Bid Abstract

CP 0044-243854 - SAP 069-644-027, CP 0044-243854 - Bridge 83Redstone Construction, LLC Northland Constructors of Duluth, Inc. S & R Reinforcing, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.62$152,250.00$94,395.00$121,442.30$75,294.23$91,493.00$56,725.66
2021.501MOBILIZATIONLUMP SUM0.38$152,250.00$57,855.00$121,442.30$46,148.07$91,493.00$34,767.34
2031.502FIELD OFFICE TYPE DEACH1$8,000.00$8,000.00$6,000.00$6,000.00$15,000.00$15,000.00
2101.501CLEARING & GRUBBINGLUMP SUM1$1,800.00$1,800.00$2,500.00$2,500.00$1,800.00$1,800.00
2104.503REMOVE PIPE CULVERTSLIN FT70$8.00$560.00$12.00$840.00$8.00$560.00
2104.503REMOVE GUARDRAILLIN FT370$10.00$3,700.00$11.50$4,255.00$5.00$1,850.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT48$8.00$384.00$3.00$144.00$8.00$384.00
2105.601DEWATERINGLUMP SUM1$500.00$500.00$10,000.00$10,000.00$2,500.00$2,500.00
2105.601ONE LANE BYPASS (14' LANE)LUMP SUM1$40,000.00$40,000.00$120,000.00$120,000.00$60,000.00$60,000.00
2106.507EXCAVATION - COMMON (P)CU YD2,105$9.00$18,945.00$14.00$29,470.00$9.00$18,945.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD1,906$14.00$26,684.00$21.00$40,026.00$14.00$26,684.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD674$27.00$18,198.00$38.50$25,949.00$27.00$18,198.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON91$4.50$409.50$10.00$910.00$4.50$409.50
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON792$84.00$66,528.00$110.00$87,120.00$84.00$66,528.00
2401.503TYPE MOD P-2 (TL-4) BARRIER CONC (3S52) (P)LIN FT163$130.00$21,190.00$125.00$20,375.00$133.00$21,679.00
2401.507STRUCTURAL CONCRETE (3B52) (P)CU YD64$1,000.00$64,000.00$1,100.00$70,400.00$840.24$53,775.36
2401.508REINFORCEMENT BARS (EPOXY COATED) (P)POUND24,640$1.50$36,960.00$1.40$34,496.00$1.26$31,046.40
2401.508REINFORCEMENT BARS (STAINLESS-75KSI) (P)POUND480$6.50$3,120.00$6.25$3,000.00$6.00$2,880.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$20,000.00$20,000.00$18,500.00$18,500.00$20,766.00$20,766.00
2401.601SLOPE PREPARATIONLUMP SUM1$7,500.00$7,500.00$5,500.00$5,500.00$10,000.00$10,000.00
2401.618BRIDGE SLAB CONCRETE (3YHPC-M) (P)SQ FT2,530$38.00$96,140.00$41.00$103,730.00$36.65$92,724.50
2402.502FLOOR DRAIN TYPE B706 MODIFIEDEACH2$1,200.00$2,400.00$1,400.00$2,800.00$1,182.00$2,364.00
2402.502ELASTOMERIC BEARING PAD TYPE 1EACH10$100.00$1,000.00$125.00$1,250.00$100.00$1,000.00
2402.503STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT151$150.00$22,650.00$150.00$22,650.00$138.00$20,838.00
2402.601TEMPORARY BRIDGELUMP SUM1$35,000.00$35,000.00$1.00$1.00$155,000.00$155,000.00
2405.503PRESTRESSED CONCRETE BEAMS 27M (P)LIN FT315$325.00$102,375.00$240.00$75,600.00$240.80$75,852.00
2406.504BRIDGE APPROACH PANELS (P)SQ YD164$250.00$41,000.00$200.00$32,800.00$240.00$39,360.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$30,000.00$30,000.00$29,500.00$29,500.00$60,578.00$60,578.00
2452.502STEEL H-TEST PILE 40 FT LONG 10"EACH2$7,000.00$14,000.00$4,000.00$8,000.00$7,573.00$15,146.00
2452.502PILE TIP PROTECTION 10"EACH10$122.00$1,220.00$110.00$1,100.00$105.00$1,050.00
2452.602ROCK SOCKETEACH10$3,800.00$38,000.00$4,500.00$45,000.00$3,800.00$38,000.00
2452.603STEEL H-PILING 10"LIN FT240$40.00$9,600.00$35.00$8,400.00$40.00$9,600.00
2501.50218" GS PIPE APRONEACH4$300.00$1,200.00$500.00$2,000.00$300.00$1,200.00
2501.50318" CS PIPE CULVERTLIN FT80$40.00$3,200.00$33.00$2,640.00$40.00$3,200.00
2502.501DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,600.00$1,600.00$1,500.00$1,500.00$1,000.00$1,000.00
2511.504GEOTEXTILE FILTER TYPE 6SQ YD3,313$3.00$9,939.00$3.00$9,939.00$3.00$9,939.00
2511.504GEOTEXTILE FILTER TYPE 7SQ YD376$4.75$1,786.00$5.00$1,880.00$2.00$752.00
2511.507RANDOM RIPRAP CLASS IIICU YD196$55.00$10,780.00$42.00$8,232.00$40.00$7,840.00
2554.502END TREATMENT-TANGENT TERMINALEACH4$3,400.00$13,600.00$3,600.00$14,400.00$3,800.00$15,200.00
2554.503TRAFFIC BARRIER DESIGN SPECIALLIN FT100$105.00$10,500.00$100.00$10,000.00$104.50$10,450.00
2554.503TRAFFIC BARRIER DESIGN B8338LIN FT140$21.50$3,010.00$32.00$4,480.00$21.25$2,975.00
2563.601TRAFFIC CONTROLLUMP SUM0.38$15,000.00$5,700.00$3,300.00$1,254.00$3,800.00$1,444.00
2563.601TRAFFIC CONTROLLUMP SUM0.62$15,000.00$9,300.00$3,300.00$2,046.00$3,800.00$2,356.00
2563.601PORTABLE SIGNAL SYSTEMLUMP SUM1$13,900.00$13,900.00$14,500.00$14,500.00$13,900.00$13,900.00
2573.501EROSION CONTROL SUPERVISORLUMP SUM1$1,000.00$1,000.00$500.00$500.00$1,000.00$1,000.00
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT249$28.00$6,972.00$31.00$7,719.00$28.00$6,972.00
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERLIN FT24$8.00$192.00$7.00$168.00$8.00$192.00
2573.503SILT FENCE; TYPE HILIN FT1,264$3.00$3,792.00$2.40$3,033.60$3.00$3,792.00
2574.507COMMON TOPSOIL BORROWCU YD195$35.00$6,825.00$38.00$7,410.00$35.00$6,825.00
2574.508FERTILIZER TYPE 3POUND158$0.75$118.50$0.80$126.40$0.75$118.50
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD2,195$1.75$3,841.25$1.75$3,841.25$1.75$3,841.25
2575.505SEEDINGACRE0.45$500.00$225.00$105.00$47.25$500.00$225.00
2575.508SEED MIXTURE 25-121POUND32$4.50$144.00$9.00$288.00$4.50$144.00
2575.523RAPID STABILIZATION METHOD 3M GALLON5.4$500.00$2,700.00$990.00$5,346.00$500.00$2,700.00
2580.503INTERIM PAVEMENT MARKINGLIN FT1,306$0.30$391.80$1.00$1,306.00$0.30$391.80
2582.5034" DBLE SOLID LINE PAINTLIN FT653$4.00$2,612.00$4.20$2,742.60$2.50$1,632.50
2582.5034" SOLID LINE PAINTLIN FT1,306$2.00$2,612.00$2.10$2,742.60$1.25$1,632.50
 Totals for project CP 0044-243854 $1,000,054.05 $1,039,900.00 $1,055,733.31
 
Contract Total:$1,000,054.05$1,039,900.00$1,055,733.31