Contract Bid Abstract

CP 0343-275035 (Tied) - CP 0343-275035 (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Knife River Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$524.08$524.08$1,500.00$1,500.00$1,500.00$1,500.00
2021.501MOBILIZATIONLUMP SUM1$14,069.39$14,069.39$2,400.00$2,400.00$30,000.00$30,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT311$1.75$544.25$2.80$870.80$5.00$1,555.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD347$5.68$1,970.96$2.10$728.70$12.00$4,164.00
2118.509AGGREGATE SURFACING CLASS 5TON1,797$27.93$50,190.21$13.90$24,978.30$14.00$25,158.00
2123.510MOTOR GRADERHOUR66$156.58$10,334.28$197.00$13,002.00$145.00$9,570.00
2123.5100.5 CU YD SHOVELHOUR18$151.28$2,723.04$170.00$3,060.00$181.00$3,258.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR66$144.43$9,532.38$155.00$10,230.00$120.00$7,920.00
2130.523WATERM GALLON221$34.07$7,529.47$33.00$7,293.00$18.00$3,978.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON12,102$1.00$12,102.00$1.05$12,707.10$1.30$15,732.60
2211.509AGGREGATE BASE CLASS 5TON1,919$11.81$22,663.39$9.30$17,846.70$9.00$17,271.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD60,508$0.35$21,177.80$0.46$27,833.68$0.59$35,699.72
2215.504FULL DEPTH RECLAMATIONSQ YD60,684$0.41$24,880.44$0.54$32,769.36$0.51$30,948.84
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON2,852$0.01$28.52$2.50$7,130.00$0.01$28.52
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON6,742$48.79$328,942.18$51.50$347,213.00$50.35$339,459.70
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON4,610$50.76$234,003.60$55.00$253,550.00$56.75$261,617.50
2540.602MAIL BOX SUPPORTEACH9$135.00$1,215.00$145.00$1,305.00$135.00$1,215.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,000.00$2,000.00$1,300.00$1,300.00$2,800.00$2,800.00
2580.503INTERIM PAVEMENT MARKINGLIN FT14,400$0.12$1,728.00$0.09$1,296.00$0.35$5,040.00
2582.5034" SOLID LINE MULTI COMPLIN FT3,300$0.25$825.00$0.26$858.00$0.25$825.00
2582.50324" SOLID LINE PREF TAPE GR INLIN FT48$39.00$1,872.00$40.95$1,965.60$39.00$1,872.00
2582.5036" SOLID LINE MULTI COMPLIN FT38,898$0.34$13,225.32$0.36$14,003.28$0.34$13,225.32
2582.5034" BROKEN LINE MULTI COMPLIN FT3,900$0.25$975.00$0.26$1,014.00$0.25$975.00
 Totals for project CP 0343-275035 (Tied) $763,056.31 $784,854.52 $813,813.20
 
CP 0111-275034 (Tied) - CP 0111-275034, SAP 069-711-001 (Tied) CSAH 4 to CSAH 99Ulland Brothers, Inc. KGM Contractors, Inc Knife River Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$524.08$524.08$1,500.00$1,500.00$1,500.00$1,500.00
2021.501MOBILIZATIONLUMP SUM1$14,069.39$14,069.39$2,400.00$2,400.00$25,000.00$25,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT108$1.75$189.00$2.80$302.40$5.00$540.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD909$5.65$5,135.85$2.10$1,908.90$12.00$10,908.00
2118.509AGGREGATE SURFACING CLASS 5TON1,045$25.71$26,866.95$13.50$14,107.50$15.00$15,675.00
2123.5100.5 CU YD SHOVELHOUR18$151.28$2,723.04$170.00$3,060.00$181.00$3,258.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR66$144.43$9,532.38$155.00$10,230.00$120.00$7,920.00
2123.510MOTOR GRADERHOUR66$156.58$10,334.28$197.00$13,002.00$145.00$9,570.00
2130.523WATERM GALLON219$34.07$7,461.33$33.00$7,227.00$18.00$3,942.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON11,058$1.00$11,058.00$1.05$11,610.90$1.30$14,375.40
2211.509AGGREGATE BASE CLASS 5TON1,791$11.82$21,169.62$10.40$18,626.40$9.50$17,014.50
2211.604AGGREGATE BASE STABILIZATIONSQ YD55,290$0.35$19,351.50$0.46$25,433.40$0.59$32,621.10
2215.504FULL DEPTH RECLAMATIONSQ YD59,544$0.41$24,413.04$0.54$32,153.76$0.51$30,367.44
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON2,807$0.01$28.07$2.50$7,017.50$0.01$28.07
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON6,704$48.91$327,892.64$51.00$341,904.00$50.50$338,552.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON4,656$50.94$237,176.64$54.85$255,381.60$56.75$264,228.00
2540.602MAIL BOX SUPPORTEACH9$135.00$1,215.00$145.00$1,305.00$135.00$1,215.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,000.00$2,000.00$2,520.00$2,520.00$1,200.00$1,200.00
2580.503INTERIM PAVEMENT MARKINGLIN FT15,046$0.12$1,805.52$0.09$1,354.14$0.35$5,266.10
2582.5034" SOLID LINE MULTI COMPLIN FT3,691$0.25$922.75$0.26$959.66$0.25$922.75
2582.5034" BROKEN LINE MULTI COMPLIN FT3,832$0.25$958.00$0.26$996.32$0.25$958.00
2582.50324" SOLID LINE PREF TAPE GR INLIN FT48$39.00$1,872.00$40.95$1,965.60$39.00$1,872.00
2582.5036" SOLID LINE MULTI COMPLIN FT38,278$0.34$13,014.52$0.36$13,780.08$0.34$13,014.52
2582.518PAVT MSSG PREF TAPE GR INSQ FT147.06$23.00$3,382.38$61.95$9,110.37$59.00$8,676.54
 Totals for project CP 0111-275034 (Tied) $743,095.98 $777,856.53 $808,624.42
 
CP 0341-319129 (Tied) - CP 0341-319129 (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Knife River Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$524.08$524.08$1,200.00$1,200.00$800.00$800.00
2021.501MOBILIZATIONLUMP SUM1$14,069.39$14,069.39$2,400.00$2,400.00$26,000.00$26,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT24$1.75$42.00$2.70$64.80$5.00$120.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD348$8.37$2,912.76$2.10$730.80$12.00$4,176.00
2118.509AGGREGATE SURFACING CLASS 5TON945$25.71$24,295.95$11.95$11,292.75$16.00$15,120.00
2123.510MOTOR GRADERHOUR34$156.59$5,324.06$197.00$6,698.00$145.00$4,930.00
2123.5100.5 CU YD SHOVELHOUR9$151.28$1,361.52$170.00$1,530.00$181.00$1,629.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR34$144.45$4,911.30$155.00$5,270.00$120.00$4,080.00
2130.523WATERM GALLON114$34.07$3,883.98$33.00$3,762.00$18.00$2,052.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON5,347$1.00$5,347.00$1.05$5,614.35$1.30$6,951.10
2211.509AGGREGATE BASE CLASS 5TON2,140$9.07$19,409.80$9.10$19,474.00$11.00$23,540.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD31,189$0.35$10,916.15$0.46$14,346.94$0.59$18,401.51
2215.504FULL DEPTH RECLAMATIONSQ YD31,189$0.41$12,787.49$0.54$16,842.06$0.51$15,906.39
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,471$0.01$14.71$2.50$3,677.50$0.01$14.71
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON2,430$49.22$119,604.60$52.00$126,360.00$58.10$141,183.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON3,599$47.30$170,232.70$49.00$176,351.00$51.90$186,788.10
2540.602MAIL BOX SUPPORTEACH26$135.00$3,510.00$145.00$3,770.00$135.00$3,510.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,400.00$2,400.00$1,300.00$1,300.00$2,000.00$2,000.00
2580.503INTERIM PAVEMENT MARKINGLIN FT34,500$0.12$4,140.00$0.09$3,105.00$0.35$12,075.00
2582.5036" SOLID LINE MULTI COMPLIN FT20,050$0.34$6,817.00$0.36$7,218.00$0.34$6,817.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT7,025$0.50$3,512.50$0.53$3,723.25$0.50$3,512.50
2582.5034" BROKEN LINE MULTI COMPLIN FT600$0.25$150.00$0.26$156.00$0.25$150.00
2582.5034" SOLID LINE MULTI COMPLIN FT2,600$0.25$650.00$0.26$676.00$0.25$650.00
 Totals for project CP 0341-319129 (Tied) $416,816.99 $415,562.45 $480,406.31
 
CP 6528-319130 (Tied) - CP 6528-319130 (Tied) - Reclaim & OverlayUlland Brothers, Inc. KGM Contractors, Inc Knife River Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENTLUMP SUM1$524.08$524.08$1,200.00$1,200.00$800.00$800.00
2021.501MOBILIZATIONLUMP SUM1$14,069.39$14,069.39$8,900.00$8,900.00$29,000.00$29,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT48$1.75$84.00$2.80$134.40$5.00$240.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD466$6.51$3,033.66$2.10$978.60$12.00$5,592.00
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD1,708$1.78$3,040.24$2.75$4,697.00$3.00$5,124.00
2106.507EXCAVATION - COMMONCU YD1,689$6.61$11,164.29$8.00$13,512.00$20.00$33,780.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV)CU YD1,267$12.59$15,951.53$8.75$11,086.25$20.00$25,340.00
2118.509AGGREGATE SURFACING CLASS 5TON889$25.71$22,856.19$12.10$10,756.90$15.00$13,335.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR33$144.43$4,766.19$155.00$5,115.00$120.00$3,960.00
2123.510MOTOR GRADERHOUR33$156.58$5,167.14$197.00$6,501.00$145.00$4,785.00
2123.5100.5 CU YD SHOVELHOUR9$151.28$1,361.52$170.00$1,530.00$181.00$1,629.00
2130.523WATERM GALLON109$34.07$3,713.63$33.00$3,597.00$18.00$1,962.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON5,120$1.00$5,120.00$1.05$5,376.00$1.30$6,656.00
2211.509AGGREGATE BASE CLASS 5TON1,660$8.16$13,545.60$9.00$14,940.00$10.50$17,430.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD29,867$0.35$10,453.45$0.46$13,738.82$0.59$17,621.53
2215.504FULL DEPTH RECLAMATIONSQ YD29,867$0.41$12,245.47$0.54$16,128.18$0.51$15,232.17
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,408$0.01$14.08$2.50$3,520.00$0.01$14.08
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON2,283$48.22$110,086.26$52.80$120,542.40$59.20$135,153.60
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON3,388$46.28$156,796.64$49.90$169,061.20$51.80$175,498.40
2540.602MAIL BOX SUPPORTEACH16$135.00$2,160.00$145.00$2,320.00$135.00$2,160.00
2554.502END TREATMENT-ENERGY ABSORBING TERMINALEACH2$2,500.00$5,000.00$2,625.00$5,250.00$2,500.00$5,000.00
2554.503TRAFFIC BARRIER DESIGN B8307LIN FT200$19.25$3,850.00$20.20$4,040.00$19.25$3,850.00
2554.603RAISE GUARDRAILLIN FT660$10.25$6,765.00$10.75$7,095.00$10.25$6,765.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,200.00$1,200.00$2,100.00$2,100.00$2,000.00$2,000.00
2575.504RAPID STABILIZATION METHOD 4SQ YD1,389$2.50$3,472.50$2.70$3,750.30$2.50$3,472.50
2580.503INTERIM PAVEMENT MARKINGLIN FT38,400$0.12$4,608.00$0.09$3,456.00$0.35$13,440.00
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT9,600$0.50$4,800.00$0.53$5,088.00$0.50$4,800.00
2582.50324" SOLID LINE PREF TAPE GR INLIN FT12$39.00$468.00$40.95$491.40$39.00$468.00
2582.5036" SOLID LINE MULTI COMPLIN FT19,200$0.34$6,528.00$0.36$6,912.00$0.34$6,528.00
 Totals for project CP 6528-319130 (Tied) $432,844.86 $451,817.45 $541,636.28
 
CP 0341-387258 (Tied) - CP 0341-387258 (Tied) - Agg. Stabilization & OverlayUlland Brothers, Inc. KGM Contractors, Inc Knife River Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$14,069.39$14,069.39$2,400.00$2,400.00$25,000.00$25,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT24$1.75$42.00$2.80$67.20$5.00$120.00
2118.509AGGREGATE SURFACING CLASS 5TON45$32.92$1,481.40$14.30$643.50$52.00$2,340.00
2123.510MOTOR GRADERHOUR4$156.53$626.12$197.00$788.00$145.00$580.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR4$144.39$577.56$155.00$620.00$120.00$480.00
2130.523WATERM GALLON11$34.12$375.32$33.00$363.00$18.00$198.00
2211.509AGGREGATE BASE CLASS 5TON182$14.13$2,571.66$9.30$1,692.60$15.00$2,730.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD2,802$0.35$980.70$1.04$2,914.08$1.28$3,586.56
2215.504FULL DEPTH RECLAMATIONSQ YD624$0.41$255.84$1.07$667.68$1.65$1,029.60
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON142$0.01$1.42$2.50$355.00$0.01$1.42
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON294$72.14$21,209.16$53.00$15,582.00$72.50$21,315.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON419$70.19$29,409.61$49.90$20,908.10$66.50$27,863.50
2540.602MAIL BOX SUPPORTEACH1$135.00$135.00$145.00$145.00$135.00$135.00
2563.601TRAFFIC CONTROLLUMP SUM1$1,200.00$1,200.00$2,100.00$2,100.00$1,200.00$1,200.00
 Totals for project CP 0341-387258 (Tied) $72,935.18 $49,246.16 $86,579.08
 
CP 0099-275033 (Low) - CP 0099-275033, SAP 069-699-003 (Low) CSAH 16 to CSAH 100Ulland Brothers, Inc. KGM Contractors, Inc Knife River Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2016.601QUALITY MANAGEMENT SPECIALLUMP SUM1$2,620.36$2,620.36$6,200.00$6,200.00$2,500.00$2,500.00
2016.601QUALITY MANAGEMENTLUMP SUM1$524.08$524.08$1,200.00$1,200.00$2,500.00$2,500.00
2021.501MOBILIZATIONLUMP SUM1$13,590.00$13,590.00$58,000.00$58,000.00$41,000.00$41,000.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT269$1.75$470.75$2.80$753.20$5.00$1,345.00
2104.504REMOVE BITUMINOUS PAVEMENTSQ YD2,190$4.37$9,570.30$2.10$4,599.00$6.00$13,140.00
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD935$1.94$1,813.90$2.75$2,571.25$3.00$2,805.00
2105.603OBLITERATE OLD ROADWAYLIN FT1,110$2.93$3,252.30$4.80$5,328.00$5.00$5,550.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV)CU YD365$13.38$4,883.70$15.00$5,475.00$18.00$6,570.00
2106.507EXCAVATION - COMMONCU YD1,970$6.50$12,805.00$10.00$19,700.00$13.65$26,890.50
2118.507AGGREGATE SURFACING (CV) CLASS 5CU YD320$16.50$5,280.00$20.00$6,400.00$22.50$7,200.00
2118.509AGGREGATE SURFACING CLASS 5TON590$25.00$14,750.00$12.90$7,611.00$25.00$14,750.00
2123.5108 TON STEEL-WHEELED ROLLERHOUR110$144.43$15,887.30$155.00$17,050.00$120.00$13,200.00
2123.5100.5 CU YD SHOVELHOUR30$151.26$4,537.80$171.00$5,130.00$181.00$5,430.00
2123.510MOTOR GRADERHOUR110$156.58$17,223.80$197.00$21,670.00$145.00$15,950.00
2130.523WATERM GALLON365$34.07$12,435.55$33.00$12,045.00$18.00$6,570.00
2131.506CALCIUM CHLORIDE SOLUTIONGALLON17,125$1.00$17,125.00$1.05$17,981.25$1.30$22,262.50
2211.509AGGREGATE BASE CLASS 5TON3,159$9.50$30,010.50$9.45$29,852.55$9.00$28,431.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD85,627$0.35$29,969.45$0.46$39,388.42$0.59$50,519.93
2215.504FULL DEPTH RECLAMATIONSQ YD85,627$0.41$35,107.07$0.54$46,238.58$0.51$43,669.77
2232.504MILL BITUMINOUS SURFACE (2.0")SQ YD76,634$0.29$22,223.86$0.95$72,802.30$1.05$80,465.70
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON4,895$0.01$48.95$2.50$12,237.50$0.01$48.95
2360.509TYPE SP 12.5 WEARING COURSE MIX (2;C)TON10,843$50.45$547,029.35$51.00$552,993.00$50.15$543,776.45
2360.509TYPE SP 9.5 WEARING COURSE MIX (2;C)TON10,350$52.51$543,478.50$55.80$577,530.00$55.35$572,872.50
2501.503INSTALL METAL CULVERTLIN FT100$18.25$1,825.00$25.00$2,500.00$62.00$6,200.00
2540.602MAIL BOX SUPPORTEACH37$135.00$4,995.00$141.75$5,244.75$135.00$4,995.00
2563.601TRAFFIC CONTROLLUMP SUM1$7,300.00$7,300.00$5,460.00$5,460.00$1,200.00$1,200.00
2573.503SILT FENCE; TYPE HILIN FT125$4.00$500.00$4.60$575.00$4.00$500.00
2575.504RAPID STABILIZATION METHOD 4SQ YD1,250$2.50$3,125.00$2.70$3,375.00$2.50$3,125.00
2575.523RAPID STABILIZATION METHOD 3M GALLON6$350.00$2,100.00$1,010.00$6,060.00$350.00$2,100.00
2580.503INTERIM PAVEMENT MARKINGLIN FT52,578$0.12$6,309.36$0.09$4,732.02$0.35$18,402.30
2582.5034" BROKEN LINE MULTI COMPLIN FT5,986$0.25$1,496.50$0.26$1,556.36$0.25$1,496.50
2582.5034" SOLID LINE MULTI COMPLIN FT6,998$0.25$1,749.50$0.26$1,819.48$0.25$1,749.50
2582.5036" SOLID LINE MULTI COMPLIN FT62,993$0.34$21,417.62$0.36$22,677.48$0.34$21,417.62
2582.5034" DBLE SOLID LINE MULTI COMPLIN FT2,271$0.50$1,135.50$0.53$1,203.63$0.50$1,135.50
 Totals for project CP 0099-275033 (Low) $1,396,591.00 $1,577,959.77 $1,569,768.72
 
Contract Total:$3,825,340.32$4,057,296.88$4,300,828.01