Contract Bid Abstract

CP 0002-244409 TST - CP 0002-244409 TST (Low) - Reclaim/Overlay & CulvertsUlland Brothers, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,450.00$6,450.00$83,000.00$83,000.00$30,000.00$30,000.00$10,000.00$10,000.00$400,000.00$400,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$850.00$850.00$2,000.00$2,000.00$1,000.00$1,000.00$1,050.00$1,050.00$5,000.00$5,000.00
2104.501REMOVE PIPE CULVERTSLIN FT527$10.30$5,428.10$10.00$5,270.00$12.60$6,640.20$25.00$13,175.00$5.00$2,635.00
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD25$15.00$375.00$25.00$625.00$7.60$190.00$13.00$325.00$25.00$625.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,908$3.00$5,724.00$3.35$6,391.80$3.30$6,296.40$3.00$5,724.00$6.00$11,448.00
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT24$2.40$57.60$5.30$127.20$2.45$58.80$2.35$56.40$5.00$120.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT751$2.00$1,502.00$2.40$1,802.40$1.85$1,389.35$2.00$1,502.00$5.00$3,755.00
2105.602TEMPORARY STREAM DIVERSION SYSTEMEACH1$3,600.00$3,600.00$5,550.00$5,550.00$4,515.00$4,515.00$3,500.00$3,500.00$5,000.00$5,000.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD1,795$3.50$6,282.50$3.35$6,013.25$2.25$4,038.75$3.00$5,385.00$1.00$1,795.00
2105.604GEOGRIDSQ YD787$4.50$3,541.50$5.00$3,935.00$2.40$1,888.80$3.20$2,518.40$1.00$787.00
2118.501AGGREGATE SURFACING CLASS 5TON1,431$17.25$24,684.75$16.85$24,112.35$17.00$24,327.00$20.00$28,620.00$30.00$42,930.00
2123.503MOTOR GRADERHOUR32$315.00$10,080.00$175.00$5,600.00$180.00$5,760.00$275.00$8,800.00$100.00$3,200.00
2123.5070.5 CU YD SHOVELHOUR32$170.00$5,440.00$150.00$4,800.00$174.00$5,568.00$260.00$8,320.00$100.00$3,200.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR32$300.00$9,600.00$145.00$4,640.00$180.00$5,760.00$185.00$5,920.00$100.00$3,200.00
2130.501WATERM GALLON60$40.00$2,400.00$32.00$1,920.00$45.00$2,700.00$47.00$2,820.00$60.00$3,600.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON3,514$1.20$4,216.80$1.10$3,865.40$1.05$3,689.70$1.15$4,041.10$1.00$3,514.00
2211.501AGGREGATE BASE CLASS 5TON6,196$7.25$44,921.00$9.40$58,242.40$11.80$73,112.80$16.00$99,136.00$15.00$92,940.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD728$31.00$22,568.00$21.00$15,288.00$31.00$22,568.00$27.00$19,656.00$30.00$21,840.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD30,458$0.50$15,229.00$0.60$18,274.80$0.64$19,493.12$0.49$14,924.42$1.00$30,458.00
2215.501FULL DEPTH RECLAMATIONSQ YD32,899$0.37$12,172.63$0.55$18,094.45$0.54$17,765.46$0.40$13,159.60$1.00$32,899.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,374$4.00$13,496.00$3.95$13,327.30$3.75$12,652.50$3.90$13,158.60$2.00$6,748.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON8,505$3.00$25,515.00$2.99$25,429.95$2.85$24,239.25$3.00$25,515.00$2.00$17,010.00
2356.506BITUMINOUS SEAL COATSQ YD25,772$0.50$12,886.00$0.47$12,112.84$0.45$11,597.40$0.47$12,112.84$2.00$51,544.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,824$2.00$3,648.00$2.45$4,468.80$2.00$3,648.00$2.40$4,377.60$2.00$3,648.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,713$2.00$3,426.00$2.55$4,368.15$2.50$4,282.50$2.40$4,111.20$2.00$3,426.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON6,238$38.55$240,474.90$43.80$273,224.40$42.00$261,996.00$42.00$261,996.00$50.00$311,900.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON45$58.35$2,625.75$70.00$3,150.00$72.00$3,240.00$75.00$3,375.00$80.00$3,600.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD2,253$15.00$33,795.00$11.55$26,022.15$17.45$39,314.85$12.00$27,036.00$5.00$11,265.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD1,292$23.00$29,716.00$14.45$18,669.40$25.65$33,139.80$29.00$37,468.00$5.00$6,460.00
2451.507GRANULAR BEDDING (CV) (P)CU YD157$25.00$3,925.00$30.00$4,710.00$39.00$6,123.00$35.00$5,495.00$5.00$785.00
2501.51124" RC PIPE CULVERTLIN FT40$40.00$1,600.00$68.00$2,720.00$57.75$2,310.00$59.00$2,360.00$40.00$1,600.00
2501.51118" RC PIPE CULVERTLIN FT110$36.00$3,960.00$58.00$6,380.00$61.70$6,787.00$42.00$4,620.00$20.00$2,200.00
2501.51518" RC PIPE APRONEACH6$500.00$3,000.00$550.00$3,300.00$560.00$3,360.00$670.00$4,020.00$500.00$3,000.00
2501.51524" RC PIPE APRONEACH2$600.00$1,200.00$600.00$1,200.00$660.00$1,320.00$740.00$1,480.00$500.00$1,000.00
2501.52128" SPAN RC PIPE-ARCH CULV CL IIALIN FT38$64.00$2,432.00$95.00$3,610.00$98.25$3,733.50$99.00$3,762.00$200.00$7,600.00
2501.52165" SPAN RC PIPE-ARCH CULV CL IIALIN FT40$140.00$5,600.00$255.00$10,200.00$228.00$9,120.00$240.00$9,600.00$100.00$4,000.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT166$52.00$8,632.00$77.00$12,782.00$91.00$15,106.00$74.00$12,284.00$200.00$33,200.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH10$600.00$6,000.00$600.00$6,000.00$556.30$5,563.00$670.00$6,700.00$100.00$1,000.00
2501.52528" SPAN RC PIPE-ARCH APRONEACH2$630.00$1,260.00$665.00$1,330.00$621.40$1,242.80$740.00$1,480.00$100.00$200.00
2501.52565" SPAN RC PIPE-ARCH APRONEACH2$1,600.00$3,200.00$2,525.00$5,050.00$1,670.00$3,340.00$2,500.00$5,000.00$500.00$1,000.00
2531.5077" CONCRETE DRIVEWAY PAVEMENTSQ YD25$100.00$2,500.00$120.00$3,000.00$97.00$2,425.00$97.00$2,425.00$50.00$1,250.00
2540.602MAIL BOX SUPPORTEACH35$130.00$4,550.00$130.00$4,550.00$125.00$4,375.00$130.00$4,550.00$150.00$5,250.00
2563.601TRAFFIC CONTROLLUMP SUM1$4,300.00$4,300.00$5,600.00$5,600.00$7,800.00$7,800.00$9,500.00$9,500.00$5,000.00$5,000.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$500.00$500.00$550.00$550.00$500.00$500.00$600.00$600.00$5,000.00$5,000.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT1,539$4.50$6,925.50$6.35$9,772.65$4.25$6,540.75$3.40$5,232.60$1.25$1,923.75
2575.572RAPID STABILIZATION METHOD 4SQ YD1,289$2.00$2,578.00$2.50$3,222.50$1.55$1,997.95$1.50$1,933.50$5.00$6,445.00
2580.603INTERIM PAVEMENT MARKINGLIN FT23,740$0.12$2,848.80$0.10$2,374.00$0.20$4,748.00$0.09$2,136.60$0.50$11,870.00
2580.603INTERIM PAVEMENT MARKINGLIN FT23,740$0.12$2,848.80$0.10$2,374.00$0.15$3,561.00$0.13$3,086.20$0.50$11,870.00
2582.5026" SOLID LINE WHITE-EPOXYLIN FT20,842$0.30$6,252.60$0.08$1,667.36$0.26$5,418.92$0.28$5,835.76$0.20$4,168.40
2582.5024" SOLID LINE YELLOW-PAINTLIN FT5,606$0.05$280.30$0.05$280.30$0.05$280.30$0.06$336.36$0.20$1,121.20
2582.50224" SOLID LINE WHITE-EPOXYLIN FT40$7.00$280.00$3.47$138.80$7.00$280.00$9.20$368.00$0.10$4.00
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,650$0.20$330.00$0.05$82.50$0.20$330.00$0.20$330.00$0.10$165.00
2582.50224" SOLID LINE WHITE-PAINTLIN FT40$3.37$134.80$3.47$138.80$3.30$132.00$4.10$164.00$0.20$8.00
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT5,606$0.20$1,121.20$0.05$280.30$0.20$1,121.20$0.20$1,121.20$0.10$560.60
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT2,307$0.10$230.70$0.11$253.77$0.10$230.70$0.13$299.91$0.20$461.40
2582.5026" SOLID LINE WHITE-PAINTLIN FT20,842$0.08$1,667.36$0.08$1,667.36$0.08$1,667.36$0.09$1,875.78$0.20$4,168.40
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,650$0.05$82.50$0.05$82.50$0.05$82.50$0.06$99.00$0.20$330.00
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT2,307$0.40$922.80$0.11$253.77$0.40$922.80$0.40$922.80$0.20$461.40
 Totals for project CP 0002-244409 TST $629,867.89 $743,895.65 $731,290.46 $735,400.87 $1,200,189.15
 
CP 0259-153437 TST - CP 0259-153437 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$3,000.00$3,000.00$7,500.00$7,500.00$10,000.00$10,000.00$5,000.00$5,000.00$300,000.00$300,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$850.00$850.00$1,500.00$1,500.00$1,000.00$1,000.00$1,050.00$1,050.00$5,000.00$5,000.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD573$12.00$6,876.00$5.00$2,865.00$7.50$4,297.50$7.00$4,011.00$5.00$2,865.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT501$2.00$1,002.00$3.80$1,903.80$1.85$926.85$2.00$1,002.00$5.00$2,505.00
2118.501AGGREGATE SURFACING CLASS 5TON974$16.00$15,584.00$16.45$16,022.30$17.00$16,558.00$22.50$21,915.00$5.00$4,870.00
2123.503MOTOR GRADERHOUR26$315.00$8,190.00$175.00$4,550.00$180.00$4,680.00$275.00$7,150.00$100.00$2,600.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR26$300.00$7,800.00$145.00$3,770.00$180.00$4,680.00$185.00$4,810.00$100.00$2,600.00
2130.501WATERM GALLON120$40.00$4,800.00$30.00$3,600.00$45.00$5,400.00$47.00$5,640.00$60.00$7,200.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON3,220$1.10$3,542.00$1.10$3,542.00$1.05$3,381.00$1.15$3,703.00$1.00$3,220.00
2211.501AGGREGATE BASE CLASS 5TON5,158$7.00$36,106.00$9.40$48,485.20$11.80$60,864.40$16.50$85,107.00$15.00$77,370.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD28,088$0.50$14,044.00$0.60$16,852.80$0.64$17,976.32$0.53$14,886.64$1.00$28,088.00
2215.501FULL DEPTH RECLAMATIONSQ YD33,050$0.37$12,228.50$0.55$18,177.50$0.54$17,847.00$0.40$13,220.00$1.00$33,050.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,090$4.00$12,360.00$3.95$12,205.50$3.75$11,587.50$3.90$12,051.00$2.00$6,180.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON7,724$3.00$23,172.00$2.99$23,094.76$2.85$22,013.40$3.00$23,172.00$2.00$15,448.00
2356.506BITUMINOUS SEAL COATSQ YD23,406$0.50$11,703.00$0.47$11,000.82$0.45$10,532.70$0.47$11,000.82$2.00$46,812.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,641$2.00$3,282.00$2.40$3,938.40$2.00$3,282.00$2.40$3,938.40$2.00$3,282.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,224$2.00$2,448.00$2.50$3,060.00$2.50$3,060.00$2.50$3,060.00$2.00$2,448.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON5,618$38.00$213,484.00$44.00$247,192.00$42.00$235,956.00$42.00$235,956.00$50.00$280,900.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON100$62.00$6,200.00$70.00$7,000.00$72.00$7,200.00$80.00$8,000.00$80.00$8,000.00
2540.602MAIL BOX SUPPORTEACH39$135.00$5,265.00$135.00$5,265.00$125.00$4,875.00$130.00$5,070.00$125.00$4,875.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$500.00$500.00$550.00$550.00$500.00$500.00$600.00$600.00$5,000.00$5,000.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,800.00$3,800.00$4,500.00$4,500.00$5,100.00$5,100.00$8,500.00$8,500.00$10,000.00$10,000.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$510.00$510.00$1,000.00$1,000.00$500.00$500.00$520.00$520.00$2,000.00$2,000.00
2580.603INTERIM PAVEMENT MARKINGLIN FT29,686$0.12$3,562.32$0.10$2,968.60$0.20$5,937.20$0.09$2,671.74$0.20$5,937.20
2580.603INTERIM PAVEMENT MARKINGLIN FT29,686$0.12$3,562.32$0.10$2,968.60$0.15$4,452.90$0.13$3,859.18$0.20$5,937.20
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT3,991$0.20$798.20$0.05$199.55$0.20$798.20$0.20$798.20$0.10$399.10
2582.5024" SOLID LINE YELLOW-PAINTLIN FT3,991$0.05$199.55$0.05$199.55$0.05$199.55$0.06$239.46$0.10$399.10
2582.50224" SOLID LINE WHITE-PAINTLIN FT24$3.37$80.88$3.47$83.28$3.30$79.20$4.10$98.40$0.10$2.40
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,140$0.05$57.00$0.05$57.00$0.05$57.00$0.06$68.40$0.10$114.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT4,856$0.10$485.60$0.11$534.16$0.10$485.60$0.13$631.28$0.10$485.60
2582.5026" SOLID LINE WHITE-PAINTLIN FT20,595$0.08$1,647.60$0.08$1,647.60$0.08$1,647.60$0.09$1,853.55$0.10$2,059.50
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT4,856$0.40$1,942.40$0.11$534.16$0.40$1,942.40$0.40$1,942.40$0.10$485.60
2582.50224" SOLID LINE WHITE-EPOXYLIN FT24$9.00$216.00$3.47$83.28$7.00$168.00$9.20$220.80$0.10$2.40
2582.5026" SOLID LINE WHITE-EPOXYLIN FT20,595$0.30$6,178.50$0.08$1,647.60$0.26$5,354.70$0.28$5,766.60$0.10$2,059.50
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,140$0.20$228.00$0.05$57.00$0.20$228.00$0.20$228.00$0.10$114.00
 Totals for project CP 0259-153437 TST $415,704.87 $458,555.46 $473,568.02 $497,740.87 $872,308.60
 
CP 0002-261283 - CP 0002-261283 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,450.00$6,450.00$14,000.00$14,000.00$30,000.00$30,000.00$5,000.00$5,000.00$400,000.00$400,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$835.00$835.00$1,155.00$1,155.00$1,000.00$1,000.00$1,050.00$1,050.00$5,000.00$5,000.00
2104.501REMOVE PIPE CULVERTSLIN FT419$10.00$4,190.00$15.00$6,285.00$12.60$5,279.40$28.00$11,732.00$5.00$2,095.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD2,558$4.00$10,232.00$3.35$8,569.30$3.35$8,569.30$3.50$8,953.00$5.00$12,790.00
2104.505REMOVE CONCRETE DRIVEWAY PAVEMENTSQ YD22$15.00$330.00$25.00$550.00$7.60$167.20$15.00$330.00$10.00$220.00
2104.511SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT20$2.00$40.00$5.30$106.00$2.45$49.00$2.35$47.00$5.00$100.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT886$2.00$1,772.00$2.25$1,993.50$1.95$1,727.70$2.00$1,772.00$5.00$4,430.00
2105.602TEMPORARY STREAM DIVERSION SYSTEMEACH1$5,400.00$5,400.00$5,550.00$5,550.00$5,700.00$5,700.00$3,500.00$3,500.00$5,000.00$5,000.00
2105.604GEOGRIDSQ YD600$4.50$2,700.00$5.00$3,000.00$2.40$1,440.00$3.30$1,980.00$0.50$300.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD2,072$3.50$7,252.00$3.35$6,941.20$2.25$4,662.00$3.00$6,216.00$0.50$1,036.00
2118.501AGGREGATE SURFACING CLASS 5TON1,591$17.00$27,047.00$17.50$27,842.50$17.00$27,047.00$20.00$31,820.00$20.00$31,820.00
2123.503MOTOR GRADERHOUR31$315.00$9,765.00$175.00$5,425.00$180.00$5,580.00$275.00$8,525.00$100.00$3,100.00
2123.5070.5 CU YD SHOVELHOUR31$200.00$6,200.00$145.00$4,495.00$174.00$5,394.00$260.00$8,060.00$100.00$3,100.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR31$300.00$9,300.00$150.00$4,650.00$180.00$5,580.00$185.00$5,735.00$100.00$3,100.00
2130.501WATERM GALLON60$40.00$2,400.00$60.00$3,600.00$45.00$2,700.00$47.00$2,820.00$60.00$3,600.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON3,403$1.10$3,743.30$1.10$3,743.30$1.05$3,573.15$1.15$3,913.45$1.00$3,403.00
2211.501AGGREGATE BASE CLASS 5TON6,346$8.00$50,768.00$10.60$67,267.60$11.80$74,882.80$17.00$107,882.00$15.00$95,190.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD854$31.00$26,474.00$21.00$17,934.00$32.00$27,328.00$22.80$19,471.20$30.00$25,620.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD29,494$0.50$14,747.00$0.63$18,581.22$0.64$18,876.16$0.50$14,747.00$1.00$29,494.00
2215.501FULL DEPTH RECLAMATIONSQ YD32,033$0.37$11,852.21$0.55$17,618.15$0.54$17,297.82$0.40$12,813.20$1.00$32,033.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,267$4.00$13,068.00$3.94$12,871.98$3.75$12,251.25$3.90$12,741.30$2.00$6,534.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON8,236$3.00$24,708.00$2.99$24,625.64$2.85$23,472.60$3.00$24,708.00$2.00$16,472.00
2356.506BITUMINOUS SEAL COATSQ YD24,956$0.50$12,478.00$0.47$11,729.32$0.45$11,230.20$0.47$11,729.32$2.00$49,912.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,854$2.00$3,708.00$2.40$4,449.60$2.00$3,708.00$2.40$4,449.60$2.00$3,708.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,711$2.00$3,422.00$2.50$4,277.50$2.50$4,277.50$2.40$4,106.40$2.00$3,422.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON6,235$38.80$241,918.00$43.40$270,599.00$42.00$261,870.00$42.00$261,870.00$50.00$311,750.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON167$63.00$10,521.00$70.00$11,690.00$72.00$12,024.00$75.00$12,525.00$100.00$16,700.00
2412.5117X4 PRECAST CONCRETE BOX CULVERTLIN FT54$500.00$27,000.00$700.00$37,800.00$586.00$31,644.00$680.00$36,720.00$1,000.00$54,000.00
2412.5127X4 PRECAST CONCRETE BOX CULV END SECTEACH2$6,000.00$12,000.00$6,500.00$13,000.00$5,767.00$11,534.00$5,500.00$11,000.00$500.00$1,000.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD3,605$16.00$57,680.00$11.55$41,637.75$17.45$62,907.25$12.00$43,260.00$5.00$18,025.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD2,240$23.00$51,520.00$14.45$32,368.00$25.65$57,456.00$28.00$62,720.00$5.00$11,200.00
2451.507GRANULAR BEDDING (CV) (P)CU YD149$25.00$3,725.00$30.00$4,470.00$39.00$5,811.00$35.00$5,215.00$5.00$745.00
2501.51124" RC PIPE CULVERTLIN FT106$40.00$4,240.00$70.00$7,420.00$66.25$7,022.50$51.00$5,406.00$50.00$5,300.00
2501.51118" RC PIPE CULVERTLIN FT216$34.00$7,344.00$58.00$12,528.00$61.45$13,273.20$41.00$8,856.00$50.00$10,800.00
2501.51524" RC PIPE APRONEACH4$600.00$2,400.00$610.00$2,440.00$663.00$2,652.00$780.00$3,120.00$500.00$2,000.00
2501.51518" RC PIPE APRONEACH10$530.00$5,300.00$550.00$5,500.00$561.00$5,610.00$680.00$6,800.00$500.00$5,000.00
2531.5077" CONCRETE DRIVEWAY PAVEMENTSQ YD22$100.00$2,200.00$122.40$2,692.80$97.00$2,134.00$96.00$2,112.00$50.00$1,100.00
2540.602MAIL BOX SUPPORTEACH51$130.00$6,630.00$131.25$6,693.75$125.00$6,375.00$130.00$6,630.00$150.00$7,650.00
2563.601TRAFFIC CONTROLLUMP SUM1$6,700.00$6,700.00$8,000.00$8,000.00$10,246.00$10,246.00$11,500.00$11,500.00$5,000.00$5,000.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$510.00$510.00$525.00$525.00$500.00$500.00$600.00$600.00$5,000.00$5,000.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT1,695$4.50$7,627.50$6.30$10,678.50$4.25$7,203.75$3.40$5,763.00$1.25$2,118.75
2575.572RAPID STABILIZATION METHOD 4SQ YD2,219$2.00$4,438.00$2.50$5,547.50$1.55$3,439.45$1.50$3,328.50$2.00$4,438.00
2577.504GRANULAR CHANNEL LINER (P)CU YD19$170.00$3,230.00$52.89$1,004.91$48.95$930.05$95.00$1,805.00$30.00$570.00
2580.603INTERIM PAVEMENT MARKINGLIN FT22,752$0.12$2,730.24$0.10$2,275.20$0.15$3,412.80$0.13$2,957.76$0.30$6,825.60
2580.603INTERIM PAVEMENT MARKINGLIN FT22,752$0.12$2,730.24$0.09$2,047.68$0.20$4,550.40$0.09$2,047.68$0.20$4,550.40
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT7,246$0.20$1,449.20$0.05$362.30$0.20$1,449.20$0.20$1,449.20$0.20$1,449.20
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT1,120$0.10$112.00$0.11$123.20$0.10$112.00$0.13$145.60$0.10$112.00
2582.50224" SOLID LINE WHITE-PAINTLIN FT38$4.30$163.40$3.47$131.86$3.30$125.40$4.10$155.80$0.10$3.80
2582.5026" SOLID LINE WHITE-EPOXYLIN FT19,907$0.30$5,972.10$0.08$1,592.56$0.26$5,175.82$0.28$5,573.96$0.10$1,990.70
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,890$0.05$94.50$0.05$94.50$0.05$94.50$0.06$113.40$0.10$189.00
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT1,120$0.41$459.20$0.11$123.20$0.40$448.00$0.40$448.00$0.20$224.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT19,907$0.08$1,592.56$0.08$1,592.56$0.08$1,592.56$0.09$1,791.63$0.10$1,990.70
2582.5024" SOLID LINE YELLOW-PAINTLIN FT7,246$0.05$362.30$0.05$362.30$0.05$362.30$0.06$434.76$0.10$724.60
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,890$0.20$378.00$0.05$94.50$0.20$378.00$0.20$378.00$0.10$189.00
2582.50224" SOLID LINE WHITE-EPOXYLIN FT38$10.00$380.00$3.47$131.86$7.00$266.00$9.20$349.60$0.10$3.80
 Totals for project CP 0002-261283 $730,288.75 $760,787.74 $822,392.26 $819,177.36 $1,222,128.55
 
CP 0280-153456 TST - CP 0280-153456 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,460.00$6,460.00$15,000.00$15,000.00$20,000.00$20,000.00$5,000.00$5,000.00$400,000.00$400,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$850.00$850.00$1,500.00$1,500.00$1,000.00$1,000.00$1,050.00$1,050.00$5,000.00$5,000.00
2104.501REMOVE PIPE CULVERTSLIN FT175$14.00$2,450.00$15.00$2,625.00$12.60$2,205.00$26.00$4,550.00$5.00$875.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,873$5.50$10,301.50$3.40$6,368.20$3.30$6,180.90$4.00$7,492.00$5.00$9,365.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT670$2.00$1,340.00$2.25$1,507.50$1.95$1,306.50$2.00$1,340.00$5.00$3,350.00
2105.602TEMPORARY STREAM DIVERSION SYSTEMEACH1$7,200.00$7,200.00$5,500.00$5,500.00$3,352.00$3,352.00$3,500.00$3,500.00$5.00$5.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD627$4.00$2,508.00$3.35$2,100.45$2.25$1,410.75$3.00$1,881.00$1.00$627.00
2105.604GEOGRIDSQ YD225$5.00$1,125.00$5.00$1,125.00$2.40$540.00$3.40$765.00$1.00$225.00
2118.501AGGREGATE SURFACING CLASS 5TON1,809$15.00$27,135.00$13.50$24,421.50$17.00$30,753.00$20.00$36,180.00$25.00$45,225.00
2123.503MOTOR GRADERHOUR38$315.00$11,970.00$175.00$6,650.00$180.00$6,840.00$275.00$10,450.00$100.00$3,800.00
2123.5070.5 CU YD SHOVELHOUR38$260.00$9,880.00$145.00$5,510.00$174.00$6,612.00$260.00$9,880.00$100.00$3,800.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR38$300.00$11,400.00$145.00$5,510.00$180.00$6,840.00$185.00$7,030.00$100.00$3,800.00
2130.501WATERM GALLON75$40.00$3,000.00$33.00$2,475.00$45.00$3,375.00$47.00$3,525.00$60.00$4,500.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON4,157$1.10$4,572.70$1.10$4,572.70$1.05$4,364.85$1.15$4,780.55$1.00$4,157.00
2211.501AGGREGATE BASE CLASS 5TON7,236$8.00$57,888.00$9.40$68,018.40$11.80$85,384.80$17.00$123,012.00$15.00$108,540.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD259$34.00$8,806.00$25.00$6,475.00$31.00$8,029.00$30.00$7,770.00$30.00$7,770.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD36,022$0.50$18,011.00$0.61$21,973.42$0.64$23,054.08$0.47$16,930.34$1.00$36,022.00
2215.501FULL DEPTH RECLAMATIONSQ YD37,329$0.36$13,438.44$0.55$20,530.95$0.54$20,157.66$0.40$14,931.60$1.00$37,329.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,658$4.00$14,632.00$3.95$14,449.10$3.75$13,717.50$3.90$14,266.20$2.00$7,316.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON9,144$3.00$27,432.00$2.99$27,340.56$2.85$26,060.40$3.00$27,432.00$2.00$18,288.00
2356.506BITUMINOUS SEAL COATSQ YD27,709$0.50$13,854.50$0.47$13,023.23$0.45$12,469.05$0.47$13,023.23$2.00$55,418.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON2,148$2.00$4,296.00$2.40$5,155.20$2.00$4,296.00$2.40$5,155.20$2.00$4,296.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON2,116$2.00$4,232.00$2.50$5,290.00$2.50$5,290.00$2.60$5,501.60$2.00$4,232.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON7,112$39.00$277,368.00$44.90$319,328.80$42.00$298,704.00$42.00$298,704.00$52.00$369,824.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON258$57.50$14,835.00$70.00$18,060.00$72.00$18,576.00$75.00$19,350.00$80.00$20,640.00
2412.5117X3 PRECAST CONCRETE BOX CULVERTLIN FT44$525.00$23,100.00$675.00$29,700.00$213.00$9,372.00$510.00$22,440.00$500.00$22,000.00
2412.5127X3 PRECAST CONCRETE BOX CULVERT END SECTIONEACH2$4,800.00$9,600.00$5,650.00$11,300.00$1,990.50$3,981.00$4,500.00$9,000.00$500.00$1,000.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD919$12.00$11,028.00$11.55$10,614.45$17.45$16,036.55$12.00$11,028.00$10.00$9,190.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD536$22.00$11,792.00$14.45$7,745.20$25.65$13,748.40$29.00$15,544.00$5.00$2,680.00
2451.507GRANULAR BEDDING (CV) (P)CU YD46$33.00$1,518.00$31.00$1,426.00$39.05$1,796.30$41.00$1,886.00$5.00$230.00
2501.51118" RC PIPE CULVERTLIN FT68$36.00$2,448.00$70.00$4,760.00$61.85$4,205.80$49.00$3,332.00$50.00$3,400.00
2501.51518" RC PIPE APRONEACH4$900.00$3,600.00$550.00$2,200.00$559.00$2,236.00$670.00$2,680.00$500.00$2,000.00
2540.602MAIL BOX SUPPORTEACH42$130.00$5,460.00$135.00$5,670.00$125.00$5,250.00$130.00$5,460.00$150.00$6,300.00
2563.601TRAFFIC CONTROLLUMP SUM1$5,500.00$5,500.00$6,500.00$6,500.00$8,300.00$8,300.00$10,500.00$10,500.00$10,000.00$10,000.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$510.00$510.00$525.00$525.00$500.00$500.00$600.00$600.00$5,000.00$5,000.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT576$5.00$2,880.00$6.60$3,801.60$4.25$2,448.00$3.40$1,958.40$1.25$720.00
2575.572RAPID STABILIZATION METHOD 4SQ YD498$2.00$996.00$4.28$2,131.44$1.55$771.90$1.60$796.80$5.00$2,490.00
2580.603INTERIM PAVEMENT MARKINGLIN FT29,758$0.15$4,463.70$0.10$2,975.80$0.20$5,951.60$0.09$2,678.22$0.30$8,927.40
2580.603INTERIM PAVEMENT MARKINGLIN FT29,758$0.12$3,570.96$0.10$2,975.80$0.15$4,463.70$0.13$3,868.54$0.30$8,927.40
2582.5026" SOLID LINE WHITE-EPOXYLIN FT24,448$0.30$7,334.40$0.08$1,955.84$0.26$6,356.48$0.28$6,845.44$0.10$2,444.80
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,930$0.20$386.00$0.05$96.50$0.20$386.00$0.20$386.00$0.10$193.00
2582.5024" SOLID LINE YELLOW-PAINTLIN FT6,917$0.05$345.85$0.05$345.85$0.05$345.85$0.06$415.02$0.10$691.70
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT3,016$0.10$301.60$0.11$331.76$0.10$301.60$0.13$392.08$0.20$603.20
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT6,917$0.20$1,383.40$0.05$345.85$0.20$1,383.40$0.20$1,383.40$0.10$691.70
2582.50224" SOLID LINE WHITE-PAINTLIN FT40$3.37$134.80$3.50$140.00$3.30$132.00$4.10$164.00$0.10$4.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT24,448$0.08$1,955.84$0.08$1,955.84$0.08$1,955.84$0.09$2,200.32$0.10$2,444.80
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT3,016$0.50$1,508.00$0.11$331.76$0.40$1,206.40$0.40$1,206.40$0.20$603.20
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,930$0.05$96.50$0.05$96.50$0.05$96.50$0.06$115.80$0.10$193.00
2582.50224" SOLID LINE WHITE-EPOXYLIN FT40$7.50$300.00$3.47$138.80$7.00$280.00$9.20$368.00$0.10$4.00
 Totals for project CP 0280-153456 TST $655,198.19 $702,574.00 $702,023.81 $748,748.14 $1,245,142.20
 
CP 0289-153458 TST - CP 0289-153458 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Hawkinson Construction Co., Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,500.00$6,500.00$15,000.00$15,000.00$15,000.00$15,000.00$5,000.00$5,000.00$100,000.00$100,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$800.00$800.00$1,500.00$1,500.00$1,000.00$1,000.00$1,050.00$1,050.00$5,000.00$5,000.00
2104.501REMOVE PIPE CULVERTSLIN FT78$17.00$1,326.00$12.00$936.00$12.60$982.80$25.00$1,950.00$5.00$390.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD925$5.00$4,625.00$3.25$3,006.25$3.35$3,098.75$6.50$6,012.50$5.00$4,625.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT396$2.00$792.00$2.25$891.00$2.05$811.80$2.00$792.00$5.00$1,980.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD265$4.00$1,060.00$3.35$887.75$2.25$596.25$3.00$795.00$5.00$1,325.00
2105.604GEOGRIDSQ YD150$6.00$900.00$5.00$750.00$2.40$360.00$3.40$510.00$1.00$150.00
2118.501AGGREGATE SURFACING CLASS 5TON836$16.00$13,376.00$16.89$14,120.04$17.00$14,212.00$20.50$17,138.00$20.00$16,720.00
2123.503MOTOR GRADERHOUR16$310.00$4,960.00$175.00$2,800.00$180.00$2,880.00$275.00$4,400.00$100.00$1,600.00
2123.5070.5 CU YD SHOVELHOUR16$260.00$4,160.00$145.00$2,320.00$174.00$2,784.00$260.00$4,160.00$100.00$1,600.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR16$300.00$4,800.00$150.00$2,400.00$180.00$2,880.00$185.00$2,960.00$100.00$1,600.00
2130.501WATERM GALLON30$41.00$1,230.00$32.00$960.00$45.00$1,350.00$47.00$1,410.00$60.00$1,800.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON1,750$1.10$1,925.00$1.10$1,925.00$1.05$1,837.50$1.15$2,012.50$1.00$1,750.00
2211.501AGGREGATE BASE CLASS 5TON3,504$7.50$26,280.00$9.45$33,112.80$11.80$41,347.20$17.00$59,568.00$15.00$52,560.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD110$39.00$4,290.00$32.00$3,520.00$31.00$3,410.00$29.00$3,190.00$30.00$3,300.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD15,164$0.50$7,582.00$0.63$9,553.32$0.75$11,373.00$0.47$7,127.08$1.00$15,164.00
2215.501FULL DEPTH RECLAMATIONSQ YD15,467$0.41$6,341.47$0.55$8,506.85$0.70$10,826.90$0.42$6,496.14$1.00$15,467.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON1,540$4.00$6,160.00$3.95$6,083.00$3.75$5,775.00$3.90$6,006.00$2.00$3,080.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON3,850$3.00$11,550.00$2.99$11,511.50$2.85$10,972.50$3.00$11,550.00$2.00$7,700.00
2356.506BITUMINOUS SEAL COATSQ YD11,664$0.50$5,832.00$0.47$5,482.08$0.45$5,248.80$0.47$5,482.08$2.00$23,328.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON903$2.00$1,806.00$2.40$2,167.20$2.00$1,806.00$2.40$2,167.20$2.00$1,806.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON883$2.00$1,766.00$2.50$2,207.50$2.50$2,207.50$2.50$2,207.50$2.00$1,766.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON3,040$39.00$118,560.00$45.00$136,800.00$44.00$133,760.00$42.00$127,680.00$50.00$152,000.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON161$61.00$9,821.00$70.00$11,270.00$72.00$11,592.00$80.00$12,880.00$80.00$12,880.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD247$16.00$3,952.00$17.00$4,199.00$17.50$4,322.50$12.00$2,964.00$10.00$2,470.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD123$26.00$3,198.00$20.00$2,460.00$25.65$3,154.95$28.00$3,444.00$5.00$615.00
2451.507GRANULAR BEDDING (CV) (P)CU YD24$36.00$864.00$46.00$1,104.00$38.95$934.80$35.00$840.00$5.00$120.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT64$54.00$3,456.00$85.00$5,440.00$90.50$5,792.00$78.00$4,992.00$100.00$6,400.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH4$900.00$3,600.00$600.00$2,400.00$556.25$2,225.00$660.00$2,640.00$150.00$600.00
2540.602MAIL BOX SUPPORTEACH31$130.00$4,030.00$135.00$4,185.00$125.00$3,875.00$130.00$4,030.00$125.00$3,875.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$510.00$510.00$525.00$525.00$500.00$500.00$600.00$600.00$5,000.00$5,000.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,500.00$3,500.00$4,500.00$4,500.00$5,400.00$5,400.00$8,500.00$8,500.00$10,000.00$10,000.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT249$5.00$1,245.00$6.60$1,643.40$4.95$1,232.55$3.40$846.60$125.00$31,125.00
2575.572RAPID STABILIZATION METHOD 4SQ YD144$2.00$288.00$4.28$616.32$1.85$266.40$1.60$230.40$3.00$432.00
2580.603INTERIM PAVEMENT MARKINGLIN FT17,360$0.12$2,083.20$0.10$1,736.00$0.20$3,472.00$0.09$1,562.40$0.30$5,208.00
2580.603INTERIM PAVEMENT MARKINGLIN FT17,360$0.12$2,083.20$0.10$1,736.00$0.15$2,604.00$0.13$2,256.80$0.30$5,208.00
2582.5026" SOLID LINE WHITE-EPOXYLIN FT10,261$0.27$2,770.47$0.08$820.88$0.26$2,667.86$0.28$2,873.08$0.10$1,026.10
2582.50224" SOLID LINE WHITE-EPOXYLIN FT60$7.50$450.00$3.47$208.20$7.00$420.00$9.10$546.00$0.10$6.00
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT1,780$0.20$356.00$0.05$89.00$0.20$356.00$0.20$356.00$0.10$178.00
2582.50224" SOLID LINE WHITE-PAINTLIN FT60$4.00$240.00$3.50$210.00$3.30$198.00$4.10$246.00$0.10$6.00
2582.5024" SOLID LINE YELLOW-PAINTLIN FT1,780$0.05$89.00$0.05$89.00$0.05$89.00$0.06$106.80$0.10$178.00
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT400$0.20$80.00$0.05$20.00$0.20$80.00$0.20$80.00$0.10$40.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT10,261$0.08$820.88$0.08$820.88$0.08$820.88$0.09$923.49$0.10$1,026.10
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT3,250$0.10$325.00$0.11$357.50$0.10$325.00$0.13$422.50$0.20$650.00
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT400$0.05$20.00$0.05$20.00$0.05$20.00$0.06$24.00$0.10$40.00
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT3,250$0.41$1,332.50$0.11$357.50$0.40$1,300.00$0.40$1,300.00$0.20$650.00
 Totals for project CP 0289-153458 TST $281,735.72 $311,247.97 $326,167.94 $332,328.07 $502,444.20
 
Contract Total:$2,712,795.42$2,977,060.82$3,055,442.49$3,133,395.31$5,042,212.70