CP 0013-211986 - CP 0013-211986 Tied, Chip Seal: CSAH 14 to TH 2Asphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$10,000.00$10,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON16,920$0.88$14,889.60$1.59$26,902.80$1.00$16,920.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON27,796$1.81$50,310.76$2.71$75,327.16$2.45$68,100.20
2356.506BITUMINOUS SEAL COATSQ YD84,236$0.65$54,753.40$0.38$32,009.68$0.46$38,748.56
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$4,135.00$4,135.00$6,600.00$6,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT70,088$0.08$5,607.04$0.09$6,307.92$0.08$5,607.04
2582.5026" SOLID LINE WHITE-PAINTLIN FT55,223$0.07$3,865.61$0.06$3,313.38$0.07$3,865.61
2582.5028" DOTTED LINE WHITE-PAINTLIN FT471$0.52$244.92$1.00$471.00$0.50$235.50
2582.5024" SOLID LINE YELLOW-PAINTLIN FT14,005$0.05$700.25$0.06$840.30$0.05$700.25
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT4,050$0.05$202.50$0.06$243.00$0.05$202.50
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT8,259$0.10$825.90$0.11$908.49$0.09$743.31
2582.50224" SOLID LINE YELLOW-PAINTLIN FT190$4.20$798.00$3.00$570.00$3.30$627.00
2582.50224" SOLID LINE WHITE-PAINTLIN FT152$4.20$638.40$3.50$532.00$4.00$608.00
2582.602PROTECT PAVEMENT MARKINGSEACH6$400.00$2,400.00$45.00$270.00$50.00$300.00
2582.603PROTECT PAVEMENT MARKINGSLIN FT132$9.00$1,188.00$2.00$264.00$5.00$660.00
 Totals for project CP 0013-211986 $148,624.38 $155,427.73 $145,917.97
 
CP 0007-241426 - SAP 69-607-051(Low), CP 0007-241426 - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$22,000.00$22,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2331.608ROUT & SEAL BITUMINOUS PAVEMENT CRACKSPOUND18,376$2.50$45,940.00$2.56$47,042.56$4.49$82,508.24
2331.608CRACK REPAIR SPECIALPOUND7,909$3.50$27,681.50$3.05$24,122.45$4.99$39,465.91
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON25,448$0.88$22,394.24$1.59$40,462.32$1.00$25,448.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON66,162$1.81$119,753.22$2.71$179,299.02$2.45$162,096.90
2356.506BITUMINOUS SEAL COATSQ YD200,491$0.65$130,319.15$0.38$76,186.58$0.46$92,225.86
2563.601TRAFFIC CONTROLLUMP SUM1$4,400.00$4,400.00$4,135.00$4,135.00$6,700.00$6,700.00
2580.603INTERIM PAVEMENT MARKINGLIN FT173,938$0.08$13,915.04$0.09$15,654.42$0.08$13,915.04
2582.5026" SOLID LINE WHITE-PAINTLIN FT150,074$0.07$10,505.18$0.06$9,004.44$0.07$10,505.18
2582.5024" SOLID LINE YELLOW-PAINTLIN FT38,327$0.05$1,916.35$0.06$2,299.62$0.05$1,916.35
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT11,410$0.05$570.50$0.06$684.60$0.05$570.50
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT18,616$0.10$1,861.60$0.11$2,047.76$0.09$1,675.44
2582.5028" SOLID LINE WHITE-PAINTLIN FT235$0.52$122.20$0.50$117.50$0.50$117.50
2582.603PROTECT PAVEMENT MARKINGSLIN FT48$9.00$432.00$3.00$144.00$10.00$480.00
 Totals for project CP 0007-241426 $401,810.98 $404,533.27 $439,624.92
 
CP 0047-241967 - SAP 69-647-012 Tied, CP 0047-241967 - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$15,000.00$15,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON17,552$0.88$15,445.76$1.59$27,907.68$1.00$17,552.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON36,479$1.81$66,026.99$2.71$98,858.09$2.45$89,373.55
2356.506BITUMINOUS SEAL COATSQ YD110,543$0.65$71,852.95$0.38$42,006.34$0.46$50,849.78
2563.601TRAFFIC CONTROLLUMP SUM1$3,300.00$3,300.00$4,135.00$4,135.00$4,300.00$4,300.00
2580.603INTERIM PAVEMENT MARKINGLIN FT104,322$0.08$8,345.76$0.09$9,388.98$0.08$8,345.76
2582.5026" SOLID LINE WHITE-PAINTLIN FT80,278$0.07$5,619.46$0.06$4,816.68$0.07$5,619.46
2582.5028" DOTTED LINE WHITE-PAINTLIN FT57$0.52$29.64$1.00$57.00$0.50$28.50
2582.5024" SOLID LINE YELLOW-PAINTLIN FT14,913$0.05$745.65$0.06$894.78$0.05$745.65
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT4,880$0.05$244.00$0.06$292.80$0.05$244.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT16,184$0.10$1,618.40$0.11$1,780.24$0.09$1,456.56
2582.602PROTECT PAVEMENT MARKINGSEACH8$300.00$2,400.00$45.00$360.00$50.00$400.00
2582.603PROTECT PAVEMENT MARKINGSLIN FT100$9.00$900.00$2.50$250.00$10.00$1,000.00
 Totals for project CP 0047-241967 $191,528.61 $194,080.59 $181,915.26
 
CP 0048-257711 - CP 0048-257711 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$3,000.00$3,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON5,923$0.88$5,212.24$1.59$9,417.57$1.00$5,923.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON11,162$1.81$20,203.22$2.71$30,249.02$2.45$27,346.90
2356.506BITUMINOUS SEAL COATSQ YD33,825$0.65$21,986.25$0.38$12,853.50$0.46$15,559.50
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$4,135.00$4,135.00$7,600.00$7,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT35,318$0.08$2,825.44$0.09$3,178.62$0.08$2,825.44
2582.5026" SOLID LINE WHITE-PAINTLIN FT24,316$0.07$1,702.12$0.06$1,458.96$0.07$1,702.12
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT6,316$0.10$631.60$0.11$694.76$0.09$568.44
2582.5024" SOLID LINE YELLOW-PAINTLIN FT3,857$0.05$192.85$0.06$231.42$0.05$192.85
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,170$0.05$58.50$0.06$70.20$0.05$58.50
2582.602PROTECT PAVEMENT MARKINGSEACH6$25.00$150.00$45.00$270.00$50.00$300.00
2582.603PROTECT PAVEMENT MARKINGSLIN FT56$9.00$504.00$3.00$168.00$5.00$280.00
 Totals for project CP 0048-257711 $58,666.22 $66,060.05 $64,356.75
 
CP 0013-249390 - CP 0013-249390 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,000.00$6,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON13,004$0.88$11,443.52$1.59$20,676.36$1.00$13,004.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON20,383$1.81$36,893.23$2.71$55,237.93$2.45$49,938.35
2356.506BITUMINOUS SEAL COATSQ YD61,767$0.65$40,148.55$0.38$23,471.46$0.46$28,412.82
2563.601TRAFFIC CONTROLLUMP SUM1$3,300.00$3,300.00$4,135.00$4,135.00$5,400.00$5,400.00
2580.603INTERIM PAVEMENT MARKINGLIN FT39,728$0.08$3,178.24$0.09$3,575.52$0.08$3,178.24
2582.5026" SOLID LINE WHITE-PAINTLIN FT43,518$0.07$3,046.26$0.06$2,611.08$0.07$3,046.26
2582.5028" SOLID LINE WHITE-PAINTLIN FT250$0.52$130.00$0.50$125.00$0.50$125.00
2582.50224" SOLID LINE WHITE-PAINTLIN FT59$4.20$247.80$3.50$206.50$4.00$236.00
2582.50224" SOLID LINE YELLOW-PAINTLIN FT258$3.45$890.10$3.00$774.00$3.30$851.40
2582.5024" SOLID LINE YELLOW-PAINTLIN FT4,724$0.05$236.20$0.06$283.44$0.05$236.20
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT3,100$0.05$155.00$0.06$186.00$0.05$155.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT6,020$0.10$602.00$0.11$662.20$0.09$541.80
2582.602PROTECT PAVEMENT MARKINGSEACH8$25.00$200.00$45.00$360.00$50.00$400.00
2582.603PROTECT PAVEMENT MARKINGSLIN FT664$9.00$5,976.00$1.50$996.00$2.50$1,660.00
 Totals for project CP 0013-249390 $112,446.90 $116,633.49 $109,185.07
 
CP 0045-249392 - CP 0045-249392 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,000.00$6,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2331.608CRACK REPAIR SPECIALPOUND4,104$3.50$14,364.00$3.05$12,517.20$4.99$20,478.96
2331.608ROUT & SEAL BITUMINOUS PAVEMENT CRACKSPOUND14,696$2.50$36,740.00$2.56$37,621.76$4.49$65,985.04
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON5,859$0.88$5,155.92$1.59$9,315.81$1.00$5,859.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON15,302$1.81$27,696.62$2.71$41,468.42$2.45$37,489.90
2356.506BITUMINOUS SEAL COATSQ YD46,369$0.65$30,139.85$0.38$17,620.22$0.46$21,329.74
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$4,135.00$4,135.00$7,600.00$7,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT50,420$0.08$4,033.60$0.09$4,537.80$0.08$4,033.60
2582.5026" SOLID LINE WHITE-PAINTLIN FT34,082$0.07$2,385.74$0.06$2,044.92$0.07$2,385.74
2582.5024" SOLID LINE YELLOW-PAINTLIN FT2,686$0.05$134.30$0.06$161.16$0.05$134.30
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,350$0.05$67.50$0.06$81.00$0.05$67.50
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT10,587$3.45$36,525.15$0.11$1,164.57$0.09$952.83
2582.602PROTECT PAVEMENT MARKINGSEACH3$400.00$1,200.00$35.00$105.00$50.00$150.00
2582.603PROTECT PAVEMENT MARKINGSLIN FT36$9.00$324.00$4.00$144.00$10.00$360.00
 Totals for project CP 0045-249392 $166,966.68 $134,249.86 $168,826.61
 
CP 0056-249393 - CP 0056-249393 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$5,600.00$5,600.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON7,441$0.88$6,548.08$1.59$11,831.19$1.00$7,441.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON18,626$1.81$33,713.06$2.71$50,476.46$2.45$45,633.70
2356.506BITUMINOUS SEAL COATSQ YD56,443$0.65$36,687.95$0.38$21,448.34$0.46$25,963.78
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$4,135.00$4,135.00$7,600.00$7,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT45,464$0.08$3,637.12$0.09$4,091.76$0.08$3,637.12
2582.5026" SOLID LINE WHITE-PAINTLIN FT41,847$0.07$2,929.29$0.06$2,510.82$0.07$2,929.29
2582.5024" SOLID LINE YELLOW-PAINTLIN FT4,736$0.05$236.80$0.06$284.16$0.05$236.80
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT7,643$0.10$764.30$0.11$840.73$0.09$687.87
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT2,710$0.05$135.50$0.06$162.60$0.05$135.50
2582.603PROTECT PAVEMENT MARKINGSLIN FT40$9.00$360.00$3.00$120.00$5.00$200.00
 Totals for project CP 0056-249393 $92,812.10 $99,234.06 $96,465.06
 
CP 0073-249394 - CP 0073-249394 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$2,700.00$2,700.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,475$0.88$3,058.00$1.59$5,525.25$1.00$3,475.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON8,970$1.81$16,235.70$2.71$24,308.70$2.45$21,976.50
2356.506BITUMINOUS SEAL COATSQ YD27,775$0.65$18,053.75$0.38$10,554.50$0.46$12,776.50
2563.601TRAFFIC CONTROLLUMP SUM1$1,700.00$1,700.00$4,135.00$4,135.00$7,600.00$7,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT38,588$0.08$3,087.04$0.09$3,472.92$0.08$3,087.04
2582.5026" SOLID LINE WHITE-PAINTLIN FT20,291$0.07$1,420.37$0.06$1,217.46$0.07$1,420.37
2582.5024" SOLID LINE YELLOW-PAINTLIN FT1,684$0.05$84.20$0.06$101.04$0.05$84.20
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT360$0.05$18.00$0.06$21.60$0.05$18.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT8,625$0.10$862.50$0.11$948.75$0.09$776.25
2582.603PROTECT PAVEMENT MARKINGSLIN FT12$9.00$108.00$4.00$48.00$10.00$120.00
 Totals for project CP 0073-249394 $47,327.56 $53,666.22 $53,333.86
 
CP 0898-249395 - CP 0898-249395 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,800.00$4,800.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON5,828$0.88$5,128.64$1.59$9,266.52$1.00$5,828.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON16,027$1.81$29,008.87$2.71$43,433.17$2.45$39,266.15
2356.506BITUMINOUS SEAL COATSQ YD48,565$0.65$31,567.25$0.38$18,454.70$0.46$22,339.90
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$4,135.00$4,135.00$7,600.00$7,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT51,694$0.08$4,135.52$0.09$4,652.46$0.08$4,135.52
2582.5026" SOLID LINE WHITE-PAINTLIN FT35,518$0.07$2,486.26$0.06$2,131.08$0.07$2,486.26
2582.5024" SOLID LINE YELLOW-PAINTLIN FT6,005$0.05$300.25$0.06$360.30$0.05$300.25
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,840$0.05$92.00$0.06$110.40$0.05$92.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT9,001$0.10$900.10$0.11$990.11$0.09$810.09
2582.603PROTECT PAVEMENT MARKINGSLIN FT119$9.00$1,071.00$1.50$178.50$5.00$595.00
 Totals for project CP 0898-249395 $81,689.89 $87,045.24 $85,453.17
 
CP 0031-249391 - CP 0031-249391 Tied - Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,000.00$4,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON5,760$0.88$5,068.80$1.59$9,158.40$1.00$5,760.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON13,736$1.81$24,862.16$2.71$37,224.56$2.45$33,653.20
2356.506BITUMINOUS SEAL COATSQ YD41,625$0.65$27,056.25$0.38$15,817.50$0.46$19,147.50
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$4,135.00$4,135.00$7,600.00$7,600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT40,134$0.08$3,210.72$0.09$3,612.06$0.08$3,210.72
2582.5026" SOLID LINE WHITE-PAINTLIN FT30,283$0.07$2,119.81$0.06$1,816.98$0.07$2,119.81
2582.50224" SOLID LINE WHITE-PAINTLIN FT24$4.20$100.80$3.50$84.00$4.00$96.00
2582.5024" SOLID LINE YELLOW-PAINTLIN FT5,723$0.05$286.15$0.06$343.38$0.05$286.15
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,910$0.05$95.50$0.06$114.60$0.05$95.50
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT6,217$0.10$621.70$0.11$683.87$0.09$559.53
2582.602PROTECT PAVEMENT MARKINGSEACH2$500.00$1,000.00$45.00$90.00$50.00$100.00
2582.603PROTECT PAVEMENT MARKINGSLIN FT24$9.00$216.00$4.00$96.00$50.00$1,200.00
 Totals for project CP 0031-249391 $70,837.89 $76,509.35 $75,828.41
 
CP 0000-286249 - SAP 009-606-033, CP 0000-286249 - Carlton County Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$12,500.00$12,500.00$6,833.00$6,833.00$5,500.00$5,500.00
2232.604MILL BITUMINOUS PAVEMENT (SPECIAL)SQ YD6,011$8.00$48,088.00$7.00$42,077.00$8.66$52,055.26
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON15,177$0.88$13,355.76$1.59$24,131.43$1.00$15,177.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON42,259$1.81$76,488.79$2.71$114,521.89$2.45$103,534.55
2356.506BITUMINOUS SEAL COATSQ YD126,471$0.65$82,206.15$0.38$48,058.98$0.46$58,176.66
2563.601TRAFFIC CONTROLLUMP SUM1$3,200.00$3,200.00$4,135.00$4,135.00$7,400.00$7,400.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM1$1,500.00$1,500.00$1.00$1.00$2,000.00$2,000.00
2580.603INTERIM PAVEMENT MARKINGLIN FT46,894$0.08$3,751.52$0.09$4,220.46$0.08$3,751.52
2582.5024" SOLID LINE YELLOW-PAINTLIN FT14,472$0.05$723.60$0.06$868.32$0.05$723.60
2582.5026" SOLID LINE WHITE-PAINTLIN FT94,060$0.07$6,584.20$0.06$5,643.60$0.07$6,584.20
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT8,975$0.05$448.75$0.06$538.50$0.05$448.75
 Totals for project CP 0000-286249 $248,846.77 $251,029.18 $255,351.54
 
CP 0000-286250 - SAP 009-661-027, CP 0000-286250 - Carlton County Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.9$44,000.00$39,600.00$3,333.00$2,999.70$2,000.00$1,800.00
2021.501MOBILIZATIONLUMP SUM0.03$44,000.00$1,320.00$3,333.00$99.99$2,000.00$60.00
2021.501MOBILIZATIONLUMP SUM0.07$44,000.00$3,080.00$3,333.00$233.31$2,000.00$140.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON1,626$0.88$1,430.88$1.59$2,585.34$1.00$1,626.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON2,581$0.88$2,271.28$1.59$4,103.79$1.00$2,581.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON48,813$0.88$42,955.44$1.59$77,612.67$1.00$48,813.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON4,513$1.81$8,168.53$2.71$12,230.23$2.45$11,056.85
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON135,452$1.81$245,168.12$2.71$367,074.92$2.45$331,857.40
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON7,161$1.81$12,961.41$2.71$19,406.31$2.45$17,544.45
2356.506BITUMINOUS SEAL COATSQ YD21,512$0.65$13,982.80$0.38$8,174.56$0.46$9,895.52
2356.506BITUMINOUS SEAL COATSQ YD406,771$0.65$264,401.15$0.38$154,572.98$0.46$187,114.66
2356.506BITUMINOUS SEAL COATSQ YD13,553$0.65$8,809.45$0.38$5,150.14$0.46$6,234.38
2563.601TRAFFIC CONTROLLUMP SUM0.07$11,000.00$770.00$4,135.00$289.45$11,500.00$805.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM0.03$2,500.00$75.00$1.00$0.03$6,500.00$195.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM0.9$2,500.00$2,250.00$1.00$0.90$6,500.00$5,850.00
2563.601TRAFFIC CONTROLLUMP SUM0.9$11,000.00$9,900.00$4,135.00$3,721.50$11,500.00$10,350.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM0.07$2,500.00$175.00$1.00$0.07$6,500.00$455.00
2563.601TRAFFIC CONTROLLUMP SUM0.03$11,000.00$330.00$4,135.00$124.05$11,500.00$345.00
2580.603INTERIM PAVEMENT MARKINGLIN FT133,220$0.08$10,657.60$0.09$11,989.80$0.08$10,657.60
2580.603INTERIM PAVEMENT MARKINGLIN FT19,806$0.08$1,584.48$0.09$1,782.54$0.08$1,584.48
2580.603INTERIM PAVEMENT MARKINGLIN FT10,320$0.08$825.60$0.09$928.80$0.08$825.60
2582.501PAVT MSSG (LT ARROW) PAINTEACH2$42.00$84.00$75.00$150.00$40.00$80.00
2582.501PAVT MSSG (RT ARROW) PAINTEACH6$42.00$252.00$75.00$450.00$40.00$240.00
2582.501PAVT MSSG (RT ARROW) PAINTEACH2$42.00$84.00$75.00$150.00$40.00$80.00
2582.501PAVT MSSG (LT ARROW) PAINTEACH16$42.00$672.00$75.00$1,200.00$40.00$640.00
2582.5024" SOLID LINE WHITE-PAINTLIN FT5,098$0.05$254.90$0.06$305.88$0.07$356.86
2582.5024" SOLID LINE WHITE-PAINTLIN FT697$0.05$34.85$0.06$41.82$0.07$48.79
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT165$0.05$8.25$0.06$9.90$0.05$8.25
2582.5024" SOLID LINE WHITE-PAINTLIN FT239$0.05$11.95$0.06$14.34$0.07$16.73
2582.5024" SOLID LINE YELLOW-PAINTLIN FT6,437$0.05$321.85$0.06$386.22$0.05$321.85
2582.5026" SOLID LINE WHITE-PAINTLIN FT7,284$0.07$509.88$0.06$437.04$0.07$509.88
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,089$0.05$54.45$0.06$65.34$0.05$54.45
2582.5026" SOLID LINE WHITE-PAINTLIN FT11,456$0.07$801.92$0.06$687.36$0.07$801.92
2582.5024" SOLID LINE YELLOW-PAINTLIN FT36,081$0.05$1,804.05$0.06$2,164.86$0.05$1,804.05
2582.5026" SOLID LINE WHITE-PAINTLIN FT219,448$0.07$15,361.36$0.06$13,166.88$0.07$15,361.36
2582.50224" SOLID LINE YELLOW-PAINTLIN FT448$3.45$1,545.60$3.00$1,344.00$3.30$1,478.40
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT20,316$0.05$1,015.80$0.06$1,218.96$0.05$1,015.80
2582.5024" SOLID LINE YELLOW-PAINTLIN FT2,351$0.05$117.55$0.06$141.06$0.05$117.55
2582.50224" STOP LINE WHITE-PAINTLIN FT24$4.20$100.80$3.50$84.00$4.00$96.00
2582.503CROSSWALK MARKING-PAINTSQ FT126$2.70$340.20$3.50$441.00$2.60$327.60
2582.503CROSSWALK MARKING-PAINTSQ FT126$2.70$340.20$3.50$441.00$2.60$327.60
2582.503CROSSWALK MARKING-PAINTSQ FT126$2.70$340.20$3.50$441.00$2.60$327.60
 Totals for project CP 0000-286250 $694,772.55 $696,421.74 $673,805.63
 
CP 0000-286251 - CP 0000-286251: TLT 2016-1, TLT 2016-2, TLT 2016-3 - Carlton County Chip SealAsphalt Surface Tech Corp--ASTECH Fahrner Asphalt Sealers,LLC. - Eau Claire Scott Construction, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$1,000.00$1,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2021.501MOBILIZATIONLUMP SUM1$4,600.00$4,600.00$3,333.00$3,333.00$2,000.00$2,000.00
2021.501MOBILIZATIONLUMP SUM1$2,000.00$2,000.00$3,333.00$3,333.00$2,000.00$2,000.00
2331.608CRACK REPAIR SPECIALPOUND1,320$3.50$4,620.00$3.05$4,026.00$4.99$6,586.80
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON878$0.88$772.64$1.59$1,396.02$1.00$878.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON5,568$0.88$4,899.84$1.59$8,853.12$1.00$5,568.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON2,414$0.88$2,124.32$1.59$3,838.26$1.00$2,414.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON6,730$1.81$12,181.30$2.71$18,238.30$2.45$16,488.50
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON15,501$1.82$28,211.82$2.71$42,007.71$2.45$37,977.45
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON2,447$1.81$4,429.07$2.71$6,631.37$2.45$5,995.15
2356.506BITUMINOUS SEAL COATSQ YD20,118$0.65$13,076.70$0.38$7,644.84$0.46$9,254.28
2356.506BITUMINOUS SEAL COATSQ YD7,318$0.65$4,756.70$0.38$2,780.84$0.46$3,366.28
2356.506BITUMINOUS SEAL COATSQ YD46,400$0.65$30,160.00$0.38$17,632.00$0.46$21,344.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM1$500.00$500.00$1.00$1.00$500.00$500.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM1$300.00$300.00$1.00$1.00$500.00$500.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,200.00$1,200.00$4,135.00$4,135.00$6,600.00$6,600.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,200.00$1,200.00$4,135.00$4,135.00$6,600.00$6,600.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,200.00$1,200.00$4,135.00$4,135.00$6,600.00$6,600.00
2563.601TRAFFIC CONTROL SUPERVISORLUMP SUM1$700.00$700.00$1.00$1.00$700.00$700.00
2580.603INTERIM PAVEMENT MARKINGLIN FT20,778$0.08$1,662.24$0.09$1,870.02$0.08$1,662.24
2580.603INTERIM PAVEMENT MARKINGLIN FT33,330$0.08$2,666.40$0.09$2,999.70$0.08$2,666.40
2580.603INTERIM PAVEMENT MARKINGLIN FT5,800$0.08$464.00$0.09$522.00$0.08$464.00
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT434$0.05$21.70$0.06$26.04$0.05$21.70
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT675$0.05$33.75$0.06$40.50$0.05$33.75
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT2,291$0.05$114.55$0.06$137.46$0.05$114.55
2582.5026" SOLID LINE WHITE-PAINTLIN FT34,090$0.07$2,386.30$0.06$2,045.40$0.07$2,386.30
2582.5026" SOLID LINE WHITE-PAINTLIN FT16,460$0.07$1,152.20$0.06$987.60$0.07$1,152.20
2582.5024" SOLID LINE YELLOW-PAINTLIN FT9,714$0.05$485.70$0.06$582.84$0.05$485.70
2582.5026" SOLID LINE WHITE-PAINTLIN FT5,560$0.07$389.20$0.06$333.60$0.07$389.20
2582.5024" SOLID LINE YELLOW-PAINTLIN FT2,466$0.05$123.30$0.06$147.96$0.05$123.30
2582.5024" SOLID LINE YELLOW-PAINTLIN FT14,374$0.05$718.70$0.06$862.44$0.05$718.70
 Totals for project CP 0000-286251 $128,150.43 $146,011.02 $147,590.50
 
Contract Total:$2,444,480.96$2,480,901.80$2,497,654.75