Bid Abstract

CP 0060-426225 - CP 0060-426225, SAP 069-660-012 - Bridge 829, 830 and CulvertsCasper Construction, Inc. KGM Contractors, Inc Landwehr Construction, Inc. Ulland Brothers, Inc. Hoover Construction Company George Bougalis and Sons Co. Utility Systems of America, Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.3$30,462.81$9,138.84$35,000.00$10,500.00$32,250.00$9,675.00$65,912.93$19,773.88$59,000.00$17,700.00$150,000.00$45,000.00$63,500.00$19,050.00
2021.501MOBILIZATIONLUMP SUM0.3$30,462.81$9,138.84$35,000.00$10,500.00$32,250.00$9,675.00$65,912.93$19,773.88$59,000.00$17,700.00$150,000.00$45,000.00$63,500.00$19,050.00
2021.501MOBILIZATIONLUMP SUM0.4$30,462.81$12,185.12$35,000.00$14,000.00$32,250.00$12,900.00$65,912.93$26,365.17$59,000.00$23,600.00$150,000.00$60,000.00$63,500.00$25,400.00
2101.501CLEARING & GRUBBINGLUMP SUM1$850.00$850.00$2,300.00$2,300.00$4,500.00$4,500.00$1,300.00$1,300.00$2,300.00$2,300.00$2,500.00$2,500.00$2,500.00$2,500.00
2101.501CLEARING & GRUBBINGLUMP SUM1$850.00$850.00$2,300.00$2,300.00$4,500.00$4,500.00$1,300.00$1,300.00$2,300.00$2,300.00$2,500.00$2,500.00$2,500.00$2,500.00
2104.503REMOVE PIPE CULVERTSLIN FT696$4.50$3,132.00$9.50$6,612.00$9.50$6,612.00$4.75$3,306.00$10.00$6,960.00$5.00$3,480.00$9.00$6,264.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT506$1.85$936.10$2.80$1,416.80$1.50$759.00$1.75$885.50$3.00$1,518.00$3.00$1,518.00$4.50$2,277.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT64$1.85$118.40$2.80$179.20$1.50$96.00$1.75$112.00$3.00$192.00$3.00$192.00$4.50$288.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT64$1.85$118.40$2.80$179.20$1.50$96.00$1.75$112.00$3.00$192.00$3.00$192.00$4.50$288.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,573$1.25$1,966.25$2.50$3,932.50$1.60$2,516.80$2.00$3,146.00$2.05$3,224.65$3.50$5,505.50$2.20$3,460.60
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,735$1.25$2,168.75$2.50$4,337.50$1.60$2,776.00$2.00$3,470.00$2.05$3,556.75$3.50$6,072.50$2.20$3,817.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD2,061$1.25$2,576.25$2.50$5,152.50$1.60$3,297.60$2.00$4,122.00$2.05$4,225.05$3.50$7,213.50$2.20$4,534.20
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD1,975$1.65$3,258.75$3.20$6,320.00$2.00$3,950.00$2.00$3,950.00$2.85$5,628.75$2.55$5,036.25$1.80$3,555.00
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD765$1.65$1,262.25$3.20$2,448.00$2.00$1,530.00$2.00$1,530.00$2.85$2,180.25$2.55$1,950.75$1.80$1,377.00
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD733$1.65$1,209.45$3.20$2,345.60$2.00$1,466.00$2.00$1,466.00$2.85$2,089.05$2.55$1,869.15$1.80$1,319.40
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$6,000.00$6,000.00$3,900.00$3,900.00$6,350.00$6,350.00$12,750.00$12,750.00$7,500.00$7,500.00$7,500.00$7,500.00$10,000.00$10,000.00
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$6,000.00$6,000.00$3,900.00$3,900.00$6,350.00$6,350.00$12,750.00$12,750.00$7,500.00$7,500.00$7,500.00$7,500.00$10,000.00$10,000.00
2105.602DEWATERINGEACH1$1,150.00$1,150.00$2,250.00$2,250.00$3,675.00$3,675.00$3,750.00$3,750.00$3,000.00$3,000.00$4,700.00$4,700.00$5,000.00$5,000.00
2105.602DEWATERINGEACH1$1,150.00$1,150.00$2,250.00$2,250.00$3,675.00$3,675.00$3,750.00$3,750.00$3,000.00$3,000.00$4,700.00$4,700.00$5,000.00$5,000.00
2106.507SELECT GRANULAR EMBANKMENT (CV)CU YD1,350$16.25$21,937.50$15.35$20,722.50$16.25$21,937.50$16.50$22,275.00$18.00$24,300.00$13.70$18,495.00$21.00$28,350.00
2106.507SELECT GRANULAR EMBANKMENT (CV)CU YD1,043$16.25$16,948.75$15.35$16,010.05$16.25$16,948.75$16.50$17,209.50$18.00$18,774.00$13.70$14,289.10$21.00$21,903.00
2106.507EXCAVATION - COMMONCU YD1,828$8.50$15,538.00$10.00$18,280.00$8.50$15,538.00$14.50$26,506.00$8.00$14,624.00$11.00$20,108.00$14.00$25,592.00
2106.507EXCAVATION - COMMONCU YD1,495$8.50$12,707.50$10.00$14,950.00$8.50$12,707.50$14.50$21,677.50$8.00$11,960.00$11.00$16,445.00$14.00$20,930.00
2106.507GRANULAR EMBANKMENT (CV)CU YD310$17.00$5,270.00$15.35$4,758.50$16.20$5,022.00$16.50$5,115.00$18.00$5,580.00$13.70$4,247.00$6.00$1,860.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV)CU YD1,767$15.00$26,505.00$15.35$27,123.45$16.25$28,713.75$16.50$29,155.50$16.00$28,272.00$13.70$24,207.90$24.00$42,408.00
2106.507GRANULAR EMBANKMENT (CV)CU YD181$17.00$3,077.00$15.35$2,778.35$16.20$2,932.20$16.50$2,986.50$18.00$3,258.00$13.70$2,479.70$6.00$1,086.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV)CU YD1,570$15.00$23,550.00$15.35$24,099.50$16.25$25,512.50$16.50$25,905.00$16.00$25,120.00$13.70$21,509.00$24.00$37,680.00
2106.507EXCAVATION - COMMONCU YD17$8.50$144.50$10.00$170.00$8.50$144.50$14.50$246.50$8.00$136.00$11.00$187.00$14.00$238.00
2118.507AGGREGATE SURFACING (CV) CLASS 5CU YD30$38.75$1,162.50$38.30$1,149.00$42.00$1,260.00$50.00$1,500.00$35.00$1,050.00$65.00$1,950.00$40.00$1,200.00
2211.507AGGREGATE BASE (CV) CLASS 5CU YD605$32.50$19,662.50$20.00$12,100.00$33.50$20,267.50$28.00$16,940.00$31.00$18,755.00$28.00$16,940.00$27.00$16,335.00
2211.507AGGREGATE BASE (CV) CLASS 5CU YD548$32.50$17,810.00$20.00$10,960.00$33.50$18,358.00$28.00$15,344.00$31.00$16,988.00$28.00$15,344.00$27.00$14,796.00
2211.507AGGREGATE BASE (CV) CLASS 5CU YD593$32.50$19,272.50$20.00$11,860.00$33.50$19,865.50$28.00$16,604.00$31.00$18,383.00$28.00$16,604.00$27.00$16,011.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON77$5.00$385.00$3.75$288.75$5.60$431.20$5.00$385.00$5.00$385.00$5.50$423.50$6.00$462.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON83$5.00$415.00$3.75$311.25$5.60$464.80$5.00$415.00$5.00$415.00$5.50$456.50$6.00$498.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON531$81.00$43,011.00$77.50$41,152.50$91.00$48,321.00$90.00$47,790.00$85.00$45,135.00$83.00$44,073.00$83.00$44,073.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON590$81.00$47,790.00$77.50$45,725.00$91.00$53,690.00$90.00$53,100.00$85.00$50,150.00$83.00$48,970.00$83.00$48,970.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON354$81.00$28,674.00$77.50$27,435.00$91.00$32,214.00$90.00$31,860.00$85.00$30,090.00$83.00$29,382.00$83.00$29,382.00
2411.507GRANULAR BACKFILL (CV)CU YD1,893$11.50$21,769.50$13.00$24,609.00$16.25$30,761.25$16.50$31,234.50$22.50$42,592.50$13.70$25,934.10$21.00$39,753.00
2412.50214X9 PRECAST CONCRETE BOX CULV END SECTEACH2$21,240.00$42,480.00$18,500.00$37,000.00$18,050.00$36,100.00$18,500.00$37,000.00$21,150.00$42,300.00$27,000.00$54,000.00$20,000.00$40,000.00
2412.50214X10 PRECAST CONCRETE BOX CULV END SECTEACH2$23,800.00$47,600.00$21,000.00$42,000.00$20,555.00$41,110.00$20,500.00$41,000.00$23,400.00$46,800.00$28,000.00$56,000.00$22,500.00$45,000.00
2412.50314X10 PRECAST CONCRETE BOX CULVERTLIN FT52$1,365.00$70,980.00$1,240.00$64,480.00$1,285.00$66,820.00$1,325.00$68,900.00$1,342.00$69,784.00$1,125.00$58,500.00$1,745.00$90,740.00
2412.50314X9 PRECAST CONCRETE BOX CULVERTLIN FT52$1,305.00$67,860.00$1,185.00$61,620.00$1,225.00$63,700.00$1,275.00$66,300.00$1,285.00$66,820.00$1,100.00$57,200.00$1,645.00$85,540.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$1,500.00$1,500.00$1,000.00$1,000.00$5,800.00$5,800.00$2,500.00$2,500.00$3,300.00$3,300.00$950.00$950.00$2,200.00$2,200.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$1,500.00$1,500.00$1,000.00$1,000.00$5,800.00$5,800.00$2,500.00$2,500.00$3,300.00$3,300.00$950.00$950.00$2,200.00$2,200.00
2451.507COARSE AGGREGATE BEDDING (CV)CU YD193$45.00$8,685.00$38.00$7,334.00$44.50$8,588.50$45.00$8,685.00$40.00$7,720.00$38.00$7,334.00$36.00$6,948.00
2451.507COARSE AGGREGATE BEDDING (CV)CU YD203$45.00$9,135.00$38.00$7,714.00$44.50$9,033.50$45.00$9,135.00$40.00$8,120.00$38.00$7,714.00$36.00$7,308.00
2451.507GRANULAR BEDDING (CV)CU YD438$16.50$7,227.00$23.00$10,074.00$18.00$7,884.00$16.50$7,227.00$23.50$10,293.00$13.70$6,000.60$24.00$10,512.00
2501.50224" RC PIPE APRONEACH10$760.00$7,600.00$845.00$8,450.00$725.00$7,250.00$950.00$9,500.00$910.00$9,100.00$780.00$7,800.00$900.00$9,000.00
2501.50242" RC PIPE APRONEACH2$1,690.00$3,380.00$1,975.00$3,950.00$1,715.00$3,430.00$2,000.00$4,000.00$1,650.00$3,300.00$1,800.00$3,600.00$2,000.00$4,000.00
2501.50222" SPAN RC PIPE-ARCH APRONEACH2$690.00$1,380.00$800.00$1,600.00$660.00$1,320.00$875.00$1,750.00$850.00$1,700.00$800.00$1,600.00$900.00$1,800.00
2501.50228" SPAN RC PIPE-ARCH APRONEACH2$775.00$1,550.00$865.00$1,730.00$740.00$1,480.00$875.00$1,750.00$925.00$1,850.00$1,000.00$2,000.00$1,000.00$2,000.00
2501.50258" SPAN RC PIPE-ARCH APRONEACH4$1,850.00$7,400.00$2,900.00$11,600.00$1,750.00$7,000.00$2,250.00$9,000.00$2,600.00$10,400.00$2,300.00$9,200.00$2,500.00$10,000.00
2501.50258" SPAN RC PIPE-ARCH APRONEACH4$1,850.00$7,400.00$2,900.00$11,600.00$1,750.00$7,000.00$2,250.00$9,000.00$2,600.00$10,400.00$2,300.00$9,200.00$2,500.00$10,000.00
2501.502INSTALL CULVERT MARKEREACH4$75.00$300.00$90.00$360.00$135.00$540.00$150.00$600.00$105.00$420.00$50.00$200.00$250.00$1,000.00
2501.502INSTALL CULVERT MARKEREACH4$75.00$300.00$90.00$360.00$135.00$540.00$150.00$600.00$105.00$420.00$50.00$200.00$250.00$1,000.00
2501.50358" SPAN RC PIPE-ARCH CULV CL IIALIN FT120$215.00$25,800.00$305.00$36,600.00$225.00$27,000.00$215.00$25,800.00$236.00$28,320.00$285.00$34,200.00$325.00$39,000.00
2501.50358" SPAN RC PIPE-ARCH CULV CL IIALIN FT140$215.00$30,100.00$305.00$42,700.00$225.00$31,500.00$215.00$30,100.00$236.00$33,040.00$285.00$39,900.00$325.00$45,500.00
2501.50324" RC PIPE CULVERTLIN FT494$48.75$24,082.50$79.00$39,026.00$68.00$33,592.00$62.00$30,628.00$90.50$44,707.00$73.00$36,062.00$142.00$70,148.00
2501.50342" RC PIPE CULVERTLIN FT52$131.50$6,838.00$230.00$11,960.00$145.00$7,540.00$150.00$7,800.00$163.00$8,476.00$180.00$9,360.00$262.00$13,624.00
2501.50322" SPAN RC PIPE-ARCH CULV CL IIALIN FT42$83.25$3,496.50$110.00$4,620.00$100.00$4,200.00$90.00$3,780.00$106.00$4,452.00$100.00$4,200.00$258.00$10,836.00
2501.50328" SPAN RC PIPE-ARCH CULV CL IIALIN FT76$103.50$7,866.00$125.00$9,500.00$105.00$7,980.00$105.00$7,980.00$122.00$9,272.00$150.00$11,400.00$205.00$15,580.00
2501.507CULVERT EXCAVATION CLASS UCU YD1,784$10.00$17,840.00$12.40$22,121.60$12.00$21,408.00$13.00$23,192.00$11.35$20,248.40$13.70$24,440.80$5.00$8,920.00
2501.507CULVERT EXCAVATION CLASS UCU YD1,600$10.00$16,000.00$12.40$19,840.00$12.00$19,200.00$13.00$20,800.00$11.35$18,160.00$13.70$21,920.00$5.00$8,000.00
2501.507CULVERT EXCAVATION CLASS UCU YD6,566$10.00$65,660.00$12.40$81,418.40$12.00$78,792.00$13.00$85,358.00$11.35$74,524.10$13.70$89,954.20$5.00$32,830.00
2511.507RANDOM RIPRAP CLASS IIICU YD32$60.00$1,920.00$60.00$1,920.00$74.00$2,368.00$80.00$2,560.00$55.00$1,760.00$59.00$1,888.00$55.00$1,760.00
2511.507RANDOM RIPRAP CLASS IIICU YD32$60.00$1,920.00$60.00$1,920.00$74.00$2,368.00$80.00$2,560.00$55.00$1,760.00$59.00$1,888.00$55.00$1,760.00
2511.507RANDOM RIPRAP CLASS IICU YD28$60.00$1,680.00$60.00$1,680.00$78.00$2,184.00$80.00$2,240.00$55.00$1,540.00$59.00$1,652.00$65.00$1,820.00
2540.602RELOCATE MAIL BOXEACH1$100.00$100.00$105.00$105.00$480.00$480.00$100.00$100.00$215.00$215.00$120.00$120.00$150.00$150.00
2563.601TRAFFIC CONTROLLUMP SUM0.3$2,900.00$870.00$4,400.00$1,320.00$5,590.00$1,677.00$2,900.00$870.00$3,000.00$900.00$3,500.00$1,050.00$5,500.00$1,650.00
2563.601TRAFFIC CONTROLLUMP SUM0.3$2,900.00$870.00$4,400.00$1,320.00$5,590.00$1,677.00$2,900.00$870.00$3,000.00$900.00$3,500.00$1,050.00$5,500.00$1,650.00
2563.601TRAFFIC CONTROLLUMP SUM0.4$2,900.00$1,160.00$4,400.00$1,760.00$5,590.00$2,236.00$2,900.00$1,160.00$3,000.00$1,200.00$3,500.00$1,400.00$5,500.00$2,200.00
2573.502CULVERT END CONTROLSEACH8$100.00$800.00$290.00$2,320.00$305.00$2,440.00$275.00$2,200.00$105.00$840.00$150.00$1,200.00$150.00$1,200.00
2573.503SILT FENCE; TYPE HILIN FT920$2.90$2,668.00$2.75$2,530.00$3.00$2,760.00$2.60$2,392.00$3.00$2,760.00$4.00$3,680.00$3.25$2,990.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT365$4.00$1,460.00$2.70$985.50$2.85$1,040.25$2.25$821.25$4.00$1,460.00$5.00$1,825.00$5.00$1,825.00
2573.503SILT FENCE; TYPE HILIN FT1,070$2.90$3,103.00$2.75$2,942.50$3.00$3,210.00$2.60$2,782.00$3.00$3,210.00$4.00$4,280.00$3.25$3,477.50
2573.503SILT FENCE; TYPE HILIN FT1,355$2.90$3,929.50$2.75$3,726.25$3.00$4,065.00$2.60$3,523.00$3.00$4,065.00$4.00$5,420.00$3.25$4,403.75
2574.507COMMON TOPSOIL BORROWCU YD230$35.00$8,050.00$10.00$2,300.00$22.00$5,060.00$20.00$4,600.00$23.00$5,290.00$9.00$2,070.00$25.00$5,750.00
2574.507COMMON TOPSOIL BORROWCU YD216$35.00$7,560.00$10.00$2,160.00$22.00$4,752.00$20.00$4,320.00$23.00$4,968.00$9.00$1,944.00$25.00$5,400.00
2574.508FERTILIZER TYPE 3POUND175$0.60$105.00$0.89$155.75$1.10$192.50$0.85$148.75$1.00$175.00$1.00$175.00$0.75$131.25
2574.508FERTILIZER TYPE 3POUND193$0.60$115.80$0.89$171.77$1.10$212.30$0.85$164.05$1.00$193.00$1.00$193.00$0.75$144.75
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD2,620$1.50$3,930.00$2.30$6,026.00$1.80$4,716.00$1.55$4,061.00$1.55$4,061.00$2.00$5,240.00$1.75$4,585.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD2,470$1.50$3,705.00$2.30$5,681.00$1.80$4,446.00$1.55$3,828.50$1.55$3,828.50$2.00$4,940.00$1.75$4,322.50
2575.504RAPID STABILIZATION METHOD 4SQ YD4,124$1.55$6,392.20$1.70$7,010.80$1.80$7,423.20$1.62$6,680.88$1.60$6,598.40$2.00$8,248.00$1.75$7,217.00
2575.505SEEDINGACRE0.5$100.00$50.00$105.00$52.50$115.00$57.50$100.00$50.00$105.00$52.50$110.00$55.00$150.00$75.00
2575.505SEEDINGACRE0.55$100.00$55.00$105.00$57.75$115.00$63.25$100.00$55.00$105.00$57.75$110.00$60.50$150.00$82.50
2575.508SEED MIXTURE 25-141POUND33$4.30$141.90$3.60$118.80$4.00$132.00$3.40$112.20$4.40$145.20$5.00$165.00$5.00$165.00
2575.508SEED MIXTURE 25-141POUND30$4.30$129.00$3.60$108.00$4.00$120.00$3.40$102.00$4.40$132.00$5.00$150.00$5.00$150.00
2575.523RAPID STABILIZATION METHOD 3M GALLON6$550.00$3,300.00$52.50$315.00$665.00$3,990.00$595.00$3,570.00$565.00$3,390.00$570.00$3,420.00$600.00$3,600.00
2575.523RAPID STABILIZATION METHOD 3M GALLON6.6$550.00$3,630.00$52.50$346.50$665.00$4,389.00$595.00$3,927.00$565.00$3,729.00$570.00$3,762.00$600.00$3,960.00
2582.5034" SOLID LINE PAINTLIN FT1,200$0.34$408.00$0.35$420.00$1.20$1,440.00$0.34$408.00$1.00$1,200.00$1.00$1,200.00$1.00$1,200.00
2582.5034" SOLID LINE PAINTLIN FT1,000$0.34$340.00$0.35$350.00$1.20$1,200.00$0.34$340.00$1.00$1,000.00$1.00$1,000.00$1.00$1,000.00
2582.5034" BROKEN LINE PAINTLIN FT90$0.95$85.50$1.00$90.00$1.20$108.00$0.95$85.50$1.00$90.00$1.00$90.00$2.00$180.00
2582.5034" BROKEN LINE PAINTLIN FT100$0.95$95.00$1.00$100.00$1.20$120.00$0.95$95.00$1.00$100.00$1.00$100.00$2.00$200.00
2582.5034" DBLE SOLID LINE PAINTLIN FT122$0.70$85.40$0.75$91.50$2.10$256.20$0.70$85.40$2.00$244.00$2.00$244.00$3.00$366.00
2582.5034" SOLID LINE PAINTLIN FT426$0.34$144.84$0.35$149.10$1.20$511.20$0.34$144.84$1.00$426.00$1.00$426.00$1.00$426.00
2582.50324" SOLID LINE PAINTLIN FT12$3.00$36.00$3.15$37.80$9.00$108.00$3.00$36.00$10.00$120.00$8.25$99.00$9.00$108.00
2582.5034" BROKEN LINE PAINTLIN FT80$0.95$76.00$1.00$80.00$1.20$96.00$0.95$76.00$1.00$80.00$1.00$80.00$2.00$160.00
2582.518PAVT MSSG PAINTSQ FT124$2.30$285.20$2.45$303.80$9.00$1,116.00$2.30$285.20$10.00$1,240.00$8.25$1,023.00$9.00$1,116.00
 Totals for project CP 0060-426225 $931,999.99 $977,619.47 $1,011,111.75 $1,060,000.00 $1,065,290.85 $1,148,497.55 $1,156,118.45
 
Contract Total:$931,999.99$977,619.47$1,011,111.75$1,060,000.00$1,065,290.85$1,148,497.55$1,156,118.45