CP 0121-275818 - CP 0121-275818, SAP 069-721-005 - Mill & Overlay , Curb & GutterKGM Contractors, Inc Ulland Brothers, Inc. Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$21,000.00$21,000.00$35,476.27$35,476.27$100,000.00$100,000.00
2104.502SALVAGE SIGN TYPE CEACH5$32.00$160.00$30.00$150.00$31.00$155.00
2104.502REMOVE CASTINGEACH31$305.00$9,455.00$125.00$3,875.00$120.00$3,720.00
2104.502REMOVE SIGN TYPE CEACH47$32.00$1,504.00$30.00$1,410.00$31.00$1,457.00
2104.503SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT60$4.00$240.00$3.50$210.00$3.00$180.00
2104.503REMOVE CURB & GUTTERLIN FT10,908$2.25$24,543.00$3.50$38,178.00$4.00$43,632.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT12,766$3.15$40,212.90$2.50$31,915.00$2.00$25,532.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD5,629$3.50$19,701.50$3.50$19,701.50$7.00$39,403.00
2104.504REMOVE CONCRETE PAVEMENTSQ YD767$15.00$11,505.00$13.50$10,354.50$14.00$10,738.00
2106.507EXCAVATION - COMMONCU YD191$18.50$3,533.50$50.00$9,550.00$60.00$11,460.00
2118.509AGGREGATE SURFACING CLASS 5TON485$13.00$6,305.00$33.00$16,005.00$45.00$21,825.00
2123.5100.5 CU YD SHOVELHOUR16$170.00$2,720.00$315.00$5,040.00$180.00$2,880.00
2123.51012 CU YD TRUCKHOUR16$128.00$2,048.00$160.00$2,560.00$140.00$2,240.00
2123.5104.0 CU YD FRONT END LOADERHOUR8$170.00$1,360.00$175.00$1,400.00$160.00$1,280.00
2211.509AGGREGATE BASE CLASS 5TON711$12.00$8,532.00$34.50$24,529.50$45.00$31,995.00
2232.504MILL BITUMINOUS SURFACE (3.0")SQ YD18,591$1.60$29,745.60$2.15$39,970.65$1.55$28,816.05
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON2,839$2.65$7,523.35$2.00$5,678.00$3.00$8,517.00
2360.509TYPE SP 9.5 BIT MIXTURE FOR ENTRANCES (3,B)TON209$74.00$15,466.00$131.00$27,379.00$100.00$20,900.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (3;B)TON4,082$49.10$200,426.20$65.00$265,330.00$70.00$285,740.00
2360.509TYPE SP 12.5 NON WEAR COURSE MIX (3;B)TON892$57.60$51,379.20$85.00$75,820.00$80.00$71,360.00
2504.602ADJUST VALVE BOX (SPECIAL)EACH4$575.00$2,300.00$650.00$2,600.00$800.00$3,200.00
2504.602ADJUST VALVE BOXEACH3$305.00$915.00$250.00$750.00$300.00$900.00
2506.502CASTING ASSEMBLYEACH31$1,000.00$31,000.00$650.00$20,150.00$880.00$27,280.00
2506.602ADJUST FRAME & RING CASTING (SPECIAL)EACH12$1,275.00$15,300.00$1,625.00$19,500.00$1,350.00$16,200.00
2506.602ADJUST FRAME & RING CASTINGEACH3$400.00$1,200.00$400.00$1,200.00$600.00$1,800.00
2506.602RECONSTRUCT MANHOLEEACH2$3,550.00$7,100.00$1,100.00$2,200.00$1,850.00$3,700.00
2506.602REPAIR DRAINAGE STRUCTUREEACH16$2,500.00$40,000.00$450.00$7,200.00$1,600.00$25,600.00
2531.503CONCRETE CURB & GUTTER DESIGN B624LIN FT10,854$16.10$174,749.40$15.50$168,237.00$18.00$195,372.00
2531.503CONCRETE CURB & GUTTER DESIGN B612LIN FT54$32.15$1,736.10$30.00$1,620.00$35.00$1,890.00
2531.5047" CONCRETE DRIVEWAY PAVEMENTSQ YD1,143$56.00$64,008.00$53.00$60,579.00$63.00$72,009.00
2540.602MAIL BOX SUPPORTEACH63$137.00$8,631.00$150.00$9,450.00$135.00$8,505.00
2563.601TRAFFIC CONTROLLUMP SUM1$9,100.00$9,100.00$6,900.00$6,900.00$13,500.00$13,500.00
2564.618SIGN TYPE CSQ FT203$88.00$17,864.00$85.00$17,255.00$86.00$17,458.00
2573.502STORM DRAIN INLET PROTECTIONEACH35$250.00$8,750.00$200.00$7,000.00$150.00$5,250.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT4,735$2.80$13,258.00$2.50$11,837.50$3.00$14,205.00
2574.507BOULEVARD TOPSOIL BORROWCU YD439$36.00$15,804.00$40.00$17,560.00$38.00$16,682.00
2574.508FERTILIZER TYPE 3POUND128$0.77$98.56$0.70$89.60$0.75$96.00
2575.504SODDING TYPE LAWNSQ YD3,182$6.00$19,092.00$5.50$17,501.00$6.00$19,092.00
2575.504RAPID STABILIZATION METHOD 4SQ YD797$2.25$1,793.25$2.00$1,594.00$2.15$1,713.55
2580.503INTERIM PAVEMENT MARKINGLIN FT32,112$0.10$3,211.20$0.25$8,028.00$0.22$7,064.64
2582.5036" SOLID LINE MULTI COMP GR IN (WR) CONTLIN FT9,869$1.10$10,855.90$3.35$33,061.15$1.00$9,869.00
2582.5034" DBLE SOLID LINE MULTI COMP GR IN (WR) CONTLIN FT5,352$1.65$8,830.80$1.50$8,028.00$1.50$8,028.00
2582.50324" SOLID LINE PREF TAPE GR IN (WR)LIN FT68$31.00$2,108.00$28.00$1,904.00$29.00$1,972.00
 Totals for project CP 0121-275818 $915,065.46 $1,038,776.67 $1,183,216.24
 
Contract Total:$915,065.46$1,038,776.67$1,183,216.24