Bid Abstract

CP 0052-300223 - SAP 069-652-020 - Bridge Construction - Br 211 & Br 212KGM Contractors, Inc Northland Constructors of Duluth, Inc. Ulland Brothers, Inc. Veit & Company, Inc. (Duluth) Hoover Construction Company 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.63$157,000.00$98,910.00$133,500.00$84,105.00$77,746.40$48,980.23$285,949.85$180,148.41$145,000.00$91,350.00
2021.501MOBILIZATIONLUMP SUM0.07$157,000.00$10,990.00$133,500.00$9,345.00$77,746.40$5,442.25$285,949.85$20,016.49$145,000.00$10,150.00
2021.501MOBILIZATIONLUMP SUM0.3$157,000.00$47,100.00$133,500.00$40,050.00$77,746.40$23,323.92$285,949.85$85,784.96$145,000.00$43,500.00
2031.502FIELD OFFICE TYPE DEACH1$10,000.00$10,000.00$6,500.00$6,500.00$5,000.00$5,000.00$35,000.00$35,000.00$8,500.00$8,500.00
2101.501CLEARING & GRUBBINGLUMP SUM1$26,500.00$26,500.00$28,500.00$28,500.00$64,000.00$64,000.00$25,000.00$25,000.00$34,000.00$34,000.00
2104.502SALVAGE SIGNEACH54$26.25$1,417.50$26.00$1,404.00$25.00$1,350.00$25.00$1,350.00$30.00$1,620.00
2104.503SALVAGE GUARDRAIL-PLATE BEAMLIN FT1,132$5.35$6,056.20$6.00$6,792.00$5.10$5,773.20$7.20$8,150.40$5.40$6,112.80
2104.503SAWING BIT PAVEMENT (FULL DEPTH)LIN FT24$3.00$72.00$6.00$144.00$5.20$124.80$4.00$96.00$10.00$240.00
2105.504GEOTEXTILE FABRIC TYPE 6SQ YD879$3.75$3,296.25$2.30$2,021.70$4.50$3,955.50$2.10$1,845.90$2.70$2,373.30
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$6,000.00$6,000.00$2,200.00$2,200.00$22,000.00$22,000.00$17,000.00$17,000.00$17,500.00$17,500.00
2105.601DEWATERINGLUMP SUM1$4,000.00$4,000.00$1,100.00$1,100.00$9,000.00$9,000.00$9,000.00$9,000.00$2,700.00$2,700.00
2106.507EXCAVATION - COMMON (P)CU YD67,904$5.95$404,028.80$6.50$441,376.00$6.60$448,166.40$5.30$359,891.20$6.75$458,352.00
2106.507SELECT GRANULAR EMBANKMENT (CV) (P)CU YD830$12.10$10,043.00$29.00$24,070.00$35.00$29,050.00$13.00$10,790.00$31.50$26,145.00
2106.507GRANULAR EMBANKMENT (CV) (P)CU YD14,509$14.00$203,126.00$7.00$101,563.00$12.30$178,460.70$10.00$145,090.00$18.00$261,162.00
2106.507SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD19,490$12.10$235,829.00$22.00$428,780.00$22.00$428,780.00$15.00$292,350.00$18.65$363,488.50
2118.507AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD697$41.00$28,577.00$32.00$22,304.00$42.00$29,274.00$23.50$16,379.50$37.70$26,276.90
2211.507AGGREGATE BASE (CV) CLASS 5 (P)CU YD5,163$17.20$88,803.60$27.00$139,401.00$31.00$160,053.00$29.50$152,308.50$20.80$107,390.40
2357.506BITUMINOUS MATERIAL FOR TACK COATGALLON1,540$2.65$4,081.00$2.60$4,004.00$2.20$3,388.00$2.80$4,312.00$2.63$4,050.20
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON800$2.70$2,160.00$3.20$2,560.00$2.80$2,240.00$2.80$2,240.00$2.63$2,104.00
2360.509TYPE SP 12.5 NON WEAR COURSE MIX (3;C)TON2,462$65.00$160,030.00$89.00$219,118.00$83.00$204,346.00$76.70$188,835.40$73.00$179,726.00
2360.509TYPE SP 12.5 WEARING COURSE MIX (3;C)TON2,986$64.50$192,597.00$89.00$265,754.00$86.00$256,796.00$76.70$229,026.20$73.00$217,978.00
2401.503TYPE P-2 (TL-4) BARRIER CONCRETE (3S52) (P)LIN FT269$110.00$29,590.00$120.00$32,280.00$105.00$28,245.00$116.75$31,405.75$110.25$29,657.25
2401.507STRUCTURAL CONCRETE (3B52) (P)CU YD78$682.00$53,196.00$1,100.00$85,800.00$660.00$51,480.00$723.15$56,405.70$682.50$53,235.00
2401.508REINFORCEMENT BARS (EPOXY COATED) (P)POUND36,240$1.58$57,259.20$1.35$48,924.00$1.50$54,360.00$1.65$59,796.00$1.60$57,984.00
2401.508REINFORCEMENT BARS (STAINLESS-60KSI) (P)POUND420$4.20$1,764.00$4.10$1,722.00$4.00$1,680.00$4.40$1,848.00$4.20$1,764.00
2401.518BRIDGE SLAB CONCRETE (3Y42-M) (P)SQ FT3,912$26.25$102,690.00$28.00$109,536.00$25.00$97,800.00$27.80$108,753.60$26.25$102,690.00
2401.601SLOPE PREPARATIONLUMP SUM1$2,100.00$2,100.00$3,500.00$3,500.00$2,000.00$2,000.00$2,500.00$2,500.00$2,100.00$2,100.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$8,400.00$8,400.00$18,500.00$18,500.00$12,500.00$12,500.00$20,000.00$20,000.00$13,300.00$13,300.00
2402.502ELASTOMERIC BEARING PAD TYPE 1EACH10$89.25$892.50$125.00$1,250.00$85.00$850.00$94.50$945.00$90.00$900.00
2402.503STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT257$132.00$33,924.00$125.00$32,125.00$125.00$32,125.00$139.00$35,723.00$131.25$33,731.25
2405.503PRESTRESSED CONCRETE BEAMS MN45 (P)LIN FT546$305.00$166,530.00$300.00$163,800.00$290.00$158,340.00$322.60$176,139.60$304.50$166,257.00
2405.503DIAPHRAGMS FOR TYPE MN45 PREST BEAMS (P)LIN FT62$76.00$4,712.00$80.00$4,960.00$72.00$4,464.00$80.05$4,963.10$75.60$4,687.20
2406.504BRIDGE APPROACH PANELS (P)SQ YD154$237.00$36,498.00$230.00$35,420.00$225.00$34,650.00$259.00$39,886.00$246.00$37,884.00
2412.50214X10 PRECAST CONCRETE BOX CULV END SECTEACH2$22,100.00$44,200.00$22,500.00$45,000.00$35,400.00$70,800.00$26,000.00$52,000.00$28,500.00$57,000.00
2412.50314X10 PRECAST CONCRETE BOX CULVERTLIN FT60$1,255.00$75,300.00$1,300.00$78,000.00$790.00$47,400.00$1,550.00$93,000.00$1,360.00$81,600.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$41,000.00$41,000.00$44,800.00$44,800.00$39,400.00$39,400.00$45,000.00$45,000.00$45,350.00$45,350.00
2451.507COARSE AGGREGATE BEDDING (CV) (P)CU YD160$40.00$6,400.00$45.00$7,200.00$47.00$7,520.00$50.00$8,000.00$58.00$9,280.00
2452.502PILE TIP PROTECTION 12"EACH12$132.00$1,584.00$120.00$1,440.00$125.00$1,500.00$139.00$1,668.00$131.00$1,572.00
2452.502STEEL H-TEST PILE 70 FT LONG 12"EACH2$10,500.00$21,000.00$8,000.00$16,000.00$10,000.00$20,000.00$11,000.00$22,000.00$10,500.00$21,000.00
2452.603STEEL H-PILING 12"LIN FT600$31.50$18,900.00$45.00$27,000.00$30.00$18,000.00$33.35$20,010.00$31.50$18,900.00
2501.50224" CAS PIPE APRONEACH2$504.00$1,008.00$460.00$920.00$660.00$1,320.00$575.00$1,150.00$400.00$800.00
2501.50324" CAS PIPE CULVERTLIN FT38$63.00$2,394.00$41.00$1,558.00$52.00$1,976.00$38.00$1,444.00$69.00$2,622.00
2501.507CULVERT EXCAVATION CLASS U (P)CU YD1,095$10.75$11,771.25$20.00$21,900.00$12.00$13,140.00$21.00$22,995.00$7.55$8,267.25
2502.501DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,575.00$1,575.00$1,500.00$1,500.00$1,500.00$1,500.00$1,600.00$1,600.00$1,575.00$1,575.00
2502.5026" PRECAST CONCRETE HEADWALLEACH1$725.00$725.00$300.00$300.00$600.00$600.00$390.00$390.00$450.00$450.00
2502.5036" PERF TP PIPE DRAINLIN FT300$13.00$3,900.00$16.00$4,800.00$14.00$4,200.00$15.00$4,500.00$13.00$3,900.00
2511.507RANDOM RIPRAP CLASS IIICU YD60$65.00$3,900.00$46.00$2,760.00$65.00$3,900.00$75.00$4,500.00$67.00$4,020.00
2511.507RANDOM RIPRAP CLASS IIICU YD420$65.00$27,300.00$46.00$19,320.00$65.00$27,300.00$75.00$31,500.00$67.00$28,140.00
2511.515GEOTEXTILE FILTER TYPE VIISQ YD710$4.00$2,840.00$4.00$2,840.00$2.00$1,420.00$2.20$1,562.00$3.00$2,130.00
2554.502END TREATMENT-TANGENT TERMINALEACH4$3,215.00$12,860.00$3,300.00$13,200.00$3,061.00$12,244.00$3,730.00$14,920.00$3,200.00$12,800.00
2554.503TRAFFIC BARRIER DESIGN SPECIALLIN FT100$95.00$9,500.00$98.00$9,800.00$90.50$9,050.00$141.00$14,100.00$95.00$9,500.00
2554.503TRAFFIC BARRIER DESIGN B8307LIN FT100$25.75$2,575.00$26.00$2,600.00$24.50$2,450.00$24.50$2,450.00$26.00$2,600.00
2563.601TRAFFIC CONTROLLUMP SUM0.63$9,000.00$5,670.00$6,600.00$4,158.00$6,400.00$4,032.00$20,000.00$12,600.00$7,000.00$4,410.00
2563.601TRAFFIC CONTROLLUMP SUM0.3$9,000.00$2,700.00$6,600.00$1,980.00$6,400.00$1,920.00$20,000.00$6,000.00$7,000.00$2,100.00
2563.601TRAFFIC CONTROLLUMP SUM0.07$9,000.00$630.00$6,600.00$462.00$6,400.00$448.00$20,000.00$1,400.00$7,000.00$490.00
2564.502INSTALL SIGN PANEL TYPE CEACH28$130.00$3,640.00$130.00$3,640.00$125.00$3,500.00$135.00$3,780.00$130.00$3,640.00
2573.501EROSION CONTROL SUPERVISORLUMP SUM1$3,500.00$3,500.00$500.00$500.00$1,200.00$1,200.00$12,000.00$12,000.00$800.00$800.00
2573.503SILT FENCE; TYPE HILIN FT4,775$3.15$15,041.25$3.10$14,802.50$3.10$14,802.50$3.40$16,235.00$3.15$15,041.25
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT500$42.00$21,000.00$27.00$13,500.00$26.00$13,000.00$29.00$14,500.00$27.00$13,500.00
2573.602ROCK DITCH CHECKEACH40$533.00$21,320.00$200.00$8,000.00$250.00$10,000.00$600.00$24,000.00$300.00$12,000.00
2574.507COMMON TOPSOIL BORROWCU YD2,900$8.75$25,375.00$19.00$55,100.00$16.00$46,400.00$8.50$24,650.00$25.00$72,500.00
2574.508FERTILIZER TYPE 3POUND2,520$0.80$2,016.00$0.64$1,612.80$0.60$1,512.00$0.65$1,638.00$0.65$1,638.00
2575.504EROSION CONTROL BLANKETS CATEGORY 4NSQ YD4,650$2.85$13,252.50$1.90$8,835.00$1.80$8,370.00$2.00$9,300.00$1.90$8,835.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NSQ YD30,150$2.00$60,300.00$1.25$37,687.50$1.20$36,180.00$1.35$40,702.50$1.25$37,687.50
2575.505SEEDINGACRE7.2$368.00$2,649.60$260.00$1,872.00$250.00$1,800.00$283.00$2,037.60$262.50$1,890.00
2575.508SEED MIXTURE 25-141POUND425$6.15$2,613.75$4.00$1,700.00$3.90$1,657.50$4.40$1,870.00$4.10$1,742.50
2575.523RAPID STABILIZATION METHOD 3M GALLON86.4$305.00$26,352.00$365.00$31,536.00$350.00$30,240.00$385.00$33,264.00$367.50$31,752.00
2580.503INTERIM PAVEMENT MARKINGLIN FT10,000$0.09$900.00$0.20$2,000.00$0.20$2,000.00$0.20$2,000.00$0.21$2,100.00
2582.5034" DBLE SOLID LINE PAINTLIN FT5,000$0.88$4,400.00$0.88$4,400.00$0.85$4,250.00$0.92$4,600.00$0.88$4,400.00
2582.5036" SOLID LINE PAINTLIN FT9,800$0.68$6,664.00$0.68$6,664.00$0.65$6,370.00$0.71$6,958.00$0.68$6,664.00
 Totals for project CP 0052-300223 $2,547,929.40 $2,868,296.50 $2,879,400.00 $2,883,304.81 $2,901,605.30
 
Contract Total:$2,547,929.40$2,868,296.50$2,879,400.00$2,883,304.81$2,901,605.30