Bid Abstract

CP 0004-213068 - SAP 69-604-076, CP 0004-213068 - Bridge #414Redstone Construction, LLC - OLD Northland Constructors of Duluth, Inc. Dallco, Inc. Robert R. Schroeder Const., Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.74$120,000.00$88,800.00$73,000.00$54,020.00$66,060.00$48,884.40$172,046.00$127,314.04
2021.501MOBILIZATIONLUMP SUM0.26$120,000.00$31,200.00$73,000.00$18,980.00$66,060.00$17,175.60$172,046.00$44,731.96
2031.501FIELD OFFICE TYPE DEACH1$7,500.00$7,500.00$4,500.00$4,500.00$15,000.00$15,000.00$3,500.00$3,500.00
2101.511CLEARING & GRUBBINGLUMP SUM1$2,500.00$2,500.00$2,500.00$2,500.00$2,000.00$2,000.00$3,500.00$3,500.00
2104.501REMOVE GUARDRAIL-PLATE BEAMLIN FT458$7.00$3,206.00$8.00$3,664.00$10.00$4,580.00$6.60$3,022.80
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT88$10.00$880.00$2.50$220.00$10.00$880.00$8.75$770.00
2104.523SALVAGE SIGNEACH8$50.00$400.00$55.00$440.00$60.00$480.00$50.00$400.00
2105.601DEWATERINGLUMP SUM1$1.00$1.00$500.00$500.00$1,000.00$1,000.00$1.00$1.00
2105.604SOIL STABILIZATION GEOGRIDSQ YD245$10.00$2,450.00$5.00$1,225.00$7.00$1,715.00$10.00$2,450.00
2106.607EXCAVATION - COMMON (EV) (P)CU YD2,359$18.00$42,462.00$13.00$30,667.00$16.00$37,744.00$29.55$69,708.45
2106.607SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD878$22.00$19,316.00$24.00$21,072.00$22.00$19,316.00$40.85$35,866.30
2112.501SUBGRADE PREPARATIONROAD STA2$500.00$1,000.00$1,000.00$2,000.00$2,000.00$4,000.00$350.00$700.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON20,900$1.10$22,990.00$1.15$24,035.00$1.00$20,900.00$1.00$20,900.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD198$35.00$6,930.00$26.50$5,247.00$40.00$7,920.00$68.00$13,464.00
2232.603MILLED RUMBLE STRIPSLIN FT710$7.75$5,502.50$9.00$6,390.00$8.00$5,680.00$7.75$5,502.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON511$80.00$40,880.00$79.00$40,369.00$125.00$63,875.00$125.00$63,875.00
2401.501STRUCTURAL CONCRETE (3Y43) (P)CU YD97$600.00$58,200.00$1,100.00$106,700.00$750.00$72,750.00$600.00$58,200.00
2401.512BRIDGE SLAB CONCRETE (3Y33) (P)SQ FT3,530$25.50$90,015.00$34.00$120,020.00$32.00$112,960.00$32.00$112,960.00
2401.513TYPE P-2 (TL-4) RAILING CONCRETE (3Y46) (P)LIN FT197$105.00$20,685.00$86.00$16,942.00$165.00$32,505.00$100.00$19,700.00
2401.541REINFORCEMENT BARS (STAINLESS-60 KSI) (P)POUND570$5.00$2,850.00$6.00$3,420.00$5.00$2,850.00$6.00$3,420.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)POUND36,980$1.50$55,470.00$1.45$53,621.00$1.40$51,772.00$1.50$55,470.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$10,000.00$10,000.00$12,500.00$12,500.00$12,000.00$12,000.00$7,000.00$7,000.00
2401.601SLOPE PREPARATIONLUMP SUM1$5,500.00$5,500.00$2,500.00$2,500.00$6,000.00$6,000.00$5,000.00$5,000.00
2402.546FLOOR DRAIN TYPE B706EACH3$800.00$2,400.00$900.00$2,700.00$1,000.00$3,000.00$1,000.00$3,000.00
2402.584STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT184$145.00$26,680.00$170.00$31,280.00$135.00$24,840.00$275.00$50,600.00
2402.590ELASTOMERIC BEARING PAD TYPE 1EACH12$100.00$1,200.00$200.00$2,400.00$200.00$2,400.00$250.00$3,000.00
2405.502PRESTRESSED CONCRETE BEAMS 36M (P)LIN FT440$255.00$112,200.00$270.00$118,800.00$250.00$110,000.00$300.00$132,000.00
2405.511DIAPHRAGMS FOR TYPE 36M PREST BEAMS (P)LIN FT45$55.00$2,475.00$80.00$3,600.00$85.00$3,825.00$75.00$3,375.00
2406.553BRIDGE APPROACH PANELS (P)SQ YD390$200.00$78,000.00$170.00$66,300.00$190.00$74,100.00$290.00$113,100.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$30,000.00$30,000.00$32,000.00$32,000.00$36,500.00$36,500.00$30,000.00$30,000.00
2452.510STEEL H-PILING DRIVEN 12"LIN FT700$1.00$700.00$1.00$700.00$1.00$700.00$6.00$4,200.00
2452.511STEEL H-PILING DELIVERED 12"LIN FT700$35.00$24,500.00$47.00$32,900.00$36.60$25,620.00$25.00$17,500.00
2452.520STEEL H-TEST PILE 60 FT LONG 12"EACH2$10,000.00$20,000.00$4,500.00$9,000.00$5,000.00$10,000.00$8,000.00$16,000.00
2452.530PILE TIP PROTECTION 12"EACH16$125.00$2,000.00$130.00$2,080.00$110.00$1,760.00$200.00$3,200.00
2502.502DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$2,500.00$2,500.00$2,000.00$2,000.00$1,400.00$1,400.00$2,000.00$2,000.00
2511.501RANDOM RIPRAP CLASS IIICU YD500$50.00$25,000.00$42.00$21,000.00$65.00$32,500.00$120.00$60,000.00
2511.515GEOTEXTILE FILTER TYPE VIISQ YD1,015$2.50$2,537.50$3.50$3,552.50$2.50$2,537.50$1.50$1,522.50
2554.501TRAFFIC BARRIER DESIGN SPECIALLIN FT100$65.75$6,575.00$69.00$6,900.00$71.00$7,100.00$65.75$6,575.00
2554.501TRAFFIC BARRIER DESIGN B8307LIN FT260$19.00$4,940.00$20.00$5,200.00$25.50$6,630.00$19.00$4,940.00
2554.523END TREATMENT TANGENT TERMINALEACH4$2,399.00$9,596.00$2,500.00$10,000.00$2,650.00$10,600.00$2,399.00$9,596.00
2563.601TRAFFIC CONTROLLUMP SUM0.26$7,500.00$1,950.00$9,500.00$2,470.00$9,000.00$2,340.00$7,500.00$1,950.00
2563.601TRAFFIC CONTROLLUMP SUM0.74$7,500.00$5,550.00$9,500.00$7,030.00$9,000.00$6,660.00$7,500.00$5,550.00
2573.502SILT FENCE, TYPE HILIN FT1,430$3.95$5,648.50$3.20$4,576.00$3.00$4,290.00$3.95$5,648.50
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT270$31.50$8,505.00$22.00$5,940.00$25.00$6,750.00$31.50$8,505.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$375.00$375.00$2,000.00$2,000.00$400.00$400.00$500.00$500.00
2574.508FERTILIZER TYPE 3POUND150$1.00$150.00$0.80$120.00$0.75$112.50$1.00$150.00
2574.525COMMON TOPSOIL BORROWCU YD66$60.00$3,960.00$27.00$1,782.00$50.00$3,300.00$63.73$4,206.18
2575.501SEEDINGACRE0.42$500.00$210.00$525.00$220.50$400.00$168.00$500.00$210.00
2575.502SEED MIXTURE 36-311POUND30$71.50$2,145.00$38.00$1,140.00$55.00$1,650.00$71.50$2,145.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD2,030$2.45$4,973.50$1.70$3,451.00$2.20$4,466.00$2.45$4,973.50
2575.571RAPID STABILIZATION METHOD 3M GALLON1.1$1,200.00$1,320.00$900.00$990.00$1,000.00$1,100.00$1,200.00$1,320.00
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT310$0.25$77.50$0.23$71.30$0.50$155.00$0.22$68.20
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT700$2.05$1,435.00$2.15$1,505.00$2.10$1,470.00$2.05$1,435.00
2582.5026" SOLID LINE WHITE-EPOXYLIN FT1,010$2.15$2,171.50$2.20$2,222.00$2.20$2,222.00$2.15$2,171.50
 Totals for project CP 0004-213068 $908,512.00 $915,462.30 $930,583.00 $1,156,897.43
 
Contract Total:$908,512.00$915,462.30$930,583.00$1,156,897.43