Contract Bid Abstract

CP 0223-244397 TST - CP 0223-244397 TST (Low) - Reclaim & Overlay/CulvertsUlland Brothers, Inc. Hawkinson Construction Co., Inc KGM Contractors, Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$25,740.00$25,740.00$39,000.00$39,000.00$55,000.00$55,000.00$10,000.00$10,000.00$32,000.00$32,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$2,000.00$2,000.00$2,000.00$2,000.00$2,500.00$2,500.00$2,100.00$2,100.00$15,000.00$15,000.00
2021.601RAILROAD PROTECTIVE SERVICESLUMP SUM1$5,000.00$5,000.00$6,900.00$6,900.00$11,500.00$11,500.00$5,500.00$5,500.00$5,500.00$5,500.00
2104.501REMOVE PIPE CULVERTSLIN FT578$11.00$6,358.00$11.00$6,358.00$10.00$5,780.00$22.00$12,716.00$15.00$8,670.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD2,368$3.00$7,104.00$3.00$7,104.00$3.75$8,880.00$2.00$4,736.00$6.00$14,208.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT1,306$1.50$1,959.00$1.50$1,959.00$2.75$3,591.50$1.40$1,828.40$1.40$1,828.40
2105.604GEOTEXTILE FABRIC TYPE VISQ YD2,520$3.00$7,560.00$3.00$7,560.00$3.05$7,686.00$2.40$6,048.00$2.00$5,040.00
2105.604GEOGRIDSQ YD1,050$3.50$3,675.00$3.50$3,675.00$4.90$5,145.00$3.00$3,150.00$3.00$3,150.00
2118.501AGGREGATE SURFACING CLASS 5TON1,516$20.00$30,320.00$15.40$23,346.40$15.60$23,649.60$25.00$37,900.00$19.00$28,804.00
2123.503MOTOR GRADERHOUR39$300.00$11,700.00$180.00$7,020.00$175.00$6,825.00$250.00$9,750.00$126.00$4,914.00
2123.5070.5 CU YD SHOVELHOUR20$300.00$6,000.00$300.00$6,000.00$250.00$5,000.00$285.00$5,700.00$175.00$3,500.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR39$300.00$11,700.00$180.00$7,020.00$145.00$5,655.00$185.00$7,215.00$107.00$4,173.00
2130.501WATERM GALLON100$50.00$5,000.00$45.00$4,500.00$29.00$2,900.00$46.00$4,600.00$60.00$6,000.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON6,053$1.10$6,658.30$1.10$6,658.30$1.10$6,658.30$1.10$6,658.30$1.35$8,171.55
2211.501AGGREGATE BASE CLASS 5TON2,690$9.50$25,555.00$10.30$27,707.00$12.30$33,087.00$15.00$40,350.00$10.50$28,245.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD421$26.00$10,946.00$26.00$10,946.00$21.50$9,051.50$30.00$12,630.00$33.00$13,893.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD44,968$0.40$17,987.20$0.67$30,128.56$0.58$26,081.44$0.40$17,987.20$0.50$22,484.00
2215.501FULL DEPTH RECLAMATIONSQ YD49,408$0.40$19,763.20$0.54$26,680.32$0.56$27,668.48$0.41$20,257.28$0.47$23,221.76
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON4,982$3.50$17,437.00$3.50$17,437.00$3.68$18,333.76$3.65$18,184.30$2.53$12,604.46
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON12,898$3.00$38,694.00$3.00$38,694.00$3.15$40,628.70$3.10$39,983.80$2.53$32,631.94
2356.506BITUMINOUS SEAL COATSQ YD39,084$0.45$17,587.80$0.45$17,587.80$0.47$18,369.48$0.47$18,369.48$0.69$26,967.96
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON2,755$2.00$5,510.00$1.80$4,959.00$2.25$6,198.75$2.20$6,061.00$1.30$3,581.50
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,280$2.00$2,560.00$2.20$2,816.00$2.40$3,072.00$2.60$3,328.00$2.50$3,200.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON9,440$39.70$374,768.00$37.40$353,056.00$39.00$368,160.00$40.00$377,600.00$44.30$418,192.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON63$150.00$9,450.00$76.00$4,788.00$70.00$4,410.00$100.00$6,300.00$91.00$5,733.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD2,364$12.00$28,368.00$12.00$28,368.00$11.25$26,595.00$13.00$30,732.00$10.00$23,640.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD1,793$18.00$32,274.00$18.00$32,274.00$14.75$26,446.75$26.00$46,618.00$25.00$44,825.00
2451.507GRANULAR BEDDING (CV) (P)CU YD180$15.00$2,700.00$15.00$2,700.00$25.00$4,500.00$35.00$6,300.00$25.00$4,500.00
2501.51518" RC PIPE APRONEACH8$400.00$3,200.00$400.00$3,200.00$550.00$4,400.00$650.00$5,200.00$635.00$5,080.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT324$52.00$16,848.00$52.00$16,848.00$80.00$25,920.00$70.00$22,680.00$100.00$32,400.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH20$400.00$8,000.00$400.00$8,000.00$550.00$11,000.00$650.00$13,000.00$627.00$12,540.00
2501.56118" RC PIPE CULVERT DES 3006LIN FT152$37.00$5,624.00$37.00$5,624.00$60.00$9,120.00$60.00$9,120.00$71.50$10,868.00
2540.602MAIL BOX SUPPORTEACH42$130.00$5,460.00$130.00$5,460.00$136.50$5,733.00$135.00$5,670.00$131.00$5,502.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$400.00$400.00$400.00$400.00$1,000.00$1,000.00$1,100.00$1,100.00$400.00$400.00
2563.601TRAFFIC CONTROLLUMP SUM1$4,900.00$4,900.00$6,000.00$6,000.00$5,300.00$5,300.00$21,700.00$21,700.00$4,900.00$4,900.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$600.00$600.00$600.00$600.00$1,200.00$1,200.00$450.00$450.00$600.00$600.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT2,163$3.00$6,489.00$3.00$6,489.00$4.44$9,603.72$3.10$6,705.30$3.00$6,489.00
2575.572RAPID STABILIZATION METHOD 4SQ YD1,566$1.80$2,818.80$1.80$2,818.80$2.22$3,476.52$1.90$2,975.40$1.60$2,505.60
2580.603INTERIM PAVEMENT MARKINGLIN FT48,432$0.11$5,327.52$0.10$4,843.20$0.10$4,843.20$0.17$8,233.44$0.16$7,749.12
2580.603INTERIM PAVEMENT MARKINGLIN FT48,432$0.11$5,327.52$0.20$9,686.40$0.10$4,843.20$0.17$8,233.44$0.10$4,843.20
2582.501PAVT MSSG (RR XING) PAINTEACH2$150.00$300.00$150.00$300.00$157.50$315.00$152.00$304.00$227.73$455.46
2582.501PAVT MSSG (RR XING) EPOXYEACH2$650.00$1,300.00$650.00$1,300.00$682.50$1,365.00$660.00$1,320.00$581.98$1,163.96
2582.50224" SOLID LINE WHITE-PAINTLIN FT172$2.80$481.60$2.80$481.60$2.94$505.68$2.85$490.20$4.05$696.60
2582.5026" SOLID LINE WHITE-PAINTLIN FT30,424$0.07$2,129.68$0.08$2,433.92$0.08$2,433.92$0.08$2,433.92$0.07$2,129.68
2582.5024" SOLID LINE YELLOW-PAINTLIN FT5,310$0.06$318.60$0.06$318.60$0.06$318.60$0.06$318.60$0.05$265.50
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,360$0.06$81.60$0.06$81.60$0.06$81.60$0.06$81.60$0.05$68.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT8,773$0.12$1,052.76$0.12$1,052.76$0.13$1,140.49$0.13$1,140.49$0.10$877.30
2582.50224" SOLID LINE WHITE-EPOXYLIN FT172$7.00$1,204.00$7.00$1,204.00$7.35$1,264.20$7.20$1,238.40$7.09$1,219.48
2582.5026" SOLID LINE WHITE-EPOXYLIN FT30,424$0.25$7,606.00$0.25$7,606.00$0.27$8,214.48$0.26$7,910.24$0.28$8,518.72
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT5,310$0.20$1,062.00$0.20$1,062.00$0.21$1,115.10$0.21$1,115.10$0.21$1,115.10
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,360$0.20$272.00$0.20$272.00$0.21$285.60$0.21$285.60$0.21$285.60
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT8,773$0.40$3,509.20$0.40$3,509.20$0.42$3,684.66$0.41$3,596.93$0.43$3,772.39
 Totals for project CP 0223-244397 TST $818,686.78 $816,833.46 $870,537.23 $887,905.42 $919,123.28
 
CP 0297-284942 TST - CP 0297-284942 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. Hawkinson Construction Co., Inc KGM Contractors, Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$1,400.00$1,400.00$8,700.00$8,700.00$5,300.00$5,300.00$4,000.00$4,000.00$9,000.00$9,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$2,000.00$2,000.00$2,000.00$2,000.00$2,500.00$2,500.00$2,100.00$2,100.00$5,000.00$5,000.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD65$7.00$455.00$4.90$318.50$6.00$390.00$6.00$390.00$16.00$1,040.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT201$2.00$402.00$1.75$351.75$3.00$603.00$2.00$402.00$1.80$361.80
2118.501AGGREGATE SURFACING CLASS 5TON773$20.00$15,460.00$16.30$12,599.90$16.60$12,831.80$23.00$17,779.00$20.00$15,460.00
2123.503MOTOR GRADERHOUR15$300.00$4,500.00$180.00$2,700.00$175.00$2,625.00$250.00$3,750.00$126.00$1,890.00
2123.5070.5 CU YD SHOVELHOUR5$300.00$1,500.00$300.00$1,500.00$250.00$1,250.00$285.00$1,425.00$175.00$875.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR15$300.00$4,500.00$180.00$2,700.00$145.00$2,175.00$185.00$2,775.00$107.00$1,605.00
2130.501WATERM GALLON33$45.00$1,485.00$45.00$1,485.00$29.00$957.00$46.00$1,518.00$60.00$1,980.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON1,911$1.10$2,102.10$1.10$2,102.10$1.10$2,102.10$1.10$2,102.10$1.35$2,579.85
2211.501AGGREGATE BASE CLASS 5TON272$8.00$2,176.00$11.30$3,073.60$14.80$4,025.60$16.50$4,488.00$11.50$3,128.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD16,468$0.40$6,587.20$0.74$12,186.32$0.58$9,551.44$0.40$6,587.20$0.50$8,234.00
2215.501FULL DEPTH RECLAMATIONSQ YD17,734$0.40$7,093.60$0.58$10,285.72$0.56$9,931.04$0.40$7,093.60$0.48$8,512.32
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON1,834$3.50$6,419.00$3.50$6,419.00$3.68$6,749.12$3.65$6,694.10$2.53$4,640.02
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON4,752$3.00$14,256.00$3.00$14,256.00$3.15$14,968.80$3.10$14,731.20$2.53$12,022.56
2356.506BITUMINOUS SEAL COATSQ YD14,398$0.45$6,479.10$0.45$6,479.10$0.47$6,767.06$0.47$6,767.06$0.69$9,934.62
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON969$2.00$1,938.00$1.80$1,744.20$2.25$2,180.25$2.20$2,131.80$1.30$1,259.70
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON676$2.00$1,352.00$2.20$1,487.20$2.40$1,622.40$2.60$1,757.60$2.50$1,690.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON3,298$39.00$128,622.00$38.00$125,324.00$41.50$136,867.00$41.00$135,218.00$43.79$144,419.42
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON11$145.00$1,595.00$76.00$836.00$70.00$770.00$100.00$1,100.00$109.00$1,199.00
2540.602MAIL BOX SUPPORTEACH17$130.00$2,210.00$130.00$2,210.00$136.50$2,320.50$135.00$2,295.00$130.00$2,210.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,200.00$2,200.00$3,000.00$3,000.00$2,900.00$2,900.00$4,600.00$4,600.00$2,200.00$2,200.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$400.00$400.00$400.00$400.00$1,000.00$1,000.00$1,100.00$1,100.00$400.00$400.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$600.00$600.00$600.00$600.00$1,200.00$1,200.00$450.00$450.00$600.00$600.00
2580.603INTERIM PAVEMENT MARKINGLIN FT11,370$0.11$1,250.70$0.10$1,137.00$0.10$1,137.00$0.17$1,932.90$0.16$1,819.20
2580.603INTERIM PAVEMENT MARKINGLIN FT11,370$0.11$1,250.70$0.20$2,274.00$0.10$1,137.00$0.17$1,932.90$0.10$1,137.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT11,275$0.07$789.25$0.08$902.00$0.08$902.00$0.08$902.00$0.07$789.25
2582.5024" SOLID LINE YELLOW-PAINTLIN FT3,621$0.06$217.26$0.06$217.26$0.06$217.26$0.06$217.26$0.05$181.05
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,060$0.06$63.60$0.06$63.60$0.06$63.60$0.06$63.60$0.05$53.00
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT502$0.12$60.24$0.12$60.24$0.13$65.26$0.13$65.26$0.10$50.20
2582.5026" SOLID LINE WHITE-EPOXYLIN FT11,275$0.25$2,818.75$0.25$2,818.75$0.27$3,044.25$0.26$2,931.50$0.28$3,157.00
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT3,621$0.20$724.20$0.20$724.20$0.21$760.41$0.21$760.41$0.21$760.41
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,060$0.20$212.00$0.20$212.00$0.21$222.60$0.21$222.60$0.21$222.60
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT502$0.40$200.80$0.40$200.80$0.42$210.84$0.42$210.84$0.43$215.86
2582.603PROTECT PAVEMENT MARKINGSLIN FT17$10.00$170.00$10.00$170.00$10.50$178.50$0.01$0.17$10.12$172.04
 Totals for project CP 0297-284942 TST $223,489.50 $231,538.24 $239,525.83 $240,494.10 $248,798.90
 
CP 0897-276912 TST - CP 0897-276912 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. Hawkinson Construction Co., Inc KGM Contractors, Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$24,564.00$24,564.00$25,650.00$25,650.00$15,000.00$15,000.00$10,000.00$10,000.00$26,500.00$26,500.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$2,000.00$2,000.00$2,000.00$2,000.00$2,500.00$2,500.00$2,100.00$2,100.00$5,000.00$5,000.00
2104.501REMOVE PIPE CULVERTSLIN FT449$11.00$4,939.00$11.00$4,939.00$10.00$4,490.00$22.00$9,878.00$15.00$6,735.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,521$3.00$4,563.00$3.00$4,563.00$5.25$7,985.25$3.00$4,563.00$6.50$9,886.50
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT698$2.00$1,396.00$1.50$1,047.00$3.00$2,094.00$1.60$1,116.80$1.40$977.20
2105.604GEOTEXTILE FABRIC TYPE VISQ YD1,462$3.00$4,386.00$3.00$4,386.00$3.35$4,897.70$2.50$3,655.00$2.00$2,924.00
2105.604GEOGRIDSQ YD675$3.50$2,362.50$3.50$2,362.50$4.90$3,307.50$3.00$2,025.00$3.00$2,025.00
2106.607GRANULAR EMBANKMENT (CV) (P)CU YD119$18.00$2,142.00$18.00$2,142.00$20.00$2,380.00$35.00$4,165.00$30.00$3,570.00
2118.501AGGREGATE SURFACING CLASS 5TON986$21.95$21,642.70$16.90$16,663.40$18.00$17,748.00$22.00$21,692.00$20.00$19,720.00
2123.503MOTOR GRADERHOUR18$300.00$5,400.00$180.00$3,240.00$175.00$3,150.00$250.00$4,500.00$126.00$2,268.00
2123.5070.5 CU YD SHOVELHOUR15$300.00$4,500.00$300.00$4,500.00$250.00$3,750.00$285.00$4,275.00$175.00$2,625.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR18$300.00$5,400.00$180.00$3,240.00$145.00$2,610.00$185.00$3,330.00$107.00$1,926.00
2130.501WATERM GALLON40$45.00$1,800.00$45.00$1,800.00$29.00$1,160.00$46.00$1,840.00$60.00$2,400.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON2,345$1.10$2,579.50$1.10$2,579.50$1.10$2,579.50$1.10$2,579.50$1.35$3,165.75
2211.501AGGREGATE BASE CLASS 5TON100$10.00$1,000.00$15.10$1,510.00$13.60$1,360.00$31.00$3,100.00$15.00$1,500.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD260$26.00$6,760.00$26.00$6,760.00$25.00$6,500.00$31.00$8,060.00$33.40$8,684.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD20,320$0.40$8,128.00$0.69$14,020.80$0.58$11,785.60$0.40$8,128.00$0.50$10,160.00
2215.501FULL DEPTH RECLAMATIONSQ YD22,198$0.40$8,879.20$0.54$11,986.92$0.56$12,430.88$0.54$11,986.92$0.48$10,655.04
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON2,250$3.50$7,875.00$3.50$7,875.00$3.68$8,280.00$3.65$8,212.50$2.53$5,692.50
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON5,828$3.00$17,484.00$3.00$17,484.00$3.15$18,358.20$3.10$18,066.80$2.53$14,744.84
2356.506BITUMINOUS SEAL COATSQ YD17,662$0.45$7,947.90$0.45$7,947.90$0.47$8,301.14$0.47$8,301.14$0.69$12,186.78
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,214$2.00$2,428.00$1.80$2,185.20$2.25$2,731.50$2.20$2,670.80$1.30$1,578.20
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON855$2.00$1,710.00$2.20$1,881.00$2.40$2,052.00$2.50$2,137.50$2.50$2,137.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON4,188$39.50$165,426.00$38.90$162,913.20$39.00$163,332.00$42.00$175,896.00$45.58$190,889.04
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON29$145.00$4,205.00$78.00$2,262.00$70.00$2,030.00$120.00$3,480.00$91.00$2,639.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD2,313$13.00$30,069.00$13.00$30,069.00$11.25$26,021.25$14.00$32,382.00$10.00$23,130.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD863$18.00$15,534.00$18.00$15,534.00$14.75$12,729.25$34.00$29,342.00$30.00$25,890.00
2451.507GRANULAR BEDDING (CV) (P)CU YD249$15.00$3,735.00$15.00$3,735.00$25.00$6,225.00$38.00$9,462.00$30.00$7,470.00
2501.51548" RC PIPE APRONEACH2$1,000.00$2,000.00$1,000.00$2,000.00$1,500.00$3,000.00$2,500.00$5,000.00$1,720.00$3,440.00
2501.51518" RC PIPE APRONEACH4$400.00$1,600.00$400.00$1,600.00$550.00$2,200.00$650.00$2,600.00$784.00$3,136.00
2501.51536" RC PIPE APRONEACH2$700.00$1,400.00$700.00$1,400.00$1,250.00$2,500.00$1,500.00$3,000.00$1,012.00$2,024.00
2501.52128" SPAN RC PIPE-ARCH CULV CL IIALIN FT30$62.00$1,860.00$62.00$1,860.00$93.00$2,790.00$78.00$2,340.00$92.00$2,760.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT128$52.00$6,656.00$52.00$6,656.00$80.00$10,240.00$68.00$8,704.00$91.00$11,648.00
2501.52528" SPAN CAS PIPE-ARCH APRONEACH2$500.00$1,000.00$500.00$1,000.00$600.00$1,200.00$900.00$1,800.00$675.00$1,350.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH8$450.00$3,600.00$450.00$3,600.00$550.00$4,400.00$900.00$7,200.00$630.00$5,040.00
2501.56136" RC PIPE CULVERT DES 3006LIN FT40$66.00$2,640.00$66.00$2,640.00$115.00$4,600.00$95.00$3,800.00$123.00$4,920.00
2501.56148" RC PIPE CULVERT DES 3006LIN FT76$168.00$12,768.00$168.00$12,768.00$175.00$13,300.00$145.00$11,020.00$178.00$13,528.00
2501.56118" RC PIPE CULVERT DES 3006LIN FT96$37.00$3,552.00$37.00$3,552.00$55.00$5,280.00$60.00$5,760.00$71.00$6,816.00
2540.602MAIL BOX SUPPORTEACH20$130.00$2,600.00$130.00$2,600.00$136.50$2,730.00$135.00$2,700.00$130.00$2,600.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$600.00$600.00$600.00$600.00$1,200.00$1,200.00$450.00$450.00$600.00$600.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$400.00$400.00$400.00$400.00$1,000.00$1,000.00$1,100.00$1,100.00$400.00$400.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,900.00$3,900.00$5,000.00$5,000.00$4,500.00$4,500.00$12,500.00$12,500.00$3,900.00$3,900.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT1,327$3.00$3,981.00$3.00$3,981.00$4.44$5,891.88$3.10$4,113.70$3.00$3,981.00
2575.572RAPID STABILIZATION METHOD 4SQ YD1,284$1.80$2,311.20$1.80$2,311.20$2.22$2,850.48$1.90$2,439.60$1.60$2,054.40
2580.603INTERIM PAVEMENT MARKINGLIN FT27,892$0.11$3,068.12$0.20$5,578.40$0.10$2,789.20$0.17$4,741.64$0.10$2,789.20
2580.603INTERIM PAVEMENT MARKINGLIN FT27,892$0.11$3,068.12$0.10$2,789.20$0.10$2,789.20$0.17$4,741.64$0.16$4,462.72
2582.5026" SOLID LINE WHITE-EPOXYLIN FT13,804$0.25$3,451.00$0.25$3,451.00$0.27$3,727.08$0.26$3,589.04$0.28$3,865.12
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT6,973$0.12$836.76$0.12$836.76$0.13$906.49$0.13$906.49$0.10$697.30
2582.50224" SOLID LINE WHITE-EPOXYLIN FT36$7.00$252.00$7.00$252.00$7.35$264.60$7.20$259.20$7.09$255.24
2582.50224" SOLID LINE WHITE-PAINTLIN FT36$2.80$100.80$2.80$100.80$2.94$105.84$2.85$102.60$4.05$145.80
2582.5026" SOLID LINE WHITE-PAINTLIN FT13,804$0.07$966.28$0.08$1,104.32$0.08$1,104.32$0.08$1,104.32$0.07$966.28
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT6,973$0.40$2,789.20$0.40$2,789.20$0.42$2,928.66$0.41$2,858.93$0.43$2,998.39
 Totals for project CP 0897-276912 TST $434,256.28 $434,146.30 $438,086.52 $489,776.12 $491,456.80
 
CP 0284-295016 TST - CP 0284-295016 TST (Tied) - Reclaim & OverlayUlland Brothers, Inc. Hawkinson Construction Co., Inc KGM Contractors, Inc Northland Constructors of Duluth, Inc. Hardrives, Inc (R) 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$1,425.00$1,425.00$11,000.00$11,000.00$5,500.00$5,500.00$6,000.00$6,000.00$9,000.00$9,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$2,000.00$2,000.00$29,000.00$29,000.00$2,500.00$2,500.00$2,100.00$2,100.00$5,000.00$5,000.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD632$5.00$3,160.00$4.00$2,528.00$2.00$1,264.00$3.00$1,896.00$5.00$3,160.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT254$2.00$508.00$1.75$444.50$3.10$787.40$2.00$508.00$1.75$444.50
2118.501AGGREGATE SURFACING CLASS 5TON1,030$19.00$19,570.00$15.40$15,862.00$16.50$16,995.00$23.00$23,690.00$20.50$21,115.00
2123.503MOTOR GRADERHOUR21$300.00$6,300.00$180.00$3,780.00$175.00$3,675.00$250.00$5,250.00$126.00$2,646.00
2123.5070.5 CU YD SHOVELHOUR15$300.00$4,500.00$300.00$4,500.00$250.00$3,750.00$285.00$4,275.00$175.00$2,625.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR21$300.00$6,300.00$180.00$3,780.00$145.00$3,045.00$185.00$3,885.00$107.00$2,247.00
2130.501WATERM GALLON45$45.00$2,025.00$45.00$2,025.00$29.00$1,305.00$46.00$2,070.00$61.00$2,745.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON2,737$1.10$3,010.70$1.10$3,010.70$1.10$3,010.70$1.10$3,010.70$1.35$3,694.95
2211.501AGGREGATE BASE CLASS 5TON750$8.00$6,000.00$11.15$8,362.50$14.50$10,875.00$16.80$12,600.00$11.00$8,250.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD23,724$0.40$9,489.60$0.65$15,420.60$0.58$13,759.92$0.40$9,489.60$0.50$11,862.00
2215.501FULL DEPTH RECLAMATIONSQ YD23,724$0.40$9,489.60$0.77$18,267.48$0.58$13,759.92$0.42$9,964.08$0.48$11,387.52
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON2,442$3.50$8,547.00$3.50$8,547.00$3.68$8,986.56$3.65$8,913.30$2.53$6,178.26
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON6,290$3.00$18,870.00$3.00$18,870.00$3.15$19,813.50$3.10$19,499.00$2.53$15,913.70
2356.506BITUMINOUS SEAL COATSQ YD19,060$0.45$8,577.00$0.45$8,577.00$0.47$8,958.20$0.47$8,958.20$0.69$13,151.40
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,274$2.00$2,548.00$1.80$2,293.20$2.25$2,866.50$2.20$2,802.80$1.30$1,656.20
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON921$2.00$1,842.00$2.20$2,026.20$2.45$2,256.45$2.50$2,302.50$2.50$2,302.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON4,365$39.00$170,235.00$37.80$164,997.00$41.50$181,147.50$41.00$178,965.00$43.72$190,837.80
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON59$145.00$8,555.00$76.00$4,484.00$70.00$4,130.00$100.00$5,900.00$91.00$5,369.00
2540.602MAIL BOX SUPPORTEACH23$130.00$2,990.00$130.00$2,990.00$136.50$3,139.50$135.00$3,105.00$131.58$3,026.34
2563.601WORK ZONE SPEED LIMITLUMP SUM1$600.00$600.00$400.00$400.00$1,200.00$1,200.00$450.00$450.00$600.00$600.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$400.00$400.00$400.00$400.00$1,000.00$1,000.00$1,100.00$1,100.00$400.00$400.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,000.00$3,000.00$3,800.00$3,800.00$3,600.00$3,600.00$5,400.00$5,400.00$3,000.00$3,000.00
2580.603INTERIM PAVEMENT MARKINGLIN FT16,042$0.11$1,764.62$0.10$1,604.20$0.10$1,604.20$0.17$2,727.14$0.16$2,566.72
2580.603INTERIM PAVEMENT MARKINGLIN FT16,042$0.11$1,764.62$0.20$3,208.40$0.10$1,604.20$0.17$2,727.14$0.10$1,604.20
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT1,390$0.06$83.40$0.06$83.40$0.06$83.40$0.06$83.40$0.05$69.50
2582.5026" SOLID LINE WHITE-EPOXYLIN FT16,439$0.25$4,109.75$0.25$4,109.75$0.27$4,438.53$0.26$4,274.14$0.28$4,602.92
2582.5024" SOLID LINE YELLOW-PAINTLIN FT3,913$0.06$234.78$0.06$234.78$0.06$234.78$0.06$234.78$0.05$195.65
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT1,359$0.40$543.60$0.40$543.60$0.42$570.78$0.42$570.78$0.43$584.37
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT1,390$0.20$278.00$0.20$278.00$0.21$291.90$0.21$291.90$0.21$291.90
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT1,359$0.12$163.08$0.12$163.08$0.13$176.67$0.13$176.67$0.10$135.90
2582.5026" SOLID LINE WHITE-PAINTLIN FT16,439$0.07$1,150.73$0.08$1,315.12$0.08$1,315.12$0.08$1,315.12$0.07$1,150.73
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT3,913$0.20$782.60$0.20$782.60$0.21$821.73$0.21$821.73$0.21$821.73
2582.603PROTECT PAVEMENT MARKINGSLIN FT44$10.00$440.00$5.00$220.00$10.50$462.00$0.01$0.44$10.00$440.00
 Totals for project CP 0284-295016 TST $311,257.08 $347,908.11 $328,928.46 $335,357.42 $339,075.79
 
Contract Total:$1,787,689.64$1,830,426.11$1,877,078.04$1,953,533.06$1,998,454.77