$94.50$0.05$94.50$0.06$113.40$0.05$94.50$0.10$189.00
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT1,120$0.41$459.20$0.11$123.20$0.40$448.00$0.40$448.00$0.20$224.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT19,907$0.08$1,592.56$0.08$1,592.56$0.09$1,791.63$0.08$1,592.56$0.10$1,990.70
2582.5024" SOLID LINE YELLOW-PAINTLIN FT7,246$0.05$362.30$0.05$362.30$0.06$434.76$0.05$362.30$0.10$724.60
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,890$0.20$378.00$0.05$94.50$0.20$378.00$0.20$378.00$0.10$189.00
2582.50224" SOLID LINE WHITE-EPOXYLIN FT38$10.00$380.00$3.47$131.86$9.20$349.60$7.00$266.00$0.10$3.80
 Totals for project CP 0002-261283 $730,288.75 $760,787.74 $819,177.36 $822,392.26 $1,222,128.55
 
Contract Total:$730,288.75$760,787.74$819,177.36$822,392.26$1,222,128.55