CP 0100-243163 - CP 0100-243163, SP 069-700-015Ulland Brothers, Inc. KGM Contractors, Inc Knife River Materials FKA Northstar Materials, Inc. Northland Constructors of Duluth, Inc. Mesabi Bituminous, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$62,441.18$62,441.18$86,000.00$86,000.00$170,000.00$170,000.00$68,000.00$68,000.00$200,000.00$200,000.00
2104.502REMOVE HYDRANTEACH1$689.74$689.74$1,780.00$1,780.00$500.00$500.00$650.00$650.00$1,350.00$1,350.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT1,008$1.75$1,764.00$2.50$2,520.00$1.75$1,764.00$2.00$2,016.00$4.70$4,737.60
2104.503REMOVE CURB & GUTTERLIN FT260$2.04$530.40$2.00$520.00$5.00$1,300.00$3.00$780.00$8.00$2,080.00
2104.503SAWING CONCRETE PAVEMENT (FULL DEPTH)LIN FT106$4.50$477.00$4.00$424.00$4.50$477.00$5.00$530.00$5.25$556.50
2104.503REMOVE PIPE CULVERTSLIN FT1,166$5.90$6,879.40$10.00$11,660.00$37.00$43,142.00$20.00$23,320.00$5.00$5,830.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD4,929$2.39$11,780.31$1.90$9,365.10$6.00$29,574.00$4.00$19,716.00$4.40$21,687.60
2104.518REMOVE CONCRETE WALKSQ FT320$0.68$217.60$2.05$656.00$2.00$640.00$2.00$640.00$3.00$960.00
2104.518REMOVE CONCRETE PAVEMENTSQ FT50$1.50$75.00$2.50$125.00$2.00$100.00$4.00$200.00$3.00$150.00
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD4,620$2.48$11,457.60$3.25$15,015.00$3.00$13,860.00$3.00$13,860.00$3.30$15,246.00
2106.507EXCAVATION - COMMONCU YD55$14.83$815.65$23.10$1,270.50$65.00$3,575.00$55.00$3,025.00$30.00$1,650.00
2118.509AGGREGATE SURFACING CLASS 5TON5,355$17.14$91,784.70$12.70$68,008.50$14.00$74,970.00$15.00$80,325.00$17.60$94,248.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR88$143.67$12,642.96$160.00$14,080.00$120.00$10,560.00$230.00$20,240.00$180.00$15,840.00
2123.510MOTOR GRADERHOUR114$155.64$17,742.96$195.00$22,230.00$145.00$16,530.00$290.00$33,060.00$200.00$22,800.00
2123.5100.5 CU YD SHOVELHOUR37$150.43$5,565.91$170.00$6,290.00$180.00$6,660.00$320.00$11,840.00$180.00$6,660.00
2130.523WATERM GALLON308$32.27$9,939.16$33.00$10,164.00$18.00$5,544.00$45.00$13,860.00$100.00$30,800.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON19,550$1.30$25,415.00$1.05$20,527.50$1.30$25,415.00$1.04$20,332.00$1.25$24,437.50
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD1,030$9.66$9,949.80$18.00$18,540.00$19.50$20,085.00$35.00$36,050.00$35.00$36,050.00
2211.509AGGREGATE BASE CLASS 5TON6,955$10.42$72,471.10$9.30$64,681.50$9.15$63,638.25$16.00$111,280.00$17.00$118,235.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD97,745$0.36$35,188.20$0.48$46,917.60$0.55$53,759.75$0.40$39,098.00$0.75$73,308.75
2215.504FULL DEPTH RECLAMATIONSQ YD93,247$0.46$42,893.62$0.54$50,353.38$0.55$51,285.85$0.44$41,028.68$0.75$69,935.25
2232.504MILL BITUMINOUS SURFACE (2.0")SQ YD68,564$0.65$44,566.60$0.71$48,680.44$0.90$61,707.60$1.00$68,564.00$1.80$123,415.20
2232.504MILL BITUMINOUS SURFACE (6.0")SQ YD4,498$1.72$7,736.56$2.90$13,044.20$2.50$11,245.00$2.90$13,044.20$3.60$16,192.80
2232.603MILLED RUMBLE STRIPS-INTERMITTENTLIN FT26,500$0.28$7,420.00$0.30$7,950.00$0.40$10,600.00$0.30$7,950.00$0.30$7,950.00
2350.602BITUMINOUS FLUMEEACH2$546.00$1,092.00$255.00$510.00$1,000.00$2,000.00$300.00$600.00$500.00$1,000.00
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON5,187$0.01$51.87$2.55$13,226.85$0.01$51.87$2.60$13,486.20$2.50$12,967.50
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON12,692$47.38$601,346.96$49.90$633,330.80$53.00$672,676.00$51.00$647,292.00$64.00$812,288.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON11,747$49.26$578,657.22$52.95$622,003.65$53.00$622,591.00$52.00$610,844.00$64.00$751,808.00
2451.507GRANULAR BACKFILL (CV) (P)CU YD7,991$5.17$41,313.47$10.50$83,905.50$17.00$135,847.00$20.00$159,820.00$17.50$139,842.50
2451.507GRANULAR BEDDING (CV) (P)CU YD775$21.02$16,290.50$28.00$21,700.00$27.00$20,925.00$42.00$32,550.00$30.00$23,250.00
2451.507STRUCTURE EXCAVATION CLASS E (P)CU YD10,278$4.11$42,242.58$9.50$97,641.00$13.00$133,614.00$17.00$174,726.00$16.50$169,587.00
2501.50265" SPAN RC PIPE-ARCH APRONEACH2$2,920.84$5,841.68$3,750.00$7,500.00$3,000.00$6,000.00$3,850.00$7,700.00$3,100.00$6,200.00
2501.50224" RC PIPE APRONEACH18$933.96$16,811.28$945.00$17,010.00$960.00$17,280.00$1,115.00$20,070.00$1,075.00$19,350.00
2501.50236" RC PIPE APRONEACH4$1,512.82$6,051.28$1,925.00$7,700.00$1,600.00$6,400.00$2,000.00$8,000.00$1,900.00$7,600.00
2501.50230" RC PIPE APRONEACH2$1,095.43$2,190.86$1,100.00$2,200.00$1,140.00$2,280.00$1,330.00$2,660.00$1,400.00$2,800.00
2501.50336" RC PIPE CULVERTLIN FT200$116.10$23,220.00$150.00$30,000.00$135.00$27,000.00$160.00$32,000.00$110.00$22,000.00
2501.50324" RC PIPE CULVERTLIN FT658$74.64$49,113.12$85.00$55,930.00$90.00$59,220.00$92.00$60,536.00$62.00$40,796.00
2501.50365" SPAN RC PIPE-ARCH CULV CL IIALIN FT54$288.17$15,561.18$365.00$19,710.00$325.00$17,550.00$370.00$19,980.00$300.00$16,200.00
2501.50330" RC PIPE CULVERTLIN FT100$101.59$10,159.00$115.00$11,500.00$115.00$11,500.00$140.00$14,000.00$90.00$9,000.00
2504.602ADJUST VALVE BOX-WATEREACH1$658.81$658.81$560.00$560.00$500.00$500.00$1,750.00$1,750.00$250.00$250.00
2504.602INSTALL HYDRANTEACH1$1,799.15$1,799.15$2,520.00$2,520.00$1,000.00$1,000.00$7,100.00$7,100.00$2,750.00$2,750.00
2521.5186" CONCRETE WALKSQ FT984$12.00$11,808.00$7.00$6,888.00$12.00$11,808.00$12.00$11,808.00$10.00$9,840.00
2531.503CONCRETE CURB & GUTTER DESIGN B624LIN FT652$30.00$19,560.00$26.00$16,952.00$30.00$19,560.00$33.00$21,516.00$40.00$26,080.00
2531.618TRUNCATED DOMESSQ FT32$60.00$1,920.00$50.00$1,600.00$60.00$1,920.00$33.00$1,056.00$50.00$1,600.00
2540.602MAIL BOX SUPPORTEACH35$130.00$4,550.00$136.00$4,760.00$130.00$4,550.00$140.00$4,900.00$180.00$6,300.00
2554.603RAISE GUARDRAILLIN FT1,306$12.00$15,672.00$14.00$18,284.00$12.00$15,672.00$12.50$16,325.00$13.00$16,978.00
2563.601TRAFFIC CONTROLLUMP SUM1$5,900.00$5,900.00$7,500.00$7,500.00$2,000.00$2,000.00$13,500.00$13,500.00$42,000.00$42,000.00
2573.501EROSION CONTROL SUPERVISORLUMP SUM1$5,954.69$5,954.69$750.00$750.00$3,000.00$3,000.00$1,200.00$1,200.00$5,000.00$5,000.00
2573.502CULVERT END CONTROLSEACH13$150.00$1,950.00$155.00$2,015.00$170.00$2,210.00$160.00$2,080.00$125.00$1,625.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWLIN FT2,290$4.25$9,732.50$4.50$10,305.00$3.05$6,984.50$4.50$10,305.00$4.00$9,160.00
2574.507COMMON TOPSOIL BORROWCU YD9$35.76$321.84$40.00$360.00$200.00$1,800.00$38.00$342.00$90.00$810.00
2575.504RAPID STABILIZATION METHOD 4SQ YD5,288$1.45$7,667.60$1.55$8,196.40$1.80$9,518.40$1.50$7,932.00$2.00$10,576.00
2575.504SODDING TYPE SALT TOLERANTSQ YD116$14.00$1,624.00$14.70$1,705.20$14.75$1,711.00$15.00$1,740.00$12.00$1,392.00
2580.503INTERIM PAVEMENT MARKINGLIN FT107,706$0.10$10,770.60$0.09$9,693.54$0.12$12,924.72$0.22$23,695.32$0.15$16,155.90
2582.5034" BROKEN LINE MULTI COMPLIN FT3,820$0.27$1,031.40$0.30$1,146.00$0.27$1,031.40$0.28$1,069.60$0.30$1,146.00
2582.50324" SOLID LINE PREF TAPE GR INLIN FT126$34.00$4,284.00$35.70$4,498.20$34.00$4,284.00$35.00$4,410.00$35.00$4,410.00
2582.50312" SOLID LINE PREF TAPE GR INLIN FT130$20.00$2,600.00$21.00$2,730.00$20.00$2,600.00$21.00$2,730.00$21.00$2,730.00
2582.5036" SOLID LINE MULTI COMPLIN FT35,739$0.38$13,580.82$0.40$14,295.60$0.38$13,580.82$0.40$14,295.60$0.40$14,295.60
2582.5034" SOLID LINE MULTI COMPLIN FT16,404$0.27$4,429.08$0.30$4,921.20$0.27$4,429.08$0.28$4,593.12$0.30$4,921.20
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT7,839$0.54$4,233.06$0.60$4,703.40$0.54$4,233.06$0.56$4,389.84$0.60$4,703.40
2582.518PAVT MSSG PREF TAPE GR INSQ FT90$48.50$4,365.00$51.00$4,590.00$48.50$4,365.00$50.00$4,500.00$50.00$4,500.00
 Totals for project CP 0100-243163 $2,024,800.00 $2,273,644.06 $2,541,549.30 $2,594,910.56 $3,116,032.30
 
Contract Total:$2,024,800.00$2,273,644.06$2,541,549.30$2,594,910.56$3,116,032.30