CP 0009-241306 (TST) - CP 0009-241306(Low) (TST) - Reclaim & OverlayNorthland Constructors of Duluth, Inc. Ulland Brothers, Inc. Hawkinson Construction Co., Inc KGM Contractors, Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$17,800.00$17,800.00$15,185.00$15,185.00$17,500.00$17,500.00$40,000.00$40,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$2,600.00$2,600.00$2,525.00$2,525.00$2,500.00$2,500.00$2,625.00$2,625.00
2104.501REMOVE PIPE CULVERTSLIN FT40$25.00$1,000.00$20.80$832.00$20.00$800.00$11.50$460.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD2,102$4.50$9,459.00$8.28$17,404.56$4.90$10,299.80$3.85$8,092.70
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT659$2.00$1,318.00$1.58$1,041.22$2.25$1,482.75$3.60$2,372.40
2105.604GEOTEXTILE FABRIC TYPE VISQ YD148$5.00$740.00$2.36$349.28$4.00$592.00$4.50$666.00
2105.604GEOGRIDSQ YD69$5.40$372.60$2.62$180.78$8.00$552.00$3.20$220.80
2118.501AGGREGATE SURFACING CLASS 5TON664$25.00$16,600.00$13.30$8,831.20$17.50$11,620.00$18.00$11,952.00
2123.503MOTOR GRADERHOUR17$270.00$4,590.00$300.00$5,100.00$180.00$3,060.00$190.00$3,230.00
2123.5070.5 CU YD SHOVELHOUR15$325.00$4,875.00$451.00$6,765.00$210.00$3,150.00$165.00$2,475.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR17$190.00$3,230.00$290.00$4,930.00$180.00$3,060.00$145.00$2,465.00
2130.501WATERM GALLON31$45.00$1,395.00$40.00$1,240.00$45.00$1,395.00$30.00$930.00
2211.501AGGREGATE BASE CLASS 5TON200$25.00$5,000.00$13.75$2,750.00$17.90$3,580.00$15.00$3,000.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD49$32.00$1,568.00$42.60$2,087.40$42.00$2,058.00$31.50$1,543.50
2211.604AGGREGATE BASE STABILIZATIONSQ YD8,618$0.45$3,878.10$0.40$3,447.20$0.75$6,463.50$0.59$5,084.62
2215.501FULL DEPTH RECLAMATIONSQ YD8,974$0.55$4,935.70$0.46$4,128.04$0.68$6,102.32$0.59$5,294.66
2232.501MILL BITUMINOUS SURFACE (2.0")SQ YD5,455$1.35$7,364.25$1.45$7,909.75$1.48$8,073.40$1.40$7,637.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON791$3.65$2,887.15$3.55$2,808.05$3.50$2,768.50$3.70$2,926.70
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON4,480$3.10$13,888.00$3.04$13,619.20$2.98$13,350.40$3.10$13,888.00
2356.506BITUMINOUS SEAL COATSQ YD12,444$0.57$7,093.08$0.56$6,968.64$0.55$6,844.20$0.60$7,466.40
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,031$2.30$2,371.30$1.70$1,752.70$2.20$2,268.20$2.60$2,680.60
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON645$2.90$1,870.50$3.55$2,289.75$2.50$1,612.50$2.70$1,741.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON2,520$49.50$124,740.00$51.65$130,158.00$49.50$124,740.00$56.00$141,120.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON272$68.00$18,496.00$82.45$22,426.40$96.00$26,112.00$72.00$19,584.00
2401.521STRUCTURE EXCAVATION CLASS E (P)CU YD171$18.00$3,078.00$21.55$3,685.05$28.00$4,788.00$20.54$3,512.34
2411.521GRANULAR BACKFILL (CV) (P)CU YD94$30.00$2,820.00$36.85$3,463.90$30.00$2,820.00$21.09$1,982.46
2451.507GRANULAR BEDDING (CV) (P)CU YD13$35.00$455.00$43.40$564.20$40.00$520.00$27.82$361.66
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT34$160.00$5,440.00$46.70$1,587.80$135.00$4,590.00$91.00$3,094.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH2$1,000.00$2,000.00$840.00$1,680.00$1,700.00$3,400.00$710.00$1,420.00
2506.602ADJUST FRAME & RING CASTING (SPECIAL)EACH7$1,325.00$9,275.00$1,375.00$9,625.00$1,360.00$9,520.00$1,400.00$9,800.00
2540.602MAIL BOX SUPPORTEACH45$120.00$5,400.00$116.50$5,242.50$125.00$5,625.00$134.00$6,030.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$3,100.00$3,100.00$3,030.00$3,030.00$3,300.00$3,300.00$2,000.00$2,000.00
2563.601TRAFFIC CONTROLLUMP SUM1$4,000.00$4,000.00$2,828.00$2,828.00$3,500.00$3,500.00$4,000.00$4,000.00
2573.502SILT FENCE, TYPE HILIN FT141$8.00$1,128.00$4.60$648.60$2.55$359.55$4.70$662.70
2575.572RAPID STABILIZATION METHOD 4SQ YD95$3.70$351.50$5.15$489.25$5.45$517.75$5.40$513.00
2580.603INTERIM PAVEMENT MARKINGLIN FT14,750$0.17$2,507.50$0.12$1,770.00$0.20$2,950.00$0.12$1,770.00
2580.603INTERIM PAVEMENT MARKINGLIN FT14,750$0.17$2,507.50$0.12$1,770.00$0.20$2,950.00$0.12$1,770.00
2582.5026" SOLID LINE WHITE-EPOXYLIN FT10,435$0.27$2,817.45$0.26$2,713.10$0.26$2,713.10$0.27$2,817.45
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT2,839$0.44$1,249.16$0.42$1,192.38$0.42$1,192.38$0.44$1,249.16
2582.5026" SOLID LINE WHITE-PAINTLIN FT10,435$0.09$939.15$0.08$834.80$0.08$834.80$0.08$834.80
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT2,839$0.15$425.85$0.14$397.46$0.14$397.46$0.15$425.85
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT480$0.22$105.60$0.21$100.80$0.21$100.80$0.22$105.60
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT480$0.08$38.40$0.07$33.60$0.07$33.60$0.07$33.60
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT1,217$0.22$267.74$0.21$255.57$0.21$255.57$0.22$267.74
2582.50224" STOP LINE WHITE-POLY PREF-GR INLIN FT11$43.80$481.80$30.30$333.30$42.00$462.00$44.00$484.00
2582.5024" SOLID LINE YELLOW-PAINTLIN FT1,217$0.08$97.36$0.07$85.19$0.07$85.19$0.07$85.19
2582.50224" STOP LINE WHITE-PAINTLIN FT11$3.10$34.10$3.03$33.33$3.00$33.00$3.15$34.65
 Totals for project CP 0009-241306 (TST) $306,590.79 $307,093.00 $310,932.77 $330,710.08
 
Contract Total:$306,590.79$307,093.00$310,932.77$330,710.08