Contract Bid Abstract

CP 0070-276153 (Low) - CP 0070-276153, SAP 069-670-007 (Low) Reclaim & OverlayHawkinson Construction Co., Inc Knife River Materials FKA Northstar Materials, Inc. KGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$1,000.00$1,000.00$4,100.00$4,100.00$4,500.00$4,500.00$500.00$500.00$300.00$300.00
2021.501MOBILIZATIONLUMP SUM1$40,000.00$40,000.00$28,200.00$28,200.00$47,000.00$47,000.00$113,868.42$113,868.42$2,600.00$2,600.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT725$1.75$1,268.75$1.00$725.00$3.00$2,175.00$1.95$1,413.75$2.00$1,450.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD2,831$4.15$11,748.65$5.00$14,155.00$1.90$5,378.90$3.00$8,493.00$4.00$11,324.00
2118.509AGGREGATE SURFACING CLASS 5TON5,749$13.90$79,911.10$14.00$80,486.00$13.30$76,461.70$16.25$93,421.25$23.00$132,227.00
2123.5100.5 CU YD SHOVELHOUR28$175.00$4,900.00$180.00$5,040.00$320.00$8,960.00$200.00$5,600.00$315.00$8,820.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR101$180.00$18,180.00$125.00$12,625.00$230.00$23,230.00$240.00$24,240.00$200.00$20,200.00
2123.510MOTOR GRADERHOUR101$180.00$18,180.00$150.00$15,150.00$205.00$20,705.00$255.00$25,755.00$260.00$26,260.00
2130.523WATERM GALLON336$42.00$14,112.00$22.00$7,392.00$33.00$11,088.00$40.00$13,440.00$45.00$15,120.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON17,161$1.05$18,019.05$1.20$20,593.20$1.05$18,019.05$0.96$16,474.56$1.05$18,019.05
2211.509AGGREGATE BASE CLASS 5TON4,101$10.90$44,700.90$10.50$43,060.50$9.50$38,959.50$13.00$53,313.00$19.00$77,919.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD116,556$0.45$52,450.20$0.51$59,443.56$0.57$66,436.92$0.42$48,953.52$0.45$52,450.20
2215.504FULL DEPTH RECLAMATIONSQ YD116,556$0.60$69,933.60$0.63$73,430.28$0.51$59,443.56$0.34$39,629.04$0.38$44,291.28
2221.509SHOULDER BASE AGGREGATE CLASS 5TON1,994$12.00$23,928.00$10.50$20,937.00$12.20$24,326.80$13.50$26,919.00$19.00$37,886.00
2232.504MILL BITUMINOUS SURFACE (2.0")SQ YD97,392$0.82$79,861.44$0.87$84,731.04$0.85$82,783.20$0.80$77,913.60$1.05$102,261.60
2232.603MILLED RUMBLE STRIPS-INTERMITTENTLIN FT19,561$0.35$6,846.35$0.35$6,846.35$0.42$8,215.62$0.50$9,780.50$0.38$7,433.18
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON4,344$2.50$10,860.00$0.01$43.44$2.90$12,597.60$2.00$8,688.00$2.60$11,294.40
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON12,477$51.80$646,308.60$56.80$708,693.60$55.50$692,473.50$55.50$692,473.50$63.00$786,051.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON10,391$51.80$538,253.80$53.80$559,035.80$52.40$544,488.40$52.50$545,527.50$61.00$633,851.00
2540.602MAIL BOX SUPPORTEACH8$140.00$1,120.00$140.00$1,120.00$147.00$1,176.00$140.00$1,120.00$140.00$1,120.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,000.00$3,000.00$1,800.00$1,800.00$2,500.00$2,500.00$3,700.00$3,700.00$3,000.00$3,000.00
2580.503INTERIM PAVEMENT MARKINGLIN FT61,032$0.10$6,103.20$0.12$7,323.84$0.10$6,103.20$0.09$5,492.88$0.20$12,206.40
2582.5036" SOLID LINE MULTI COMPLIN FT58,666$0.27$15,839.82$0.27$15,839.82$0.29$17,013.14$0.27$15,839.82$0.28$16,426.48
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT6,321$0.46$2,907.66$0.46$2,907.66$0.49$3,097.29$0.46$2,907.66$0.48$3,034.08
2582.5034" BROKEN LINE MULTI COMPLIN FT4,740$0.23$1,090.20$0.23$1,090.20$0.25$1,185.00$0.23$1,090.20$0.24$1,137.60
2582.50324" SOLID LINE PREF TAPE GR INLIN FT176$35.00$6,160.00$35.00$6,160.00$40.00$7,040.00$35.00$6,160.00$36.00$6,336.00
2582.5034" SOLID LINE MULTI COMPLIN FT13,134$0.23$3,020.82$0.23$3,020.82$0.25$3,283.50$0.23$3,020.82$0.24$3,152.16
2582.5034" DOTTED LINE MULTI COMPLIN FT400$0.23$92.00$0.23$92.00$0.25$100.00$0.23$92.00$0.24$96.00
 Totals for project CP 0070-276153 (Low) $1,719,796.14 $1,784,042.11 $1,788,740.88 $1,845,827.02 $2,036,266.43
 
CP 0070-276154 (Tied) - CP 0070-276154 (Tied) Base Stabilization and BituminousHawkinson Construction Co., Inc Knife River Materials FKA Northstar Materials, Inc. KGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$1,000.00$1,000.00$2,600.00$2,600.00$4,500.00$4,500.00$500.00$500.00$300.00$300.00
2021.501MOBILIZATIONLUMP SUM1$34,650.00$34,650.00$28,200.00$28,200.00$49,500.00$49,500.00$10,000.00$10,000.00$2,600.00$2,600.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT24$1.75$42.00$1.00$24.00$3.00$72.00$1.95$46.80$2.00$48.00
2118.509AGGREGATE SURFACING CLASS 5TON3,187$13.90$44,299.30$14.00$44,618.00$14.85$47,326.95$15.40$49,079.80$24.50$78,081.50
2123.510MOTOR GRADERHOUR74$180.00$13,320.00$150.00$11,100.00$205.00$15,170.00$255.00$18,870.00$260.00$19,240.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR74$180.00$13,320.00$125.00$9,250.00$230.00$17,020.00$240.00$17,760.00$200.00$14,800.00
2123.5100.5 CU YD SHOVELHOUR21$175.00$3,675.00$180.00$3,780.00$320.00$6,720.00$200.00$4,200.00$315.00$6,615.00
2130.523WATERM GALLON246$42.00$10,332.00$22.00$5,412.00$33.00$8,118.00$40.00$9,840.00$45.00$11,070.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON12,540$1.05$13,167.00$1.20$15,048.00$1.05$13,167.00$0.96$12,038.40$1.05$13,167.00
2211.509AGGREGATE BASE CLASS 5TON6,558$10.90$71,482.20$10.50$68,859.00$10.70$70,170.60$11.10$72,793.80$16.00$104,928.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD64,461$0.60$38,676.60$0.51$32,875.11$0.58$37,387.38$0.42$27,073.62$0.46$29,652.06
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON3,097$2.50$7,742.50$0.01$30.97$2.90$8,981.30$2.00$6,194.00$2.60$8,052.20
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON7,335$51.80$379,953.00$56.80$416,628.00$56.65$415,527.75$58.90$432,031.50$63.00$462,105.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON7,118$51.80$368,712.40$53.80$382,948.40$54.30$386,507.40$54.00$384,372.00$59.00$419,962.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,000.00$3,000.00$1,200.00$1,200.00$5,400.00$5,400.00$3,100.00$3,100.00$3,000.00$3,000.00
2580.503INTERIM PAVEMENT MARKINGLIN FT77,460$0.10$7,746.00$0.12$9,295.20$0.10$7,746.00$0.09$6,971.40$0.20$15,492.00
2582.5034" BROKEN LINE MULTI COMPLIN FT1,090$0.23$250.70$0.23$250.70$0.25$272.50$0.23$250.70$0.24$261.60
2582.5034" SOLID LINE MULTI COMPLIN FT4,740$0.23$1,090.20$0.23$1,090.20$0.25$1,185.00$0.23$1,090.20$0.24$1,137.60
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT16,450$0.46$7,567.00$0.46$7,567.00$0.49$8,060.50$0.46$7,567.00$0.48$7,896.00
2582.50324" SOLID LINE PREF TAPE GR INLIN FT48$35.00$1,680.00$35.00$1,680.00$40.00$1,920.00$35.00$1,680.00$36.00$1,728.00
2582.5036" SOLID LINE MULTI COMPLIN FT43,015$0.27$11,614.05$0.27$11,614.05$0.29$12,474.35$0.27$11,614.05$0.28$12,044.20
 Totals for project CP 0070-276154 (Tied) $1,033,319.95 $1,054,070.63 $1,117,226.73 $1,077,073.27 $1,212,180.16
 
CP 8217-153454 (Tied) - CP 8217-153454 (Tied) - Bituminous Reclamation, P.M. Bit Surface, Agg. ShouldersHawkinson Construction Co., Inc Knife River Materials FKA Northstar Materials, Inc. KGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$1,000.00$1,000.00$1,200.00$1,200.00$4,000.00$4,000.00$500.00$500.00$300.00$300.00
2021.501MOBILIZATIONLUMP SUM1$10,000.00$10,000.00$28,200.00$28,200.00$3,500.00$3,500.00$3,000.00$3,000.00$2,600.00$2,600.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT208$1.75$364.00$1.00$208.00$3.00$624.00$1.95$405.60$2.00$416.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD158$5.30$837.40$5.00$790.00$4.00$632.00$5.00$790.00$9.00$1,422.00
2118.509AGGREGATE SURFACING CLASS 5TON1,375$12.55$17,256.25$12.00$16,500.00$13.35$18,356.25$15.00$20,625.00$24.00$33,000.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR31$180.00$5,580.00$125.00$3,875.00$230.00$7,130.00$240.00$7,440.00$200.00$6,200.00
2123.510MOTOR GRADERHOUR31$180.00$5,580.00$150.00$4,650.00$205.00$6,355.00$255.00$7,905.00$260.00$8,060.00
2123.5100.5 CU YD SHOVELHOUR9$175.00$1,575.00$180.00$1,620.00$320.00$2,880.00$200.00$1,800.00$315.00$2,835.00
2130.523WATERM GALLON102$42.00$4,284.00$22.00$2,244.00$33.00$3,366.00$40.00$4,080.00$45.00$4,590.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON4,781$1.05$5,020.05$1.20$5,737.20$1.05$5,020.05$0.96$4,589.76$1.05$5,020.05
2211.509AGGREGATE BASE CLASS 5TON880$13.00$11,440.00$7.75$6,820.00$13.30$11,704.00$20.00$17,600.00$18.50$16,280.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD24,184$0.70$16,928.80$0.51$12,333.84$0.58$14,026.72$0.42$10,157.28$0.46$11,124.64
2215.504FULL DEPTH RECLAMATIONSQ YD24,184$0.50$12,092.00$0.70$16,928.80$0.52$12,575.68$0.34$8,222.56$0.38$9,189.92
2232.504MILL BITUMINOUS SURFACE (1.5")SQ YD21,912$0.68$14,900.16$0.70$15,338.40$0.95$20,816.40$0.63$13,804.56$0.82$17,967.84
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,296$2.50$3,240.00$0.01$12.96$2.85$3,693.60$2.00$2,592.00$2.60$3,369.60
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON2,902$49.70$144,229.40$53.00$153,806.00$54.10$156,998.20$54.10$156,998.20$57.00$165,414.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON2,020$49.70$100,394.00$56.00$113,120.00$57.55$116,251.00$59.00$119,180.00$61.00$123,220.00
2540.602MAIL BOX SUPPORTEACH24$140.00$3,360.00$140.00$3,360.00$147.00$3,528.00$140.00$3,360.00$140.00$3,360.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,000.00$2,000.00$1,200.00$1,200.00$3,150.00$3,150.00$1,200.00$1,200.00$3,000.00$3,000.00
2580.503INTERIM PAVEMENT MARKINGLIN FT36,444$0.10$3,644.40$0.12$4,373.28$0.10$3,644.40$0.09$3,279.96$0.20$7,288.80
2582.5036" SOLID LINE MULTI COMPLIN FT17,732$0.27$4,787.64$0.27$4,787.64$0.29$5,142.28$0.27$4,787.64$0.28$4,964.96
2582.5034" BROKEN LINE MULTI COMPLIN FT1,034$0.23$237.82$0.23$237.82$0.25$258.50$0.23$237.82$0.24$248.16
2582.5034" SOLID LINE MULTI COMPLIN FT3,538$0.23$813.74$0.23$813.74$0.25$884.50$0.23$813.74$0.24$849.12
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT3,788$0.46$1,742.48$0.46$1,742.48$0.49$1,856.12$0.46$1,742.48$0.48$1,818.24
 Totals for project CP 8217-153454 (Tied) $371,307.14 $399,899.16 $406,392.70 $395,111.60 $432,538.33
 
CP 8207-414685 (Tied) - CP 8207-414685 (Tied) - Bituminous Reclamation, P.M. Bit. Surface, Agg. ShouldersHawkinson Construction Co., Inc Knife River Materials FKA Northstar Materials, Inc. KGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$1,000.00$1,000.00$1,200.00$1,200.00$4,500.00$4,500.00$500.00$500.00$300.00$300.00
2021.501MOBILIZATIONLUMP SUM1$12,500.00$12,500.00$28,200.00$28,200.00$3,500.00$3,500.00$2,000.00$2,000.00$2,600.00$2,600.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT105$1.75$183.75$1.00$105.00$3.00$315.00$1.95$204.75$2.00$210.00
2118.509AGGREGATE SURFACING CLASS 5TON1,019$12.55$12,788.45$12.00$12,228.00$13.40$13,654.60$18.50$18,851.50$25.00$25,475.00
2123.510MOTOR GRADERHOUR40$180.00$7,200.00$150.00$6,000.00$205.00$8,200.00$255.00$10,200.00$260.00$10,400.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR40$180.00$7,200.00$125.00$5,000.00$230.00$9,200.00$240.00$9,600.00$200.00$8,000.00
2123.5100.5 CU YD SHOVELHOUR20$175.00$3,500.00$180.00$3,600.00$320.00$6,400.00$200.00$4,000.00$315.00$6,300.00
2130.523WATERM GALLON136$42.00$5,712.00$22.00$2,992.00$33.00$4,488.00$40.00$5,440.00$45.00$6,120.00
2211.509AGGREGATE BASE CLASS 5TON1,117$13.00$14,521.00$7.75$8,656.75$10.25$11,449.25$15.50$17,313.50$20.00$22,340.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD32,124$0.50$16,062.00$0.51$16,383.24$0.58$18,631.92$0.42$13,492.08$0.46$14,777.04
2215.504FULL DEPTH RECLAMATIONSQ YD32,124$0.70$22,486.80$0.70$22,486.80$0.52$16,704.48$0.34$10,922.16$0.38$12,207.12
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,569$2.50$3,922.50$0.01$15.69$2.90$4,550.10$2.00$3,138.00$2.60$4,079.40
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON3,585$49.70$178,174.50$53.00$190,005.00$54.65$195,920.25$54.50$195,382.50$58.00$207,930.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON2,490$49.70$123,753.00$56.00$139,440.00$58.00$144,420.00$59.70$148,653.00$63.00$156,870.00
2540.602MAIL BOX SUPPORTEACH20$140.00$2,800.00$140.00$2,800.00$147.00$2,940.00$140.00$2,800.00$140.00$2,800.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,000.00$2,000.00$1,000.00$1,000.00$1,900.00$1,900.00$1,000.00$1,000.00$3,000.00$3,000.00
2580.503INTERIM PAVEMENT MARKINGLIN FT40,680$0.10$4,068.00$0.12$4,881.60$0.10$4,068.00$0.09$3,661.20$0.20$8,136.00
2582.5036" SOLID LINE MULTI COMPLIN FT16,940$0.27$4,573.80$0.27$4,573.80$0.29$4,912.60$0.27$4,573.80$0.28$4,743.20
2582.50324" SOLID LINE PREF TAPE GR INLIN FT24$35.00$840.00$35.00$840.00$40.00$960.00$35.00$840.00$36.00$864.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT10,170$0.46$4,678.20$0.46$4,678.20$0.49$4,983.30$0.46$4,678.20$0.48$4,881.60
2582.518PAVT MSSG PREF TAPE GR INSQ FT49.02$48.00$2,352.96$48.00$2,352.96$52.00$2,549.04$48.00$2,352.96$50.00$2,451.00
 Totals for project CP 8207-414685 (Tied) $430,316.96 $457,439.04 $464,246.54 $459,603.65 $504,484.36
 
CP 8228-414686 (Tied) - CP 8228-414686 (Tied)- Bituminous Reclamation, P.M. Bit. Surface, Agg. ShouldersHawkinson Construction Co., Inc Knife River Materials FKA Northstar Materials, Inc. KGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$1,000.00$1,000.00$1,200.00$1,200.00$3,400.00$3,400.00$500.00$500.00$300.00$300.00
2021.501MOBILIZATIONLUMP SUM1$6,700.00$6,700.00$28,200.00$28,200.00$4,500.00$4,500.00$3,000.00$3,000.00$2,600.00$2,600.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT53$1.75$92.75$1.00$53.00$3.00$159.00$1.95$103.35$2.00$106.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD167$4.20$701.40$5.00$835.00$4.00$668.00$8.00$1,336.00$6.00$1,002.00
2105.507COMMON EXCAVATIONCU YD26$107.00$2,782.00$45.00$1,170.00$24.00$624.00$50.00$1,300.00$50.00$1,300.00
2118.509AGGREGATE SURFACING CLASS 5TON265$24.50$6,492.50$14.00$3,710.00$16.00$4,240.00$24.00$6,360.00$24.50$6,492.50
2123.510MOTOR GRADERHOUR6$180.00$1,080.00$150.00$900.00$205.00$1,230.00$255.00$1,530.00$260.00$1,560.00
2123.5100.5 CU YD SHOVELHOUR2$175.00$350.00$180.00$360.00$320.00$640.00$200.00$400.00$315.00$630.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR6$180.00$1,080.00$125.00$750.00$230.00$1,380.00$240.00$1,440.00$200.00$1,200.00
2130.523WATERM GALLON18$42.00$756.00$22.00$396.00$33.00$594.00$40.00$720.00$45.00$810.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON861$1.05$904.05$1.20$1,033.20$1.05$904.05$0.96$826.56$1.05$904.05
2211.509AGGREGATE BASE CLASS 5TON190$18.90$3,591.00$10.50$1,995.00$13.50$2,565.00$24.00$4,560.00$18.50$3,515.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD4,710$0.90$4,239.00$0.95$4,474.50$0.58$2,731.80$0.41$1,931.10$0.46$2,166.60
2215.504FULL DEPTH RECLAMATIONSQ YD4,710$1.20$5,652.00$1.24$5,840.40$0.52$2,449.20$0.33$1,554.30$0.38$1,789.80
2231.509BITUMINOUS PATCHING MIXTURETON273$64.90$17,717.70$56.80$15,506.40$52.10$14,223.30$85.00$23,205.00$100.00$27,300.00
2232.504MILL BITUMINOUS SURFACE (2.0")SQ YD9,278$1.20$11,133.60$1.15$10,669.70$0.55$5,102.90$1.20$11,133.60$1.50$13,917.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,462$2.50$3,655.00$0.01$14.62$2.85$4,166.70$2.00$2,924.00$2.60$3,801.20
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON1,253$57.50$72,047.50$56.80$71,170.40$58.30$73,049.90$69.30$86,832.90$71.00$88,963.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON533$57.50$30,647.50$53.80$28,675.40$55.60$29,634.80$65.40$34,858.20$77.00$41,041.00
2540.602MAIL BOX SUPPORTEACH25$140.00$3,500.00$140.00$3,500.00$147.00$3,675.00$140.00$3,500.00$140.00$3,500.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,500.00$1,500.00$800.00$800.00$1,800.00$1,800.00$800.00$800.00$3,000.00$3,000.00
2575.504RAPID STABILIZATION METHOD 4SQ YD496$2.00$992.00$3.50$1,736.00$3.20$1,587.20$3.50$1,736.00$2.10$1,041.60
2580.503INTERIM PAVEMENT MARKINGLIN FT20,670$0.10$2,067.00$0.12$2,480.40$0.10$2,067.00$0.09$1,860.30$0.20$4,134.00
2582.5036" SOLID LINE MULTI COMPLIN FT6,085$0.27$1,642.95$0.27$1,642.95$0.29$1,764.65$0.27$1,642.95$0.28$1,703.80
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT5,190$0.46$2,387.40$0.46$2,387.40$0.49$2,543.10$0.46$2,387.40$0.48$2,491.20
2582.50324" SOLID LINE PREF TAPE GR INLIN FT48$35.00$1,680.00$35.00$1,680.00$40.00$1,920.00$48.00$2,304.00$36.00$1,728.00
 Totals for project CP 8228-414686 (Tied) $184,391.35 $191,180.37 $167,619.60 $198,745.66 $216,996.75
 
CP 0622-402449 (Tied) - CP 0622-402449 (Tied) - Reclaim & GRIPHawkinson Construction Co., Inc Knife River Materials FKA Northstar Materials, Inc. KGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$5,000.00$5,000.00$28,200.00$28,200.00$3,700.00$3,700.00$1,000.00$1,000.00$2,600.00$2,600.00
2123.510MOTOR GRADERHOUR5$180.00$900.00$150.00$750.00$205.00$1,025.00$255.00$1,275.00$260.00$1,300.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR5$180.00$900.00$125.00$625.00$230.00$1,150.00$240.00$1,200.00$200.00$1,000.00
2130.523WATERM GALLON15$42.00$630.00$22.00$330.00$33.00$495.00$40.00$600.00$45.00$675.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON720$1.05$756.00$1.20$864.00$1.05$756.00$0.96$691.20$1.05$756.00
2211.509AGGREGATE BASE CLASS 5TON998$11.70$11,676.60$10.50$10,479.00$11.25$11,227.50$11.00$10,978.00$15.00$14,970.00
2211.604AGGREGATE BASE STABILIZATION (CHEMICAL)SQ YD3,600$2.10$7,560.00$1.65$5,940.00$2.10$7,560.00$0.89$3,204.00$1.02$3,672.00
2215.504FULL DEPTH RECLAMATIONSQ YD4,090$1.20$4,908.00$0.88$3,599.20$0.52$2,126.80$0.34$1,390.60$0.40$1,636.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,000.00$1,000.00$800.00$800.00$1,575.00$1,575.00$800.00$800.00$3,000.00$3,000.00
 Totals for project CP 0622-402449 (Tied) $33,330.60 $51,587.20 $29,615.30 $21,138.80 $29,609.00
 
Contract Total:$3,772,462.14$3,938,218.51$3,973,841.75$3,997,500.00$4,432,075.03