Bid Abstract

CP 0043-275802 - CP 0043-275802 / SAP 069-643-016 (LOW PRIME) - Bituminous Reclamation, P.M. Bit. Surface, Agg. ShouldersUlland Brothers, Inc. KGM Contractors, Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$3,158.46$3,158.46$3,000.00$3,000.00
2016.601QUALITY MANAGEMENTLUMP SUM1$3,158.46$3,158.46$2,500.00$2,500.00
2016.601QUALITY MANAGEMENTLUMP SUM1$3,158.46$3,158.46$3,000.00$3,000.00
2021.501MOBILIZATIONLUMP SUM1$16,166.47$16,166.47$9,600.00$9,600.00
2021.501MOBILIZATIONLUMP SUM1$16,166.47$16,166.47$11,000.00$11,000.00
2021.501MOBILIZATIONLUMP SUM1$16,166.47$16,166.47$12,000.00$12,000.00
2021.501MOBILIZATIONLUMP SUM1$16,391.73$16,391.73$85,000.00$85,000.00
2021.501MOBILIZATIONLUMP SUM1$16,166.47$16,166.47$9,500.00$9,500.00
2104.502SALVAGE CONCRETE APRONEACH3$390.45$1,171.35$650.00$1,950.00
2104.502REMOVE CONCRETE APRONEACH3$390.45$1,171.35$650.00$1,950.00
2104.503REMOVE PIPE CULVERTSLIN FT146$22.27$3,251.42$15.00$2,190.00
2104.503REMOVE PIPE CULVERTSLIN FT184$18.31$3,369.04$15.00$2,760.00
2104.503REMOVE PIPE CULVERTSLIN FT44$18.30$805.20$15.00$660.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT229$1.55$354.95$2.90$664.10
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT411$1.55$637.05$2.90$1,191.90
2104.503REMOVE PIPE CULVERTSLIN FT8$93.93$751.44$21.00$168.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT645$1.55$999.75$2.90$1,870.50
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT452$1.55$700.60$2.90$1,310.80
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT539$1.55$835.45$2.90$1,563.10
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD3,333$3.86$12,865.38$3.30$10,998.90
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD584$4.07$2,376.88$3.65$2,131.60
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD29,620$2.07$61,313.40$2.70$79,974.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,176$4.94$5,809.44$3.65$4,292.40
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD1,856$4.69$8,704.64$3.65$6,774.40
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$8,863.63$8,863.63$5,000.00$5,000.00
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$8,863.63$8,863.63$5,000.00$5,000.00
2105.602TEMPORARY STREAM DIVERSION SYSTEMEACH1$1,444.27$1,444.27$3,200.00$3,200.00
2118.509AGGREGATE SURFACING CLASS 5TON675$24.58$16,591.50$15.75$10,631.25
2118.509AGGREGATE SURFACING CLASS 5TON170$36.68$6,235.60$15.75$2,677.50
2118.509AGGREGATE SURFACING CLASS 5TON394$37.58$14,806.52$15.75$6,205.50
2118.509AGGREGATE SURFACING CLASS 5TON3,008$20.48$61,603.84$18.90$56,851.20
2118.509AGGREGATE SURFACING CLASS 5TON135$36.68$4,951.80$17.25$2,328.75
2118.609RECYCLED AGGREGATE SURFACINGTON518$23.44$12,141.92$15.75$8,158.50
2118.609RECYCLED AGGREGATE SURFACINGTON734$23.45$17,212.30$16.40$12,037.60
2118.609RECYCLED AGGREGATE SURFACINGTON1,519$19.93$30,273.67$15.75$23,924.25
2123.5104.0 CU YD FRONT END LOADERHOUR22$180.07$3,961.54$175.00$3,850.00
2123.51012 CU YD TRUCKHOUR8$146.41$1,171.28$140.00$1,120.00
2123.51012 CU YD TRUCKHOUR16$146.40$2,342.40$135.00$2,160.00
2123.510MOTOR GRADERHOUR16$357.55$5,720.80$205.00$3,280.00
2123.5104.0 CU YD FRONT END LOADERHOUR8$180.02$1,440.16$175.00$1,400.00
2123.510MOTOR GRADERHOUR16$357.55$5,720.80$205.00$3,280.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR18$243.25$4,378.50$160.00$2,880.00
2123.510MOTOR GRADERHOUR48$357.53$17,161.44$205.00$9,840.00
2123.51012 CU YD TRUCKHOUR22$146.40$3,220.80$140.00$3,080.00
2123.510MOTOR GRADERHOUR33$357.53$11,798.49$205.00$6,765.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR48$243.24$11,675.52$160.00$7,680.00
2123.510MOTOR GRADERHOUR18$357.54$6,435.72$205.00$3,690.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR33$243.24$8,026.92$160.00$5,280.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR16$243.26$3,892.16$160.00$2,560.00
2123.5100.5 CU YD SHOVELHOUR8$163.62$1,308.96$175.00$1,400.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR16$243.26$3,892.16$160.00$2,560.00
2123.5104.0 CU YD FRONT END LOADERHOUR16$180.08$2,881.28$175.00$2,800.00
2123.5100.5 CU YD SHOVELHOUR4$163.62$654.48$175.00$700.00
2123.5100.5 CU YD SHOVELHOUR22$163.67$3,600.74$175.00$3,850.00
2123.5100.5 CU YD SHOVELHOUR16$163.68$2,618.88$175.00$2,800.00
2123.51012 CU YD TRUCKHOUR4$146.41$585.64$140.00$560.00
2123.5104.0 CU YD FRONT END LOADERHOUR4$180.02$720.08$175.00$700.00
2123.5104.0 CU YD FRONT END LOADERHOUR4$180.02$720.08$175.00$700.00
2123.5100.5 CU YD SHOVELHOUR4$163.62$654.48$175.00$700.00
2123.51012 CU YD TRUCKHOUR4$146.41$585.64$135.00$540.00
2130.523WATERM GALLON33$38.60$1,273.80$35.00$1,155.00
2130.523WATERM GALLON100$38.60$3,860.00$35.00$3,500.00
2130.523WATERM GALLON35$38.60$1,351.00$35.00$1,225.00
2130.523WATERM GALLON65$38.60$2,509.00$35.00$2,275.00
2130.523WATERM GALLON30$38.60$1,158.00$35.00$1,050.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON5,282$1.05$5,546.10$1.10$5,810.20
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,741$1.05$1,828.05$1.10$1,915.10
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,742$1.05$1,829.10$1.10$1,916.20
2131.506CALCIUM CHLORIDE SOLUTIONGALLON1,759$1.05$1,846.95$1.10$1,934.90
2131.506CALCIUM CHLORIDE SOLUTIONGALLON3,546$1.05$3,723.30$1.10$3,900.60
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD47$51.83$2,436.01$46.00$2,162.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD62$46.17$2,862.54$45.00$2,790.00
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD15$55.72$835.80$46.00$690.00
2211.509AGGREGATE BASE CLASS 5TON250$12.07$3,017.50$14.00$3,500.00
2211.509AGGREGATE BASE CLASS 5TON275$8.41$2,312.75$16.50$4,537.50
2211.509AGGREGATE BASE CLASS 5TON250$12.07$3,017.50$13.60$3,400.00
2211.509AGGREGATE BASE CLASS 5TON504$11.34$5,715.36$13.60$6,854.40
2211.509AGGREGATE BASE CLASS 5TON750$9.14$6,855.00$10.30$7,725.00
2215.504FULL DEPTH RECLAMATIONSQ YD16,698$0.41$6,846.18$0.55$9,183.90
2215.504FULL DEPTH RECLAMATIONSQ YD45,973$0.41$18,848.93$0.55$25,285.15
2215.504FULL DEPTH RECLAMATIONSQ YD15,024$0.41$6,159.84$0.55$8,263.20
2215.504FULL DEPTH RECLAMATIONSQ YD13,862$0.41$5,683.42$0.55$7,624.10
2215.604BASE STABILIZATION (BASE ONE)SQ YD44,020$0.38$16,727.60$0.54$23,770.80
2215.604BASE STABILIZATION (BASE ONE)SQ YD15,350$0.41$6,293.50$0.55$8,442.50
2215.604BASE STABILIZATION (BASE ONE)SQ YD14,524$0.41$5,954.84$0.55$7,988.20
2215.604BASE STABILIZATION (BASE ONE)SQ YD15,102$0.41$6,191.82$0.55$8,306.10
2232.504MILL BITUMINOUS SURFACE (4.0")SQ YD16,946$2.20$37,281.20$1.85$31,350.10
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,865$2.21$4,121.65$2.80$5,222.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON874$2.21$1,931.54$2.80$2,447.20
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON976$2.21$2,156.96$2.80$2,732.80
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON2,916$2.21$6,444.36$2.80$8,164.80
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON922$2.21$2,037.62$2.80$2,581.60
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON7$155.38$1,087.66$85.00$595.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON5,734$48.85$280,105.90$51.95$297,881.30
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON2,499$53.25$133,071.75$55.00$137,445.00
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON47$158.69$7,458.43$85.00$3,995.00
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON91$169.86$15,457.26$91.00$8,281.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON5,497$51.42$282,655.74$52.65$289,417.05
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON3,429$50.70$173,850.30$54.25$186,023.25
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON1,961$50.94$99,893.34$54.20$106,286.20
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON1,731$53.51$92,625.81$54.25$93,906.75
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON1,355$55.94$75,798.70$55.00$74,525.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON1,418$54.52$77,309.36$55.00$77,990.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON1,857$53.37$99,108.09$54.25$100,742.25
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON125$147.88$18,485.00$85.00$10,625.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;C)TON1,259$56.10$70,629.90$55.00$69,245.00
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,C)TON205$149.50$30,647.50$85.00$17,425.00
2412.5028X6 PRECAST CONCRETE BOX CULV END SECTEACH2$7,415.21$14,830.42$9,200.00$18,400.00
2412.5028X4 PRECAST CONCRETE BOX CULV END SECTEACH2$7,203.53$14,407.06$8,650.00$17,300.00
2412.5038X4 PRECAST CONCRETE BOX CULVERTLIN FT40$670.91$26,836.40$725.00$29,000.00
2412.5038X6 PRECAST CONCRETE BOX CULVERTLIN FT44$736.75$32,417.00$785.00$34,540.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD83$19.38$1,608.54$23.00$1,909.00
2451.507COARSE AGGREGATE BEDDING (CV) (P)CU YD34$55.66$1,892.44$69.00$2,346.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD387$14.25$5,514.75$18.00$6,966.00
2451.507GRANULAR BEDDING (CV) (P)CU YD14$35.89$502.46$98.00$1,372.00
2451.507GRANULAR BEDDING (CV) (P)CU YD32$36.27$1,160.64$41.00$1,312.00
2451.507GRANULAR BEDDING (CV) (P)CU YD18$44.06$793.08$100.00$1,800.00
2451.507COARSE AGGREGATE BEDDING (CV) (P)CU YD28$55.60$1,556.80$70.00$1,960.00
2451.507GRANULAR BEDDING (CV) (P)CU YD53$44.12$2,338.36$37.00$1,961.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD70$19.57$1,369.90$27.00$1,890.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD63$25.53$1,608.39$30.00$1,890.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD725$14.18$10,280.50$18.00$13,050.00
2451.507GRANULAR BEDDING (CV) (P)CU YD34$44.16$1,501.44$41.00$1,394.00
2501.50224" RC PIPE APRONEACH2$789.76$1,579.52$1,000.00$2,000.00
2501.50230" RC PIPE APRONEACH3$1,047.86$3,143.58$1,150.00$3,450.00
2501.50222" SPAN RC PIPE-ARCH APRONEACH2$1,189.55$2,379.10$810.00$1,620.00
2501.502INSTALL CONCRETE APRONEACH3$390.45$1,171.35$800.00$2,400.00
2501.50218" RC PIPE APRONEACH2$975.80$1,951.60$775.00$1,550.00
2501.50322" SPAN RC PIPE-ARCH CULV CL IIALIN FT44$126.95$5,585.80$115.00$5,060.00
2501.50318" RC PIPE CULVERT DES 3006LIN FT32$77.30$2,473.60$85.00$2,720.00
2501.50324" RC PIPE CULVERT DES 3006 CL IIILIN FT56$83.64$4,683.84$90.00$5,040.00
2501.50330" RC PIPE CULVERTLIN FT8$132.03$1,056.24$175.00$1,400.00
2501.602CONCRETE CULVERT COLLAREACH3$897.39$2,692.17$1,200.00$3,600.00
2501.602CONCRETE CULVERT COLLAREACH3$897.39$2,692.17$1,200.00$3,600.00
2511.507RANDOM RIPRAP CLASS IICU YD22$124.69$2,743.18$81.00$1,782.00
2511.507RANDOM RIPRAP CLASS IICU YD30$124.72$3,741.60$81.00$2,430.00
2540.602MAIL BOX SUPPORTEACH20$130.00$2,600.00$136.50$2,730.00
2540.602MAIL BOX SUPPORTEACH12$130.00$1,560.00$136.50$1,638.00
2540.602MAIL BOX SUPPORTEACH51$130.00$6,630.00$136.50$6,961.50
2540.602MAIL BOX SUPPORTEACH37$130.00$4,810.00$136.50$5,050.50
2540.602MAIL BOX SUPPORTEACH14$130.00$1,820.00$140.00$1,960.00
2554.603RAISE GUARDRAILLIN FT379$16.50$6,253.50$17.50$6,632.50
2554.603RAISE GUARDRAILLIN FT408$20.51$8,368.08$16.90$6,895.20
2563.601TRAFFIC CONTROLLUMP SUM1$2,931.68$2,931.68$3,675.00$3,675.00
2563.601TRAFFIC CONTROLLUMP SUM1$6,596.27$6,596.27$6,300.00$6,300.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,518.01$3,518.01$4,095.00$4,095.00
2563.601TRAFFIC CONTROLLUMP SUM1$3,224.84$3,224.84$4,000.00$4,000.00
2563.601TRAFFIC CONTROLLUMP SUM1$7,329.19$7,329.19$7,000.00$7,000.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT87$4.05$352.35$3.15$274.05
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT116$4.50$522.00$3.15$365.40
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT70$4.50$315.00$3.15$220.50
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT192$4.05$777.60$3.15$604.80
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT164$4.05$664.20$3.15$516.60
2575.504RAPID STABILIZATION METHOD 4SQ YD103$2.50$257.50$4.20$432.60
2575.504RAPID STABILIZATION METHOD 4SQ YD119$2.35$279.65$4.20$499.80
2575.504RAPID STABILIZATION METHOD 4SQ YD131$2.35$307.85$4.20$550.20
2575.504RAPID STABILIZATION METHOD 4SQ YD260$2.35$611.00$4.20$1,092.00
2575.504RAPID STABILIZATION METHOD 4SQ YD31$2.50$77.50$4.20$130.20
2577.507GRANULAR CHANNEL LINER (P)CU YD17$191.23$3,250.91$52.90$899.30
2577.507GRANULAR CHANNEL LINER (P)CU YD14$191.19$2,676.66$36.00$504.00
2580.503INTERIM PAVEMENT MARKINGLIN FT20,828$0.12$2,499.36$0.15$3,124.20
2580.503INTERIM PAVEMENT MARKINGLIN FT20,548$0.12$2,465.76$0.15$3,082.20
2580.503INTERIM PAVEMENT MARKINGLIN FT33,754$0.12$4,050.48$0.13$4,388.02
2580.503INTERIM PAVEMENT MARKINGLIN FT31,174$0.12$3,740.88$0.10$3,117.40
2580.503INTERIM PAVEMENT MARKINGLIN FT17,520$0.12$2,102.40$0.15$2,628.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT5,207$0.48$2,499.36$0.50$2,603.50
2582.50324" SOLID LINE MULTI COMPLIN FT16$5.00$80.00$5.25$84.00
2582.5036" SOLID LINE MULTI COMPLIN FT10,062$0.32$3,219.84$0.35$3,521.70
2582.5036" SOLID LINE MULTI COMPLIN FT31,231$0.32$9,993.92$0.35$10,930.85
2582.5034" BROKEN LINE MULTI COMPLIN FT840$0.24$201.60$0.25$210.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT5,701$0.48$2,736.48$0.50$2,850.50
2582.5036" SOLID LINE MULTI COMPLIN FT10,953$0.32$3,504.96$0.35$3,833.55
2582.5036" SOLID LINE MULTI COMPLIN FT20,962$0.32$6,707.84$0.35$7,336.70
2582.5036" SOLID LINE MULTI COMPLIN FT10,297$0.32$3,295.04$0.35$3,603.95
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT3,381$0.48$1,622.88$0.50$1,690.50
2582.5034" SOLID LINE MULTI COMPLIN FT3,425$0.24$822.00$0.30$1,027.50
2582.5034" SOLID LINE MULTI COMPLIN FT1,548$0.24$371.52$0.25$387.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT6,411$0.48$3,077.28$0.50$3,205.50
2582.5034" BROKEN LINE MULTI COMPLIN FT450$0.24$108.00$0.25$112.50
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT5,137$0.48$2,465.76$0.50$2,568.50
2582.5034" BROKEN LINE MULTI COMPLIN FT2,050$0.24$492.00$0.25$512.50
2582.50324" SOLID LINE MULTI COMPLIN FT102$5.00$510.00$5.25$535.50
2582.5034" SOLID LINE MULTI COMPLIN FT1,925$0.24$462.00$0.25$481.25
 Totals for project CP 0043-275802 $2,397,925.00 $2,446,929.87
 
Contract Total:$2,397,925.00$2,446,929.87