St Louis County Public Works Department

Welcome, Guest!
Log in | Employee Login | License
 

Contract Bid Abstract

CP 8110-1753 (Tied) - CP 8110-1753, SAP 069-599-046 Bridge #373 (Tied)Northland Constructors of Duluth, Inc. Redstone Construction, LLC S & R Reinforcing, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.54$40,000.00$21,600.00$75,000.00$40,500.00$68,890.00$37,200.60
2021.501MOBILIZATIONLUMP SUM0.46$40,000.00$18,400.00$75,000.00$34,500.00$68,890.00$31,689.40
2031.502FIELD OFFICE TYPE DEACH1$5,500.00$5,500.00$5,000.00$5,000.00$10,000.00$10,000.00
2101.501CLEARING & GRUBBINGLUMP SUM1$2,500.00$2,500.00$2,750.00$2,750.00$2,750.00$2,750.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT24$5.00$120.00$5.00$120.00$5.00$120.00
2104.503REMOVE PIPE CULVERTSLIN FT104$13.00$1,352.00$15.00$1,560.00$15.00$1,560.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,116$3.00$3,348.00$3.75$4,185.00$3.75$4,185.00
2105.601DEWATERINGLUMP SUM1$1.00$1.00$1.00$1.00$2,000.00$2,000.00
2106.507EXCAVATION - COMMON (P)CU YD1,300$12.00$15,600.00$15.00$19,500.00$15.00$19,500.00
2106.507GRANULAR EMBANKMENT (CV) (P)CU YD1,617$25.00$40,425.00$15.00$24,255.00$15.00$24,255.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD686$30.00$20,580.00$16.25$11,147.50$16.25$11,147.50
2118.507AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD720$40.00$28,800.00$30.00$21,600.00$30.00$21,600.00
2401.503TYPE P-2 (TL-4) BARRIER CONCRETE (3S52) (P)LIN FT180$130.00$23,400.00$105.00$18,900.00$101.00$18,180.00
2401.507STRUCTURAL CONCRETE (3B52) (P)CU YD59$1,200.00$70,800.00$775.00$45,725.00$1,156.00$68,204.00
2401.508REINFORCEMENT BARS (STAINLESS-75KSI) (P)POUND430$4.00$1,720.00$7.00$3,010.00$10.00$4,300.00
2401.508REINFORCEMENT BARS (EPOXY COATED) (P)POUND23,760$1.40$33,264.00$1.50$35,640.00$1.20$28,512.00
2401.518BRIDGE SLAB CONCRETE (3Y42-M) (P)SQ FT2,073$42.00$87,066.00$32.00$66,336.00$36.55$75,768.15
2401.601SLOPE PREPARATIONLUMP SUM1$500.00$500.00$5,000.00$5,000.00$5,000.00$5,000.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$4,500.00$4,500.00$25,000.00$25,000.00$10,000.00$10,000.00
2402.502ELASTOMERIC BEARING PAD TYPE 1EACH8$125.00$1,000.00$100.00$800.00$105.00$840.00
2402.502FLOOR DRAIN TYPE B706EACH2$1,400.00$2,800.00$1,250.00$2,500.00$1,160.00$2,320.00
2402.503STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT168$130.00$21,840.00$120.00$20,160.00$123.50$20,748.00
2405.503PRESTRESSED CONCRETE BEAMS 27M (P)LIN FT261$250.00$65,250.00$265.00$69,165.00$257.39$67,178.79
2406.504BRIDGE APPROACH PANELS (P)SQ YD137$220.00$30,140.00$250.00$34,250.00$281.00$38,497.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$11,500.00$11,500.00$35,000.00$35,000.00$37,278.00$37,278.00
2452.502STEEL H-TEST PILE 140 FT LONG 12"EACH2$8,500.00$17,000.00$14,000.00$28,000.00$14,600.00$29,200.00
2452.502PILE TIP PROTECTION 12"EACH10$125.00$1,250.00$125.00$1,250.00$113.00$1,130.00
2452.603STEEL H-PILING 12"LIN FT1,040$50.00$52,000.00$30.00$31,200.00$28.20$29,328.00
2452.618STEEL SHEET PILING (PERMANENT)SQ FT3,353$36.00$120,708.00$30.00$100,590.00$33.10$110,984.30
2501.50215" CS PIPE APRONEACH4$275.00$1,100.00$450.00$1,800.00$450.00$1,800.00
2501.50315" CS PIPE CULVERTLIN FT86$35.00$3,010.00$65.00$5,590.00$65.00$5,590.00
2502.501DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,500.00$1,500.00$1,250.00$1,250.00$1,000.00$1,000.00
2502.601DRAINAGE SYSTEMLUMP SUM1$1,200.00$1,200.00$1,000.00$1,000.00$1,000.00$1,000.00
2511.504GEOTEXTILE FILTER TYPE 7SQ YD470$5.00$2,350.00$2.00$940.00$2.50$1,175.00
2511.504GEOTEXTILE FILTER TYPE 3SQ YD36$2.00$72.00$3.50$126.00$2.50$90.00
2511.504GEOTEXTILE FILTER TYPE 7SQ YD176$5.00$880.00$2.00$352.00$2.50$440.00
2511.507RANDOM RIPRAP CLASS IIICU YD280$55.00$15,400.00$60.00$16,800.00$72.00$20,160.00
2511.507RANDOM RIPRAP CLASS IIICU YD85$55.00$4,675.00$60.00$5,100.00$72.00$6,120.00
2511.507RANDOM RIPRAP CLASS IICU YD6$45.00$270.00$100.00$600.00$112.00$672.00
2554.502END TREATMENT-TANGENT TERMINALEACH4$3,500.00$14,000.00$3,375.00$13,500.00$3,375.00$13,500.00
2554.503TRAFFIC BARRIER DESIGN SPECIALLIN FT100$88.00$8,800.00$84.50$8,450.00$84.50$8,450.00
2554.503TRAFFIC BARRIER DESIGN B8307LIN FT150$22.00$3,300.00$20.50$3,075.00$20.50$3,075.00
2563.601TRAFFIC CONTROLLUMP SUM0.46$3,100.00$1,426.00$5,550.00$2,553.00$6,550.00$3,013.00
2563.601TRAFFIC CONTROLLUMP SUM0.54$3,100.00$1,674.00$5,550.00$2,997.00$6,550.00$3,537.00
2564.502INSTALL SIGN PANEL TYPE CEACH8$150.00$1,200.00$150.00$1,200.00$150.00$1,200.00
2573.501EROSION CONTROL SUPERVISORLUMP SUM1$500.00$500.00$500.00$500.00$1,500.00$1,500.00
2573.501STABILIZED CONSTRUCTION EXITLUMP SUM1$800.00$800.00$500.00$500.00$1,000.00$1,000.00
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERLIN FT26$4.20$109.20$4.00$104.00$4.00$104.00
2573.503SILT FENCE; TYPE HILIN FT3,590$3.10$11,129.00$3.00$10,770.00$3.00$10,770.00
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT300$25.00$7,500.00$24.00$7,200.00$24.00$7,200.00
2574.507COMMON TOPSOIL BORROWCU YD470$9.00$4,230.00$20.00$9,400.00$20.00$9,400.00
2574.508FERTILIZER TYPE 3POUND410$0.65$266.50$0.60$246.00$0.60$246.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD5,640$1.65$9,306.00$1.55$8,742.00$1.55$8,742.00
2575.505SEEDINGACRE1.17$210.00$245.70$200.00$234.00$200.00$234.00
2575.508SEED MIXTURE 36-311POUND82$26.00$2,132.00$25.00$2,050.00$25.00$2,050.00
2575.523RAPID STABILIZATION METHOD 3M GALLON4$625.00$2,500.00$600.00$2,400.00$600.00$2,400.00
 Totals for project CP 8110-1753 (Tied) $802,539.40 $795,123.50 $827,943.74
 
CP 9241-300228 (LOW) - CP 9241-300228, SAP 069-599-045 - Bridge Construction BR 430 (LOW)Northland Constructors of Duluth, Inc. Redstone Construction, LLC S & R Reinforcing, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.81$21,000.00$17,010.00$75,000.00$60,750.00$68,075.00$55,140.75
2021.501MOBILIZATIONLUMP SUM0.19$21,000.00$3,990.00$75,000.00$14,250.00$68,075.00$12,934.25
2031.502FIELD OFFICE TYPE DEACH1$5,500.00$5,500.00$5,000.00$5,000.00$10,000.00$10,000.00
2051.501MAINT & RESTORATION OF HAUL ROADSLUMP SUM1$1.00$1.00$1.00$1.00$1.00$1.00
2101.501CLEARING & GRUBBINGLUMP SUM1$800.00$800.00$2,750.00$2,750.00$2,750.00$2,750.00
2104.503REMOVE PIPE CULVERTSLIN FT31$18.00$558.00$15.45$478.95$15.45$478.95
2105.601DEWATERINGLUMP SUM1$1,000.00$1,000.00$1.00$1.00$2,000.00$2,000.00
2106.507EXCAVATION - COMMON (P)CU YD1,028$10.00$10,280.00$15.00$15,420.00$15.00$15,420.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD792$20.00$15,840.00$16.25$12,870.00$16.25$12,870.00
2118.507AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD515$35.00$18,025.00$30.00$15,450.00$30.00$15,450.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON47$10.00$470.00$10.00$470.00$10.00$470.00
2401.503TYPE MOD P-2 (TL-4) BARRIER CONC (3S52) (P)LIN FT199$130.00$25,870.00$105.00$20,895.00$111.40$22,168.60
2401.507STRUCTURAL CONCRETE (3B52) (P)CU YD56$950.00$53,200.00$750.00$42,000.00$1,055.35$59,099.60
2401.508REINFORCEMENT BARS (STAINLESS-75KSI) (P)POUND360$4.00$1,440.00$7.00$2,520.00$10.00$3,600.00
2401.508REINFORCEMENT BARS (EPOXY COATED) (P)POUND28,910$1.45$41,919.50$1.50$43,365.00$1.20$34,692.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$15,800.00$15,800.00$35,000.00$35,000.00$28,535.00$28,535.00
2401.601SLOPE PREPARATIONLUMP SUM1$12,200.00$12,200.00$1,500.00$1,500.00$5,000.00$5,000.00
2401.618BRIDGE SLAB CONCRETE (3YHPC-M) (P)SQ FT2,442$40.00$97,680.00$32.00$78,144.00$37.32$91,135.44
2402.502ELASTOMERIC BEARING PAD TYPE 1EACH8$125.00$1,000.00$100.00$800.00$105.00$840.00
2402.502FLOOR DRAIN TYPE B706 MODIFIEDEACH2$1,400.00$2,800.00$1,250.00$2,500.00$1,160.00$2,320.00
2402.503STRUCTURAL TUBE RAILING DESIGN T-1 PC (P)LIN FT193$130.00$25,090.00$120.00$23,160.00$123.50$23,835.50
2405.503DIAPHRAGMS FOR TYPE 36M PREST BEAMS (P)LIN FT26$90.00$2,340.00$95.00$2,470.00$75.00$1,950.00
2405.503PRESTRESSED CONCRETE BEAMS 36M (P)LIN FT308$250.00$77,000.00$295.00$90,860.00$246.82$76,020.56
2406.504BRIDGE APPROACH PANELS (P)SQ YD135$210.00$28,350.00$250.00$33,750.00$246.00$33,210.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$9,500.00$9,500.00$24,500.00$24,500.00$24,362.00$24,362.00
2452.502PILE TIP PROTECTION 10"EACH10$120.00$1,200.00$125.00$1,250.00$102.00$1,020.00
2452.502STEEL H-TEST PILE 90 FT LONG 10"EACH1$6,000.00$6,000.00$9,000.00$9,000.00$9,500.00$9,500.00
2452.502STEEL H-TEST PILE 60 FT LONG 10"EACH1$4,500.00$4,500.00$6,000.00$6,000.00$8,500.00$8,500.00
2452.603STEEL H-PILING 10"LIN FT520$47.00$24,440.00$35.00$18,200.00$19.10$9,932.00
2501.50218" GS PIPE APRONEACH2$470.00$940.00$450.00$900.00$450.00$900.00
2501.50318" CAS PIPE CULVERTLIN FT38$36.00$1,368.00$65.00$2,470.00$65.00$2,470.00
2502.501DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,500.00$1,500.00$1,200.00$1,200.00$1,000.00$1,000.00
2511.504GEOTEXTILE FILTER TYPE 5SQ YD2,530$2.00$5,060.00$3.50$8,855.00$2.00$5,060.00
2511.504GEOTEXTILE FILTER TYPE 7SQ YD575$5.00$2,875.00$2.00$1,150.00$2.50$1,437.50
2511.507RANDOM RIPRAP CLASS IIICU YD280$40.00$11,200.00$60.00$16,800.00$72.00$20,160.00
2554.502END TREATMENT-TANGENT TERMINALEACH4$3,500.00$14,000.00$3,375.00$13,500.00$3,375.00$13,500.00
2554.503TRAFFIC BARRIER DESIGN SPECIALLIN FT100$88.00$8,800.00$84.50$8,450.00$84.50$8,450.00
2554.503TRAFFIC BARRIER DESIGN B8338LIN FT100$22.00$2,200.00$21.25$2,125.00$21.25$2,125.00
2563.601TRAFFIC CONTROLLUMP SUM0.19$2,100.00$399.00$1,995.00$379.05$2,995.00$569.05
2563.601TRAFFIC CONTROLLUMP SUM0.81$2,100.00$1,701.00$1,995.00$1,615.95$2,995.00$2,425.95
2573.501EROSION CONTROL SUPERVISORLUMP SUM1$500.00$500.00$500.00$500.00$1,500.00$1,500.00
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERLIN FT72$4.20$302.40$4.00$288.00$4.00$288.00
2573.503SILT FENCE; TYPE HILIN FT1,357$3.10$4,206.70$3.00$4,071.00$3.00$4,071.00
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT221$25.00$5,525.00$24.00$5,304.00$24.00$5,304.00
2574.507COMMON TOPSOIL BORROWCU YD171$30.00$5,130.00$20.00$3,420.00$20.00$3,420.00
2574.508FERTILIZER TYPE 3POUND147$0.65$95.55$0.60$88.20$0.60$88.20
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD2,018$1.65$3,329.70$1.60$3,228.80$1.60$3,228.80
2575.505SEEDINGACRE0.42$210.00$88.20$200.00$84.00$200.00$84.00
2575.508SEED MIXTURE 25-121POUND25$5.25$131.25$5.00$125.00$5.00$125.00
2575.523RAPID STABILIZATION METHOD 3M GALLON5.04$625.00$3,150.00$600.00$3,024.00$600.00$3,024.00
 Totals for project CP 9241-300228 (LOW) $576,305.30 $640,932.95 $642,466.15
 
Contract Total:$1,378,844.70$1,436,056.45$1,470,409.89