St Louis County Public Works Department

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

CP 0090-8203 TST - SP 69-690-013, CP 0090-8203 TST - Reclaim, Mill, OverlayNorthland Constructors of Duluth, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$25,000.00$25,000.00$98,000.00$98,000.00$155,000.00$155,000.00$14,548.00$14,548.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$26,000.00$26,000.00$27,500.00$27,500.00$25,000.00$25,000.00$23,000.00$23,000.00
2104.501REMOVE PIPE CULVERTSLIN FT202$25.00$5,050.00$15.00$3,030.00$16.55$3,343.10$18.00$3,636.00
2104.501REMOVE SEWER PIPE (STORM)LIN FT197$25.00$4,925.00$17.00$3,349.00$17.72$3,490.84$18.00$3,546.00
2104.501REMOVE CURB AND GUTTERLIN FT2,492$3.50$8,722.00$4.00$9,968.00$4.78$11,911.76$4.20$10,466.40
2104.503REMOVE CONCRETE SIDEWALKSQ FT1,053$2.80$2,948.40$4.75$5,001.75$1.53$1,611.09$3.25$3,422.25
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,456$4.00$5,824.00$7.85$11,429.60$5.31$7,731.36$9.00$13,104.00
2104.505REMOVE BITUMINOUS DRIVEWAY PAVEMENTSQ YD1,036$4.80$4,972.80$12.00$12,432.00$4.00$4,144.00$12.00$12,432.00
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD133$15.00$1,995.00$20.00$2,660.00$42.13$5,603.29$20.00$2,660.00
2104.509REMOVE SIGN TYPE CEACH108$30.00$3,240.00$105.00$11,340.00$25.00$2,700.00$25.00$2,700.00
2104.509REMOVE CONCRETE APRONEACH4$220.00$880.00$600.00$2,400.00$397.63$1,590.52$200.00$800.00
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT576$3.10$1,785.60$6.00$3,456.00$2.94$1,693.44$3.00$1,728.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT2,227$1.70$3,785.90$5.00$11,135.00$1.63$3,630.01$1.70$3,785.90
2105.604GEOTEXTILE FABRIC TYPE VISQ YD1,207$3.50$4,224.50$4.65$5,612.55$2.83$3,415.81$4.00$4,828.00
2105.604GEOGRIDSQ YD1,125$5.50$6,187.50$7.00$7,875.00$3.25$3,656.25$5.00$5,625.00
2106.607GRANULAR EMBANKMENT (CV) (P)CU YD382$30.00$11,460.00$26.00$9,932.00$27.49$10,501.18$32.00$12,224.00
2118.501AGGREGATE SURFACING CLASS 5TON174$55.00$9,570.00$39.00$6,786.00$50.50$8,787.00$10.00$1,740.00
2118.609RECYCLED AGGREGATE SURFACINGTON1,220$25.70$31,354.00$13.20$16,104.00$24.90$30,378.00$15.00$18,300.00
2123.503MOTOR GRADERHOUR80$275.00$22,000.00$190.00$15,200.00$250.00$20,000.00$160.00$12,800.00
2123.5070.5 CU YD SHOVELHOUR35$265.00$9,275.00$150.00$5,250.00$300.54$10,518.90$175.00$6,125.00
2123.51012 CU YD TRUCKHOUR50$125.00$6,250.00$120.00$6,000.00$180.00$9,000.00$160.00$8,000.00
2123.5144.0 CU YD FRONT END LOADERHOUR25$175.00$4,375.00$195.00$4,875.00$250.00$6,250.00$190.00$4,750.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR80$190.00$15,200.00$175.00$14,000.00$250.00$20,000.00$160.00$12,800.00
2130.501WATERM GALLON84$48.00$4,032.00$31.00$2,604.00$45.00$3,780.00$48.00$4,032.00
2211.501AGGREGATE BASE CLASS 5TON1,096$19.00$20,824.00$10.40$11,398.40$19.00$20,824.00$18.00$19,728.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD488$33.00$16,104.00$39.00$19,032.00$38.16$18,622.08$52.00$25,376.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD40,638$0.60$24,382.80$0.56$22,757.28$0.85$34,542.30$0.20$8,127.60
2215.501FULL DEPTH RECLAMATIONSQ YD72,478$0.53$38,413.34$0.53$38,413.34$0.65$47,110.70$0.60$43,486.80
2221.501SHOULDER BASE AGGREGATE CLASS 5TON2,581$18.50$47,748.50$14.65$37,811.65$19.40$50,071.40$18.00$46,458.00
2232.501MILL BITUMINOUS SURFACE (5.0")SQ YD22,465$2.45$55,039.25$1.40$31,451.00$3.90$87,613.50$3.20$71,888.00
2232.501MILL BITUMINOUS SURFACE (3.0")SQ YD47,801$1.40$66,921.40$1.30$62,141.30$2.35$112,332.35$2.15$102,772.15
2232.501MILL BITUMINOUS SURFACE (4.0")SQ YD4,133$2.20$9,092.60$1.95$8,059.35$3.50$14,465.50$2.70$11,159.10
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,110$3.65$11,351.50$3.85$11,973.50$3.50$10,885.00$4.00$12,440.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON14,208$3.20$45,465.60$3.45$49,017.60$3.10$44,044.80$4.00$56,832.00
2356.506BITUMINOUS SEAL COATSQ YD39,467$0.84$33,152.28$0.88$34,730.96$0.80$31,573.60$0.65$25,653.55
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON8,141$2.30$18,724.30$2.40$19,538.40$2.50$20,352.50$1.70$13,839.70
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,697$3.00$5,091.00$2.50$4,242.50$2.70$4,581.90$3.00$5,091.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON17,726$53.00$939,478.00$49.65$880,095.90$56.50$1,001,519.00$68.00$1,205,368.00
2360.502TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C)TON6,684$55.00$367,620.00$49.85$333,197.40$56.50$377,646.00$68.00$454,512.00
2360.505TYPE SP 12.5 BIT MIXTURE FOR PATCHINGTON179$90.00$16,110.00$150.00$26,850.00$161.68$28,940.72$88.00$15,752.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON190$100.00$19,000.00$71.00$13,490.00$92.00$17,480.00$187.00$35,530.00
2411.521GRANULAR BACKFILL (CV) (P)CU YD402$34.00$13,668.00$27.50$11,055.00$34.16$13,732.32$30.00$12,060.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD1,625$12.00$19,500.00$17.50$28,437.50$24.17$39,276.25$18.00$29,250.00
2451.507GRANULAR BEDDING (CV) (P)CU YD180$34.00$6,120.00$35.00$6,300.00$42.55$7,659.00$35.00$6,300.00
2501.51512" RC PIPE APRONEACH1$600.00$600.00$1,100.00$1,100.00$682.89$682.89$650.00$650.00
2501.51515" RC PIPE APRONEACH2$620.00$1,240.00$1,200.00$2,400.00$665.61$1,331.22$700.00$1,400.00
2501.51518" RC PIPE APRONEACH8$730.00$5,840.00$1,300.00$10,400.00$713.69$5,709.52$750.00$6,000.00
2501.56118" RC PIPE CULVERT DES 3006 CL IIILIN FT178$50.00$8,900.00$85.00$15,130.00$53.04$9,441.12$44.00$7,832.00
2501.602CONCRETE CULVERT COLLAREACH4$1,200.00$4,800.00$1,750.00$7,000.00$606.08$2,424.32$1,500.00$6,000.00
2503.54115" RC PIPE SEWER DES 3006 CL IIILIN FT28$51.50$1,442.00$125.00$3,500.00$50.82$1,422.96$47.00$1,316.00
2503.54112" RC PIPE SEWER DES 3006 CL IIILIN FT163$45.00$7,335.00$80.00$13,040.00$45.79$7,463.77$45.00$7,335.00
2503.602CONNECT INTO EXISTING DRAINAGE STRUCTUREEACH10$700.00$7,000.00$2,900.00$29,000.00$227.98$2,279.80$1,500.00$15,000.00
2504.602ADJUST VALVE BOX (SPECIAL)EACH47$750.00$35,250.00$850.00$39,950.00$677.00$31,819.00$680.00$31,960.00
2506.522ADJUST FRAME & RING CASTINGEACH31$870.00$26,970.00$750.00$23,250.00$480.00$14,880.00$500.00$15,500.00
2506.602EXTERNAL FRAME SEALEACH30$450.00$13,500.00$750.00$22,500.00$288.00$8,640.00$300.00$9,000.00
2506.602REPAIR DRAINAGE STRUCTUREEACH30$1,000.00$30,000.00$2,850.00$85,500.00$409.31$12,279.30$670.00$20,100.00
2506.602GROUT ADJUSTING RINGSEACH19$400.00$7,600.00$450.00$8,550.00$200.00$3,800.00$220.00$4,180.00
2506.602ADJUST FRAME & RING CASTING (SPECIAL)EACH42$1,200.00$50,400.00$1,750.00$73,500.00$1,070.00$44,940.00$1,080.00$45,360.00
2506.602GROUT CATCH BASIN OR MANHOLEEACH30$1,000.00$30,000.00$1,600.00$48,000.00$497.05$14,911.50$630.00$18,900.00
2506.602MANHOLE FRAME SEAL (INTERNAL)EACH19$450.00$8,550.00$650.00$12,350.00$395.00$7,505.00$400.00$7,600.00
2521.5016" CONCRETE WALKSQ FT1,287$7.30$9,395.10$10.00$12,870.00$7.90$10,167.30$8.00$10,296.00
2531.501CONCRETE CURB & GUTTER DESIGN B624LIN FT2,552$30.00$76,560.00$35.00$89,320.00$30.18$77,019.36$30.30$77,325.60
2531.5077" CONCRETE DRIVEWAY PAVEMENTSQ YD104$85.00$8,840.00$88.00$9,152.00$70.00$7,280.00$70.00$7,280.00
2531.618TRUNCATED DOMESSQ FT88$38.00$3,344.00$40.00$3,520.00$36.00$3,168.00$36.00$3,168.00
2540.602MAIL BOX SUPPORTEACH74$135.00$9,990.00$141.00$10,434.00$127.50$9,435.00$130.00$9,620.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$1,000.00$1,000.00$5,000.00$5,000.00$10,000.00$10,000.00$11,000.00$11,000.00
2563.601TRAFFIC CONTROLLUMP SUM1$65,000.00$65,000.00$56,000.00$56,000.00$69,500.00$69,500.00$40,500.00$40,500.00
2564.618SIGN TYPE CSQ FT493$36.00$17,748.00$55.00$27,115.00$34.50$17,008.50$35.00$17,255.00
2565.602PVC HANDHOLEEACH3$1,300.00$3,900.00$1,365.00$4,095.00$1,239.00$3,717.00$1,240.00$3,720.00
2565.602NMC LOOP DETECTOR 6'X6'EACH19$1,400.00$26,600.00$1,500.00$28,500.00$1,300.00$24,700.00$1,300.00$24,700.00
2565.6032" NON-METALLIC CONDUITLIN FT457$10.00$4,570.00$11.00$5,027.00$9.58$4,378.06$9.60$4,387.20
2573.502SILT FENCE, TYPE HILIN FT371$2.80$1,038.80$11.00$4,081.00$5.50$2,040.50$4.95$1,836.45
2573.530STORM DRAIN INLET PROTECTIONEACH47$200.00$9,400.00$250.00$11,750.00$125.00$5,875.00$250.00$11,750.00
2573.604RAPID STABILIZATION METHOD 4SQ YD260$2.00$520.00$11.00$2,860.00$8.50$2,210.00$3.95$1,027.00
2575.505SODDING TYPE LAWNSQ YD658$16.00$10,528.00$18.00$11,844.00$12.00$7,896.00$15.00$9,870.00
2580.603INTERIM PAVEMENT MARKINGLIN FT64,256$0.16$10,280.96$0.11$7,068.16$0.20$12,851.20$0.20$12,851.20
2580.603INTERIM PAVEMENT MARKINGLIN FT128,512$0.16$20,561.92$0.10$12,851.20$0.20$25,702.40$0.20$25,702.40
2582.501PAVT MSSG (LT ARROW) PAINTEACH6$78.00$468.00$85.00$510.00$75.00$450.00$75.00$450.00
2582.501PAVT MSSG (RT ARROW) PAINTEACH7$78.00$546.00$85.00$595.00$75.00$525.00$75.00$525.00
2582.501PAVT MSSG (LT ARROW) POLY PREF-GR INEACH6$620.00$3,720.00$700.00$4,200.00$600.00$3,600.00$600.00$3,600.00
2582.501PAVT MSSG (RT-THRU ARROW) POLY PREF-GR INEACH2$1,020.00$2,040.00$1,100.00$2,200.00$975.00$1,950.00$980.00$1,960.00
2582.501PAVT MSSG (THRU ARROW) PAINTEACH3$78.00$234.00$85.00$255.00$75.00$225.00$75.00$225.00
2582.501PAVT MSSG (RT-THRU ARROW) PAINTEACH2$100.00$200.00$108.00$216.00$75.00$150.00$95.10$190.20
2582.501PAVT MSSG (RT ARROW) POLY PREF-GR INEACH7$620.00$4,340.00$700.00$4,900.00$600.00$4,200.00$600.00$4,200.00
2582.501PAVT MSSG (THRU ARROW) POLY PREF-GR INEACH3$620.00$1,860.00$700.00$2,100.00$600.00$1,800.00$600.00$1,800.00
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT110$0.11$12.10$0.11$12.10$0.10$11.00$0.10$11.00
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT110$0.25$27.50$0.27$29.70$0.24$26.40$0.25$27.50
2582.5024" SOLID LINE YELLOW-PAINTLIN FT500$0.11$55.00$0.11$55.00$0.10$50.00$0.10$50.00
2582.50224" SOLID LINE WHITE-POLY PREF-GR INLIN FT412$33.00$13,596.00$36.10$14,873.20$32.00$13,184.00$32.00$13,184.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT16,225$0.21$3,407.25$0.25$4,056.25$0.20$3,245.00$0.20$3,245.00
2582.5026" SOLID LINE WHITE-EPOXYLIN FT29,417$0.31$9,119.27$0.35$10,295.95$0.30$8,825.10$0.30$8,825.10
2582.50224" SOLID LINE YELLOW-EPOXYLIN FT268$5.75$1,541.00$6.20$1,661.60$5.50$1,474.00$5.50$1,474.00
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT500$0.25$125.00$0.30$150.00$0.24$120.00$0.25$125.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT29,417$0.13$3,824.21$0.14$4,118.38$0.12$3,530.04$0.12$3,530.04
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT16,225$0.50$8,112.50$0.55$8,923.75$0.48$7,788.00$0.50$8,112.50
2582.50224" SOLID LINE YELLOW-PAINTLIN FT268$2.90$777.20$3.15$844.20$2.80$750.40$2.80$750.40
2582.50224" SOLID LINE WHITE-PAINTLIN FT412$3.10$1,277.20$3.40$1,400.80$3.00$1,236.00$3.00$1,236.00
2582.503CROSSWALK MARKING-PAINTSQ FT477$2.70$1,287.90$3.00$1,431.00$2.60$1,240.20$2.60$1,240.20
2582.503CROSSWALK MARKING-POLY PREFORM-GR INSQ FT477$23.80$11,352.60$26.00$12,402.00$22.84$10,894.68$23.00$10,971.00
 Totals for project CP 0090-8203 TST $2,579,489.78 $2,717,820.27 $2,864,763.01 $2,924,830.24
 
Contract Total:$2,579,489.78$2,717,820.27$2,864,763.01$2,924,830.24