St Louis County Public Works Department

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

CP 0000-204369 - SP 69-597-007, CP 0000-204369 - Bridge 48Redstone Construction, LLC - OLD Northland Constructors of Duluth, Inc. Dallco, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.01$53,000.00$530.00$95,000.00$950.00$97,407.00$974.07
2021.501MOBILIZATIONLUMP SUM0.09$53,000.00$4,770.00$95,000.00$8,550.00$97,407.00$8,766.63
2021.501MOBILIZATIONLUMP SUM0.9$53,000.00$47,700.00$95,000.00$85,500.00$97,407.00$87,666.30
2101.511CLEARING & GRUBBINGLUMP SUM0.18$4,000.00$720.00$750.00$135.00$5,000.00$900.00
2101.511CLEARING & GRUBBINGLUMP SUM0.82$4,000.00$3,280.00$750.00$615.00$5,000.00$4,100.00
2104.505REMOVE PAVEMENTSQ YD226$15.00$3,390.00$3.50$791.00$5.00$1,130.00
2104.505REMOVE PAVEMENTSQ YD286$15.00$4,290.00$3.50$1,001.00$5.00$1,430.00
2104.509REMOVE SIGNEACH6$25.00$150.00$30.00$180.00$50.00$300.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT102$5.00$510.00$2.20$224.40$15.00$1,530.00
2104.523SALVAGE SIGNEACH1$25.00$25.00$30.00$30.00$50.00$50.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD444$5.00$2,220.00$3.30$1,465.20$3.00$1,332.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD472$5.00$2,360.00$3.30$1,557.60$3.00$1,416.00
2106.501EXCAVATION - COMMON (P)CU YD334$20.00$6,680.00$13.00$4,342.00$25.00$8,350.00
2106.501EXCAVATION - COMMON (P)CU YD254$20.00$5,080.00$13.00$3,302.00$25.00$6,350.00
2106.522SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD163$30.00$4,890.00$27.00$4,401.00$40.00$6,520.00
2106.522SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD772$30.00$23,160.00$27.00$20,844.00$40.00$30,880.00
2118.502AGGREGATE SURFACING (LV), CLASS 5CU YD28$25.00$700.00$30.00$840.00$50.00$1,400.00
2118.607AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD24$35.00$840.00$37.00$888.00$50.00$1,200.00
2118.607AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD23$35.00$805.00$37.00$851.00$50.00$1,150.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD43$35.00$1,505.00$38.00$1,634.00$50.00$2,150.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD47$35.00$1,645.00$38.00$1,786.00$50.00$2,350.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON12$10.00$120.00$10.50$126.00$10.00$120.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON18$10.00$180.00$10.50$189.00$10.00$180.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON54$84.00$4,536.00$89.00$4,806.00$100.00$5,400.00
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON54$84.00$4,536.00$89.00$4,806.00$100.00$5,400.00
2401.501STRUCTURAL CONCRETE (3B52) (P)CU YD99$775.00$76,725.00$1,200.00$118,800.00$1,107.00$109,593.00
2401.513TYPE P-1 BARRIER CONCRETE (3S52) (P)LIN FT152$110.00$16,720.00$125.00$19,000.00$284.00$43,168.00
2401.515SIDEWALK CONCRETE (3S52) (P)SQ FT1,744$15.00$26,160.00$16.00$27,904.00$22.00$38,368.00
2401.541REINFORCEMENT BARS (STAINLESS-60KSI) (P)POUND580$4.00$2,320.00$4.00$2,320.00$6.00$3,480.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)POUND18,930$1.25$23,662.50$1.25$23,662.50$2.50$47,325.00
2401.601SLOPE PREPARATIONLUMP SUM1$5,000.00$5,000.00$2,500.00$2,500.00$15,475.00$15,475.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$20,000.00$20,000.00$53,600.00$53,600.00$22,696.00$22,696.00
2402.583ORNAMENTAL METAL RAILING (P)LIN FT152$125.00$19,000.00$145.00$22,040.00$120.00$18,240.00
2402.590ELASTOMERIC BEARING PAD TYPE 1EACH24$95.00$2,280.00$120.00$2,880.00$130.00$3,120.00
2404.501CONCRETE WEARING COURSE (3U17A) (P)SQ FT3,470$14.50$50,315.00$14.80$51,356.00$14.50$50,315.00
2405.603PRESTRESSED CONCRETE BEAMS 33X48 (P)LIN FT809$590.00$477,310.00$610.00$493,490.00$571.80$462,586.20
2406.553BRIDGE APPROACH PANELS (P)SQ YD190$200.00$38,000.00$180.00$34,200.00$275.00$52,250.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$50,000.00$50,000.00$21,000.00$21,000.00$41,310.00$41,310.00
2452.520STEEL H-TEST PILE 30 FT LONG 12"EACH2$7,500.00$15,000.00$4,000.00$8,000.00$12,900.00$25,800.00
2452.530PILE TIP PROTECTION 12"EACH15$115.00$1,725.00$125.00$1,875.00$150.00$2,250.00
2452.603STEEL H-PILING 12"LIN FT325$30.00$9,750.00$37.00$12,025.00$3.00$975.00
2501.51512" RC PIPE APRONEACH1$1,180.00$1,180.00$1,000.00$1,000.00$1,500.00$1,500.00
2502.502DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,500.00$1,500.00$2,000.00$2,000.00$1,500.00$1,500.00
2503.54112" RC PIPE SEWER DES 3006 CL VLIN FT57$65.00$3,705.00$60.00$3,420.00$75.00$4,275.00
2506.501CONST DRAINAGE STRUCTURE DESIGN C OR GLIN FT11$605.00$6,655.00$400.00$4,400.00$892.00$9,812.00
2506.516CASTING ASSEMBLYEACH3$450.00$1,350.00$750.00$2,250.00$1,000.00$3,000.00
2511.501RANDOM RIPRAP CLASS IIICU YD111$80.00$8,880.00$70.00$7,770.00$110.00$12,210.00
2511.501RANDOM RIPRAP CLASS IIICU YD4$80.00$320.00$70.00$280.00$110.00$440.00
2511.515GEOTEXTILE FILTER TYPE VII (MOD)SQ YD163$2.50$407.50$5.00$815.00$4.00$652.00
2531.501CONCRETE CURB & GUTTER DESIGN B624LIN FT72$50.00$3,600.00$30.00$2,160.00$35.00$2,520.00
2557.501WIRE FENCE DESIGN W-1 VINYL COATEDLIN FT19$100.00$1,900.00$105.00$1,995.00$150.00$2,850.00
2557.501WIRE FENCE DESIGN 48V-9322LIN FT25$100.00$2,500.00$150.00$3,750.00$125.00$3,125.00
2563.601TRAFFIC CONTROLLUMP SUM0.09$2,800.00$252.00$3,000.00$270.00$5,000.00$450.00
2563.601TRAFFIC CONTROLLUMP SUM0.01$2,800.00$28.00$3,000.00$30.00$5,000.00$50.00
2563.601TRAFFIC CONTROLLUMP SUM0.9$2,800.00$2,520.00$3,000.00$2,700.00$5,000.00$4,500.00
2564.602INSTALL SIGNEACH1$125.00$125.00$130.00$130.00$200.00$200.00
2573.502SILT FENCE, TYPE HILIN FT80$4.00$320.00$4.20$336.00$5.00$400.00
2573.502SILT FENCE, TYPE HILIN FT264$4.00$1,056.00$4.20$1,108.80$5.00$1,320.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT134$24.00$3,216.00$25.00$3,350.00$28.00$3,752.00
2573.530STORM DRAIN INLET PROTECTIONEACH3$300.00$900.00$200.00$600.00$500.00$1,500.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM0.18$250.00$45.00$500.00$90.00$1,000.00$180.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM0.82$250.00$205.00$500.00$410.00$1,000.00$820.00
2574.508FERTILIZER TYPE 3POUND20$1.00$20.00$1.04$20.80$2.00$40.00
2574.508FERTILIZER TYPE 3POUND11$1.00$11.00$1.04$11.44$2.00$22.00
2574.525COMMON TOPSOIL BORROWCU YD13$50.00$650.00$45.00$585.00$70.00$910.00
2574.525COMMON TOPSOIL BORROWCU YD25$50.00$1,250.00$45.00$1,125.00$70.00$1,750.00
2575.501SEEDING (P)ACRE0.03$1,600.00$48.00$1,700.00$51.00$2,000.00$60.00
2575.501SEEDING (P)ACRE0.07$1,600.00$112.00$1,700.00$119.00$2,000.00$140.00
2575.502SEED MIXTURE 25-141POUND2$10.00$20.00$10.50$21.00$12.00$24.00
2575.502SEED MIXTURE 25-141POUND4$10.00$40.00$10.50$42.00$12.00$48.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD156$1.70$265.20$2.00$312.00$2.50$390.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD291$1.70$494.70$2.00$582.00$2.50$727.50
2575.571RAPID STABILIZATION METHOD 3M GALLON3$800.00$2,400.00$850.00$2,550.00$3,800.00$11,400.00
 Totals for project CP 0000-204369 $1,004,564.90 $1,088,750.74 $1,188,563.70
 
Contract Total:$1,004,564.90$1,088,750.74$1,188,563.70