Contract Bid Abstract

CP 0453-367292 (Tied) - CP 0453-367292 - TH 37 to CR 592KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$2,500.00$2,500.00$1,730.00$1,730.00$1,400.00$1,400.00
2016.601QUALITY MANAGEMENT SPECIALLUMP SUM1$2,500.00$2,500.00$1,730.00$1,730.00$1,400.00$1,400.00
2021.501MOBILIZATIONLUMP SUM1$8,500.00$8,500.00$37,050.00$37,050.00$9,000.00$9,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT94$4.50$423.00$1.75$164.50$2.00$188.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD758$4.30$3,259.40$5.60$4,244.80$9.00$6,822.00
2118.609RECYCLED AGGREGATE SURFACINGTON944$17.20$16,236.80$24.77$23,382.88$32.00$30,208.00
2123.5100.5 CU YD SHOVELHOUR10$315.00$3,150.00$160.00$1,600.00$270.00$2,700.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR36$165.00$5,940.00$190.00$6,840.00$250.00$9,000.00
2123.510MOTOR GRADERHOUR36$205.00$7,380.00$190.00$6,840.00$380.00$13,680.00
2130.523WATERM GALLON119$35.00$4,165.00$45.00$5,355.00$40.00$4,760.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON5,563$1.05$5,841.15$0.92$5,117.96$1.10$6,119.30
2211.509AGGREGATE BASE CLASS 5TON1,500$12.15$18,225.00$18.83$28,245.00$21.00$31,500.00
2215.504FULL DEPTH RECLAMATIONSQ YD29,482$0.58$17,099.56$0.73$21,521.86$0.42$12,382.44
2215.604BASE STABILIZATION (BASE ONE)SQ YD30,131$0.51$15,366.81$0.94$28,323.14$0.40$12,052.40
2331.604ASPHALT OVERLAY TEXTILE (PAVING FABRIC) HEAVY DUTYSQ YD457$4.00$1,828.00$6.70$3,061.90$6.00$2,742.00
2357.506BITUMINOUS MATERIAL FOR TACK COAT (PAVING FABRIC)GALLON137$4.00$548.00$4.00$548.00$4.50$616.50
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,531$2.80$4,286.80$2.00$3,062.00$2.50$3,827.50
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON2,485$54.70$135,929.50$62.48$155,262.80$71.00$176,435.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON3,555$53.65$190,725.75$60.41$214,757.55$65.00$231,075.00
2540.602MAIL BOX SUPPORTEACH15$160.00$2,400.00$150.00$2,250.00$150.00$2,250.00
2554.602GUARDRAIL POSTEACH25$210.00$5,250.00$200.00$5,000.00$202.00$5,050.00
2554.603REALIGN STRUCTURAL PLATE GUARDRAILLIN FT500$15.00$7,500.00$10.00$5,000.00$22.20$11,100.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,500.00$2,500.00$8,460.00$8,460.00$2,424.00$2,424.00
2580.503INTERIM PAVEMENT MARKINGLIN FT5,524$0.15$828.60$0.12$662.88$0.24$1,325.76
2582.50324" SOLID LINE PREF TAPE GR INLIN FT24$30.00$720.00$28.50$684.00$26.00$624.00
2582.5034" BROKEN LINE MULTI COMPLIN FT2,246$0.25$561.50$0.24$539.04$0.22$494.12
2582.5034" SOLID LINE MULTI COMPLIN FT3,278$0.25$819.50$0.24$786.72$0.22$721.16
 Totals for project CP 0453-367292 (Tied) $464,484.37 $572,220.03 $579,897.18
 
CP 0704-367297 (Tied) - CP 0704-367297 - CSAH 60 to Karkas RoadKGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,000.00$6,000.00$5,850.00$5,850.00$2,169.78$2,169.78
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT45$4.10$184.50$1.75$78.75$2.00$90.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD22$14.50$319.00$5.98$131.56$15.00$330.00
2118.609RECYCLED AGGREGATE SURFACINGTON285$21.20$6,042.00$23.06$6,572.10$26.00$7,410.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR7$165.00$1,155.00$190.00$1,330.00$250.00$1,750.00
2123.510MOTOR GRADERHOUR7$205.00$1,435.00$190.00$1,330.00$380.00$2,660.00
2123.5100.5 CU YD SHOVELHOUR2$310.00$620.00$160.00$320.00$270.00$540.00
2130.523WATERM GALLON22$35.00$770.00$45.00$990.00$40.00$880.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,040$1.05$1,092.00$0.92$956.80$1.10$1,144.00
2211.509AGGREGATE BASE CLASS 5TON206$14.40$2,966.40$16.61$3,421.66$14.00$2,884.00
2215.504FULL DEPTH RECLAMATIONSQ YD5,633$0.75$4,224.75$0.73$4,112.09$0.44$2,478.52
2215.604BASE STABILIZATION (BASE ONE)SQ YD5,633$0.65$3,661.45$0.94$5,295.02$0.42$2,365.86
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON308$2.80$862.40$2.48$763.84$2.50$770.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON494$60.70$29,985.80$55.38$27,357.72$75.00$37,050.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON694$60.00$41,640.00$53.32$37,004.08$70.00$48,580.00
2540.602MAIL BOX SUPPORTEACH5$160.00$800.00$150.00$750.00$150.00$750.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,500.00$2,500.00$3,625.00$3,625.00$1,420.00$1,420.00
2580.503INTERIM PAVEMENT MARKINGLIN FT1,880$0.20$376.00$0.12$225.60$0.24$451.20
2582.5034" BROKEN LINE MULTI COMPLIN FT370$0.25$92.50$0.24$88.80$0.22$81.40
2582.5034" SOLID LINE MULTI COMPLIN FT1,510$0.25$377.50$0.24$362.40$0.22$332.20
2582.50324" SOLID LINE PREF TAPE GR INLIN FT12$30.00$360.00$28.50$342.00$26.00$312.00
 Totals for project CP 0704-367297 (Tied) $105,464.30 $100,907.42 $114,448.96
 
CP 9112-367298 (Tied) - CP 9112-367298 - TH 73 to TH 73KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$6,000.00$6,000.00$9,750.00$9,750.00$1,500.00$1,500.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT151$4.10$619.10$1.75$264.25$2.00$302.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD94$10.20$958.80$5.98$562.12$7.00$658.00
2118.609RECYCLED AGGREGATE SURFACINGTON183$33.15$6,066.45$29.40$5,380.20$26.00$4,758.00
2123.510MOTOR GRADERHOUR7$205.00$1,435.00$190.00$1,330.00$280.00$1,960.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR7$165.00$1,155.00$190.00$1,330.00$250.00$1,750.00
2123.5100.5 CU YD SHOVELHOUR2$315.00$630.00$160.00$320.00$270.00$540.00
2130.523WATERM GALLON25$45.00$1,125.00$45.00$1,125.00$40.00$1,000.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,170$1.05$1,228.50$0.92$1,076.40$1.10$1,287.00
2211.509AGGREGATE BASE CLASS 5TON165$16.30$2,689.50$20.21$3,334.65$15.00$2,475.00
2215.504FULL DEPTH RECLAMATIONSQ YD5,848$0.85$4,970.80$0.86$5,029.28$0.45$2,631.60
2215.604BASE STABILIZATION (BASE ONE)SQ YD5,848$0.75$4,386.00$1.19$6,959.12$0.41$2,397.68
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON317$2.80$887.60$3.03$960.51$2.50$792.50
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON505$67.30$33,986.50$65.67$33,163.35$92.00$46,460.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON528$68.80$36,326.40$63.58$33,570.24$86.00$45,408.00
2540.602MAIL BOX SUPPORTEACH4$157.50$630.00$150.00$600.00$150.00$600.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,500.00$2,500.00$4,444.00$4,444.00$1,420.00$1,420.00
2580.503INTERIM PAVEMENT MARKINGLIN FT4,290$0.20$858.00$0.12$514.80$0.24$1,029.60
2582.50324" SOLID LINE PREF TAPE GR INLIN FT24$30.00$720.00$28.50$684.00$26.00$624.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT2,145$0.50$1,072.50$0.48$1,029.60$0.44$943.80
 Totals for project CP 9112-367298 (Tied) $108,245.15 $111,427.52 $118,537.18
 
CP 9126-367299 (Tied) - CP 9126-367299 - End of Bituminous to UT 9112KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,100.00$4,100.00$15,600.00$15,600.00$800.00$800.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT60$4.10$246.00$1.75$105.00$2.00$120.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD85$15.00$1,275.00$5.99$509.15$8.00$680.00
2118.609RECYCLED AGGREGATE SURFACINGTON353$35.20$12,425.60$29.50$10,413.50$26.00$9,178.00
2123.510MOTOR GRADERHOUR12$205.00$2,460.00$190.00$2,280.00$280.00$3,360.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR12$165.00$1,980.00$190.00$2,280.00$250.00$3,000.00
2123.5100.5 CU YD SHOVELHOUR3$315.00$945.00$160.00$480.00$270.00$810.00
2130.523WATERM GALLON41$45.00$1,845.00$45.00$1,845.00$40.00$1,640.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,619$1.05$1,699.95$0.92$1,489.48$1.10$1,780.90
2211.509AGGREGATE BASE CLASS 5TON250$16.25$4,062.50$20.58$5,145.00$15.00$3,750.00
2215.504FULL DEPTH RECLAMATIONSQ YD9,189$0.85$7,810.65$1.11$10,199.79$0.43$3,951.27
2215.604BASE STABILIZATION (BASE ONE)SQ YD9,039$0.75$6,779.25$1.14$10,304.46$0.41$3,705.99
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON463$2.80$1,296.40$3.03$1,402.89$2.50$1,157.50
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON794$68.00$53,992.00$63.83$50,681.02$94.00$74,636.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON836$67.00$56,012.00$61.76$51,631.36$85.00$71,060.00
2540.602MAIL BOX SUPPORTEACH14$160.00$2,240.00$150.00$2,100.00$150.00$2,100.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,200.00$3,200.00$5,448.00$5,448.00$1,420.00$1,420.00
 Totals for project CP 9126-367299 (Tied) $162,369.35 $171,914.65 $183,149.66
 
CP 0060-348247 (Low) - CP 0060-348247 (Low), SAP 069-660-011 - TH 73 to TH 169KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENT SPECIALLUMP SUM1$1,500.00$1,500.00$1,730.00$1,730.00$1,400.00$1,400.00
2016.601QUALITY MANAGEMENTLUMP SUM1$1,500.00$1,500.00$1,730.00$1,730.00$1,400.00$1,400.00
2021.501MOBILIZATIONLUMP SUM1$59,000.00$59,000.00$64,350.00$64,350.00$20,607.53$20,607.53
2021.601RAILROAD PROTECTIVE SERVICESLUMP SUM1$7,500.00$7,500.00$7,950.00$7,950.00$11,900.00$11,900.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT483$4.50$2,173.50$1.75$845.25$2.00$966.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,073$3.50$3,755.50$6.94$7,446.62$5.79$6,212.67
2104.618REMOVE STONE PAVERSSQ FT214$2.60$556.40$3.37$721.18$2.00$428.00
2118.609RECYCLED AGGREGATE SURFACINGTON1,975$16.30$32,192.50$23.00$45,425.00$28.00$55,300.00
2123.510MOTOR GRADERHOUR48$205.00$9,840.00$190.00$9,120.00$380.00$18,240.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR48$160.00$7,680.00$190.00$9,120.00$250.00$12,000.00
2123.5100.5 CU YD SHOVELHOUR13$310.00$4,030.00$160.00$2,080.00$270.00$3,510.00
2130.523WATERM GALLON161$35.00$5,635.00$45.00$7,245.00$40.00$6,440.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON9,311$1.05$9,776.55$0.92$8,566.12$1.10$10,242.10
2211.509AGGREGATE BASE CLASS 5TON1,699$12.10$20,557.90$16.80$28,543.20$14.25$24,210.75
2215.504FULL DEPTH RECLAMATIONSQ YD49,567$0.58$28,748.86$0.73$36,183.91$0.40$19,826.80
2215.604BASE STABILIZATION (BASE ONE)SQ YD49,567$0.55$27,261.85$0.94$46,592.98$0.40$19,826.80
2221.509SHOULDER BASE AGGREGATE CLASS 5TON1,003$15.00$15,045.00$20.53$20,591.59$24.00$24,072.00
2232.504MILL BITUMINOUS SURFACE (2.0")SQ YD51,762$1.10$56,938.20$0.80$41,409.60$0.90$46,585.80
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON2,247$2.80$6,291.60$2.49$5,595.03$2.50$5,617.50
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON5,705$57.40$327,467.00$58.24$332,259.20$76.00$433,580.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON5,014$57.00$285,798.00$56.17$281,636.38$71.00$355,994.00
2540.602MAIL BOX SUPPORTEACH31$160.00$4,960.00$150.00$4,650.00$150.00$4,650.00
2563.601TRAFFIC CONTROLLUMP SUM1$5,100.00$5,100.00$12,300.00$12,300.00$4,242.00$4,242.00
2580.503INTERIM PAVEMENT MARKINGLIN FT12,760$0.15$1,914.00$0.12$1,531.20$0.24$3,062.40
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT1,500$0.50$750.00$0.48$720.00$0.44$660.00
2582.50324" SOLID LINE PREF TAPE GR INLIN FT124$28.00$3,472.00$28.50$3,534.00$26.00$3,224.00
2582.5034" BROKEN LINE MULTI COMPLIN FT2,520$0.25$630.00$0.24$604.80$0.22$554.40
2582.5034" SOLID LINE MULTI COMPLIN FT7,240$0.25$1,810.00$0.24$1,737.60$0.22$1,592.80
2582.5036" SOLID LINE MULTI COMPLIN FT28,744$0.35$10,060.40$0.32$9,198.08$0.30$8,623.20
2582.518PAVT MSSG PREF TAPE GR INSQ FT123.44$45.00$5,554.80$45.00$5,554.80$42.00$5,184.48
 Totals for project CP 0060-348247 (Low) $947,499.06 $998,971.54 $1,110,153.23
 
CP 0592-400887 (Tied) - CP 0592-400887 - CR 453 to CSAH 92KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$2,500.00$2,500.00$1,680.00$1,680.00$1,400.00$1,400.00
2016.601QUALITY MANAGEMENT SPECIALLUMP SUM1$2,500.00$2,500.00$1,680.00$1,680.00$1,400.00$1,400.00
2021.501MOBILIZATIONLUMP SUM1$12,000.00$12,000.00$35,100.00$35,100.00$3,500.00$3,500.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT48$6.00$288.00$1.75$84.00$2.00$96.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD39$25.00$975.00$12.10$471.90$12.00$468.00
2105.604GEOGRIDSQ YD6,977$3.60$25,117.20$2.05$14,302.85$4.00$27,908.00
2118.609RECYCLED AGGREGATE SURFACINGTON857$17.50$14,997.50$25.78$22,093.46$31.50$26,995.50
2123.5108 TON STEEL-WHEELED ROLLERHOUR27$165.00$4,455.00$190.00$5,130.00$250.00$6,750.00
2123.510MOTOR GRADERHOUR27$205.00$5,535.00$190.00$5,130.00$380.00$10,260.00
2123.5100.5 CU YD SHOVELHOUR8$310.00$2,480.00$160.00$1,280.00$270.00$2,160.00
2130.523WATERM GALLON89$35.00$3,115.00$45.00$4,005.00$40.00$3,560.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON4,183$1.05$4,392.15$0.92$3,848.36$1.10$4,601.30
2211.509AGGREGATE BASE CLASS 5TON4,998$12.00$59,976.00$18.10$90,463.80$15.00$74,970.00
2215.504FULL DEPTH RECLAMATIONSQ YD23,198$0.58$13,454.84$0.73$16,934.54$0.42$9,743.16
2215.604BASE STABILIZATION (BASE ONE)SQ YD23,198$0.51$11,830.98$1.10$25,517.80$0.40$9,279.20
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,180$2.80$3,304.00$2.48$2,926.40$2.50$2,950.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON1,912$55.10$105,351.20$62.70$119,882.40$70.00$133,840.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON2,734$52.50$143,535.00$60.63$165,762.42$65.00$177,710.00
2540.602MAIL BOX SUPPORTEACH4$160.00$640.00$150.00$600.00$150.00$600.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,500.00$2,500.00$7,455.00$7,455.00$2,424.00$2,424.00
2580.503INTERIM PAVEMENT MARKINGLIN FT12,925$0.15$1,938.75$0.12$1,551.00$0.24$3,102.00
2582.5034" BROKEN LINE MULTI COMPLIN FT514$0.25$128.50$0.24$123.36$0.22$113.08
2582.5034" SOLID LINE MULTI COMPLIN FT1,967$0.25$491.75$0.24$472.08$0.22$432.74
2582.50324" SOLID LINE PREF TAPE GR INLIN FT24$30.00$720.00$28.50$684.00$26.00$624.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT5,222$0.50$2,611.00$0.48$2,506.56$0.44$2,297.68
 Totals for project CP 0592-400887 (Tied) $424,836.87 $529,684.93 $507,184.66
 
CP 9108-475815 (Tied) - CP 9108-475815 - End of Bituminous to S Town Line RdKGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,500.00$4,500.00$9,750.00$9,750.00$7,000.00$7,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT21$6.90$144.90$1.75$36.75$2.00$42.00
2118.609RECYCLED AGGREGATE SURFACINGTON105$30.20$3,171.00$23.24$2,440.20$26.00$2,730.00
2123.510MOTOR GRADERHOUR9$205.00$1,845.00$190.00$1,710.00$280.00$2,520.00
2123.5100.5 CU YD SHOVELHOUR3$350.00$1,050.00$160.00$480.00$270.00$810.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR9$165.00$1,485.00$190.00$1,710.00$250.00$2,250.00
2130.523WATERM GALLON31$35.00$1,085.00$45.00$1,395.00$40.00$1,240.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,320$1.05$1,386.00$0.92$1,214.40$1.10$1,452.00
2211.509AGGREGATE BASE CLASS 5TON797$14.90$11,875.30$16.80$13,389.60$15.00$11,955.00
2215.604BASE STABILIZATION (BASE ONE)SQ YD6,600$0.65$4,290.00$1.14$7,524.00$0.50$3,300.00
2232.504MILL BITUMINOUS SURFACE (5.0")SQ YD6,600$3.70$24,420.00$2.42$15,972.00$3.00$19,800.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON358$2.80$1,002.40$2.48$887.84$2.50$895.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON582$61.75$35,938.50$59.28$34,500.96$89.00$51,798.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON809$59.85$48,418.65$57.16$46,242.44$85.00$68,765.00
2540.602MAIL BOX SUPPORTEACH9$160.00$1,440.00$150.00$1,350.00$150.00$1,350.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,500.00$2,500.00$4,365.00$4,365.00$1,010.00$1,010.00
 Totals for project CP 9108-475815 (Tied) $144,551.75 $142,968.19 $176,917.00
 
CP 9112-475837 (Tied) - CP 9112-475837 - TH 73 to End of BituminousKGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,100.00$4,100.00$3,900.00$3,900.00$7,761.15$7,761.15
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT114$4.10$467.40$1.75$199.50$2.00$228.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD64$10.00$640.00$5.99$383.36$8.00$512.00
2118.509AGGREGATE SURFACING CLASS 5TON80$41.55$3,324.00$73.50$5,880.00$51.00$4,080.00
2123.510MOTOR GRADERHOUR3$205.00$615.00$190.00$570.00$280.00$840.00
2123.5100.5 CU YD SHOVELHOUR1$315.00$315.00$160.00$160.00$270.00$270.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR3$170.00$510.00$190.00$570.00$250.00$750.00
2130.523WATERM GALLON9$45.00$405.00$45.00$405.00$40.00$360.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON401$1.05$421.05$0.92$368.92$1.10$441.10
2211.509AGGREGATE BASE CLASS 5TON155$16.80$2,604.00$17.91$2,776.05$15.00$2,325.00
2215.504FULL DEPTH RECLAMATIONSQ YD2,004$0.95$1,903.80$1.91$3,827.64$0.60$1,202.40
2215.604BASE STABILIZATION (BASE ONE)SQ YD2,004$0.75$1,503.00$1.97$3,947.88$0.55$1,102.20
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON132$2.80$369.60$3.01$397.32$2.50$330.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON192$72.00$13,824.00$87.67$16,832.64$98.00$18,816.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON201$74.00$14,874.00$85.73$17,231.73$88.00$17,688.00
2540.602MAIL BOX SUPPORTEACH5$160.00$800.00$150.00$750.00$150.00$750.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,000.00$2,000.00$4,444.00$4,444.00$1,420.00$1,420.00
 Totals for project CP 9112-475837 (Tied) $48,675.85 $62,644.04 $58,875.85
 
CP 9129-475839 (Tied) - CP 9129-475839 - TH 73 to TH 73KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,200.00$4,200.00$3,900.00$3,900.00$505.00$505.00
2118.509AGGREGATE SURFACING CLASS 5TON25$33.75$843.75$132.70$3,317.50$37.00$925.00
2123.5100.5 CU YD SHOVELHOUR2$315.00$630.00$160.00$320.00$270.00$540.00
2211.509AGGREGATE BASE CLASS 5TON50$18.90$945.00$35.51$1,775.50$18.00$900.00
2232.504MILL BITUMINOUS SURFACE (1.0")SQ YD4,660$1.90$8,854.00$1.07$4,986.20$2.00$9,320.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON359$2.80$1,005.20$2.49$893.91$2.50$897.50
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON268$67.15$17,996.20$87.81$23,533.08$94.00$25,192.00
2540.602MAIL BOX SUPPORTEACH12$160.00$1,920.00$150.00$1,800.00$150.00$1,800.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,500.00$3,500.00$2,922.00$2,922.00$1,420.00$1,420.00
 Totals for project CP 9129-475839 (Tied) $39,894.15 $43,448.19 $41,499.50
 
CP 0000-505304 (Tied) - CP 0000-505304 - UT 9108 to TH 73 (City of Hibbing segment)KGM Contractors, Inc Hawkinson Construction Co., Inc Ulland Brothers, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$4,100.00$4,100.00$9,750.00$9,750.00$594.18$594.18
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT75$4.10$307.50$1.75$131.25$2.00$150.00
2118.609RECYCLED AGGREGATE SURFACINGTON396$25.90$10,256.40$23.06$9,131.76$28.00$11,088.00
2123.510MOTOR GRADERHOUR7$205.00$1,435.00$190.00$1,330.00$280.00$1,960.00
2123.5100.5 CU YD SHOVELHOUR2$315.00$630.00$160.00$320.00$270.00$540.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR7$160.00$1,120.00$190.00$1,330.00$250.00$1,750.00
2130.523WATERM GALLON23$45.00$1,035.00$45.00$1,035.00$40.00$920.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,021$1.05$1,072.05$0.92$939.32$1.10$1,123.10
2215.504FULL DEPTH RECLAMATIONSQ YD5,589$0.85$4,750.65$1.04$5,812.56$0.50$2,794.50
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON570$2.80$1,596.00$2.48$1,413.60$2.50$1,425.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON954$63.00$60,102.00$59.21$56,486.34$91.00$86,814.00
2360.509TYPE SP 12.5 NON WEAR COURSE MIX (2;C)TON977$62.50$61,062.50$57.16$55,845.32$84.00$82,068.00
2540.602MAIL BOX SUPPORTEACH2$160.00$320.00$150.00$300.00$150.00$300.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,900.00$1,900.00$4,364.00$4,364.00$1,010.00$1,010.00
 Totals for project CP 0000-505304 (Tied) $149,687.10 $148,189.15 $192,536.78
 
Contract Total:$2,595,707.95$2,882,375.66$3,083,200.00