Bid Abstract

CP 0007-208919 - SP 69-607-050, CP 0007-208919 - Reclaim & OverlayNorthland Constructors of Duluth, Inc. Ulland Brothers, Inc. KGM Contractors, Inc Hardrives, Inc (R) Hawkinson Construction Co., Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$20,000.00$20,000.00$114,000.00$114,000.00$75,000.00$75,000.00$83,500.00$83,500.00$85,000.00$85,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$9,400.00$9,400.00$5,686.45$5,686.45$9,500.00$9,500.00$9,000.00$9,000.00$9,000.00$9,000.00
2104.501REMOVE PIPE CULVERTSLIN FT452$16.00$7,232.00$13.00$5,876.00$9.90$4,474.80$5.79$2,617.08$5.75$2,599.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD2,417$3.00$7,251.00$3.00$7,251.00$2.30$5,559.10$1.01$2,441.17$1.00$2,417.00
2104.509REMOVE CONCRETE APRONEACH3$500.00$1,500.00$500.00$1,500.00$300.00$900.00$166.00$498.00$165.00$495.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT480$1.90$912.00$2.00$960.00$2.00$960.00$3.02$1,449.60$3.00$1,440.00
2105.604GEOGRIDSQ YD546$3.40$1,856.40$3.50$1,911.00$5.00$2,730.00$3.02$1,648.92$2.00$1,092.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD1,646$2.25$3,703.50$3.00$4,938.00$3.25$5,349.50$2.02$3,324.92$3.00$4,938.00
2106.521GRANULAR EMBANKMENT (CV) (P)CU YD95$22.00$2,090.00$18.00$1,710.00$25.00$2,375.00$23.68$2,249.60$23.00$2,185.00
2118.501AGGREGATE SURFACING CLASS 5TON4,126$14.80$61,064.80$13.40$55,288.40$14.90$61,477.40$15.29$63,086.54$15.24$62,880.24
2123.503MOTOR GRADERHOUR94$260.00$24,440.00$305.00$28,670.00$185.00$17,390.00$226.00$21,244.00$180.00$16,920.00
2123.5070.5 CU YD SHOVELHOUR16$250.00$4,000.00$310.00$4,960.00$155.00$2,480.00$151.00$2,416.00$225.00$3,600.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR94$190.00$17,860.00$295.00$27,730.00$140.00$13,160.00$106.00$9,964.00$180.00$16,920.00
2130.501WATERM GALLON215$45.00$9,675.00$57.00$12,255.00$30.00$6,450.00$34.00$7,310.00$45.00$9,675.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON25,000$1.15$28,750.00$1.15$28,750.00$1.05$26,250.00$1.06$26,500.00$1.50$37,500.00
2211.501AGGREGATE BASE CLASS 5TON3,300$14.70$48,510.00$8.00$26,400.00$10.75$35,475.00$10.29$33,957.00$13.30$43,890.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD780$25.00$19,500.00$23.00$17,940.00$25.00$19,500.00$27.21$21,223.80$26.00$20,280.00
2215.501FULL DEPTH RECLAMATIONSQ YD115,826$0.40$46,330.40$0.35$40,539.10$0.56$64,862.56$0.57$66,020.82$0.85$98,452.10
2215.604BASE STABILIZATION (BASE ONE)SQ YD116,140$0.44$51,101.60$0.37$42,971.80$0.57$66,199.80$0.31$36,003.40$0.70$81,298.00
2232.603MILLED RUMBLE STRIPS-INTERMITTENTLIN FT72,880$0.11$8,016.80$0.10$7,288.00$0.14$10,203.20$0.10$7,288.00$0.10$7,288.00
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON13,440$1.30$17,472.00$2.30$30,912.00$1.31$17,606.40$1.26$16,934.40$1.25$16,800.00
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON30,940$2.10$64,974.00$2.40$74,256.00$2.10$64,974.00$2.00$61,880.00$2.00$61,880.00
2356.506BITUMINOUS SEAL COATSQ YD93,740$0.46$43,120.40$0.30$28,122.00$0.47$44,057.80$0.45$42,183.00$0.45$42,183.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON13,716$2.10$28,803.60$1.50$20,574.00$2.15$29,489.40$1.56$21,396.96$2.20$30,175.20
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON4,546$2.30$10,455.80$2.00$9,092.00$2.30$10,455.80$1.82$8,273.72$2.50$11,365.00
2360.501TYPE SP 9.5 WEARING COURSE MIX (3,C)TON20,208$41.00$828,528.00$44.10$891,172.80$43.80$885,110.40$43.50$879,048.00$42.80$864,902.40
2360.502TYPE SP 12.5 NON WEAR COURSE MIX (3,C)TON13,862$40.00$554,480.00$41.90$580,817.80$42.60$590,521.20$43.25$599,531.50$41.65$577,352.30
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD3,464$12.00$41,568.00$7.50$25,980.00$11.00$38,104.00$17.38$60,204.32$17.00$58,888.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD1,484$15.00$22,260.00$12.00$17,808.00$15.00$22,260.00$22.42$33,271.28$22.00$32,648.00
2451.507GRANULAR BEDDING (P)CU YD201$31.00$6,231.00$14.00$2,814.00$32.00$6,432.00$25.70$5,165.70$25.00$5,025.00
2501.51518" RC PIPE APRONEACH3$1,100.00$3,300.00$600.00$1,800.00$600.00$1,800.00$705.00$2,115.00$700.00$2,100.00
2501.51524" RC PIPE APRONEACH14$900.00$12,600.00$650.00$9,100.00$675.00$9,450.00$907.00$12,698.00$900.00$12,600.00
2501.56118" RC PIPE CULVERT DES 3006LIN FT8$82.00$656.00$96.00$768.00$110.00$880.00$61.00$488.00$60.50$484.00
2501.56124" RC PIPE CULVERT DES 3006LIN FT380$60.00$22,800.00$50.00$19,000.00$75.00$28,500.00$43.00$16,340.00$43.00$16,340.00
2501.602CONCRETE CULVERT COLLAREACH3$1,200.00$3,600.00$1,200.00$3,600.00$1,400.00$4,200.00$756.00$2,268.00$750.00$2,250.00
2540.602MAIL BOX SUPPORTEACH2$130.00$260.00$126.25$252.50$131.25$262.50$252.00$504.00$125.00$250.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$210.00$210.00$200.00$200.00$800.00$800.00$1,000.00$1,000.00$200.00$200.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$105.00$105.00$100.00$100.00$300.00$300.00$504.00$504.00$100.00$100.00
2563.601TRAFFIC CONTROLLUMP SUM1$19,500.00$19,500.00$9,500.00$9,500.00$12,000.00$12,000.00$14,600.00$14,600.00$12,850.00$12,850.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT1,258$3.15$3,962.70$3.10$3,899.80$4.25$5,346.50$4.00$5,032.00$4.50$5,661.00
2575.572RAPID STABILIZATION METHOD 4SQ YD2,410$2.10$5,061.00$2.10$5,061.00$1.45$3,494.50$1.50$3,615.00$0.80$1,928.00
2580.603INTERIM PAVEMENT MARKINGLIN FT88,126$0.15$13,218.90$0.11$9,693.86$0.10$8,812.60$0.15$13,218.90$0.12$10,575.12
2580.603INTERIM PAVEMENT MARKINGLIN FT132,189$0.14$18,506.46$0.11$14,540.79$0.10$13,218.90$0.22$29,081.58$0.12$15,862.68
2582.5024" SOLID LINE EPOXYLIN FT10,079$0.20$2,015.80$0.19$1,915.01$0.20$2,015.80$0.19$1,915.01$0.19$1,915.01
2582.5024" DBLE SOLID LINE PAINTLIN FT14,717$0.13$1,913.21$0.12$1,766.04$0.15$2,207.55$0.12$1,766.04$0.12$1,766.04
2582.5026" SOLID LINE PAINTLIN FT74,215$0.09$6,679.35$0.08$5,937.20$0.08$5,937.20$0.08$5,937.20$0.08$5,937.20
2582.50224" SOLID LINE EPOXYLIN FT40$7.30$292.00$7.07$282.80$7.35$294.00$7.05$282.00$7.00$280.00
2582.5024" BROKEN LINE PAINTLIN FT4,550$0.06$273.00$0.06$273.00$0.06$273.00$0.06$273.00$0.06$273.00
2582.5024" DBLE SOLID LINE EPOXYLIN FT14,717$0.40$5,886.80$0.38$5,592.46$0.40$5,886.80$0.38$5,592.46$0.38$5,592.46
2582.50224" SOLID LINE PAINTLIN FT40$3.15$126.00$3.03$121.20$3.15$126.00$3.02$120.80$3.00$120.00
2582.5024" SOLID LINE PAINTLIN FT10,079$0.06$604.74$0.06$604.74$0.06$604.74$0.06$604.74$0.06$604.74
2582.5024" BROKEN LINE EPOXYLIN FT4,550$0.20$910.00$0.19$864.50$0.20$910.00$0.19$864.50$0.19$864.50
2582.5026" SOLID LINE EPOXYLIN FT74,215$0.26$19,295.90$0.25$18,553.75$0.26$19,295.90$0.25$18,553.75$0.25$18,553.75
 Totals for project CP 0007-208919 $2,132,863.16 $2,231,600.00 $2,265,923.35 $2,267,005.71 $2,326,195.74
 
Contract Total:$2,132,863.16$2,231,600.00$2,265,923.35$2,267,005.71$2,326,195.74