Contract Bid Abstract

CP 0421-312073 (Tied) - CP 0421-312073 (Tied) Br 299KGM Contractors, Inc TNT Aggregates LLC Landwehr Construction, Inc. Casper Construction, Inc. Northland Constructors of Duluth, Inc. Hoover Construction Company Ulland Brothers, Inc. George Bougalis and Sons Co. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.44$10,500.00$4,620.00$16,354.75$7,196.09$12,000.00$5,280.00$19,500.00$8,580.00$10,500.00$4,620.00$12,200.00$5,368.00$24,000.00$10,560.00$13,397.00$5,894.68
2021.501MOBILIZATIONLUMP SUM0.56$10,500.00$5,880.00$16,354.75$9,158.66$12,000.00$6,720.00$19,500.00$10,920.00$10,500.00$5,880.00$12,200.00$6,832.00$24,000.00$13,440.00$13,397.00$7,502.32
2031.501FIELD OFFICE TYPE DEACH1$7,000.00$7,000.00$1,500.00$1,500.00$2,500.00$2,500.00$1,250.00$1,250.00$1,500.00$1,500.00$2,400.00$2,400.00$2,500.00$2,500.00$12,782.00$12,782.00
2101.511CLEARING & GRUBBINGLUMP SUM1$5,000.00$5,000.00$6,500.00$6,500.00$5,700.00$5,700.00$7,000.00$7,000.00$2,000.00$2,000.00$1,000.00$1,000.00$3,500.00$3,500.00$2,784.00$2,784.00
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$4,900.00$4,900.00$11,000.00$11,000.00$5,700.00$5,700.00$9,250.00$9,250.00$9,000.00$9,000.00$8,500.00$8,500.00$21,000.00$21,000.00$20,669.00$20,669.00
2105.601DEWATERINGLUMP SUM1$2,700.00$2,700.00$2,750.00$2,750.00$3,650.00$3,650.00$2,300.00$2,300.00$1,500.00$1,500.00$2,800.00$2,800.00$9,000.00$9,000.00$18,419.00$18,419.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD435$3.40$1,479.00$3.50$1,522.50$2.50$1,087.50$2.25$978.75$3.00$1,305.00$2.90$1,261.50$3.00$1,305.00$2.00$870.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD400$3.40$1,360.00$3.50$1,400.00$2.50$1,000.00$2.25$900.00$3.00$1,200.00$2.90$1,160.00$3.00$1,200.00$2.00$800.00
2106.501EXCAVATION - COMMON (P)CU YD1,171$8.60$10,070.60$10.00$11,710.00$8.00$9,368.00$17.50$20,492.50$13.00$15,223.00$11.00$12,881.00$12.00$14,052.00$22.00$25,762.00
2106.522SELECT GRANULAR EMBANKMENT (CV) (P)CU YD497$14.60$7,256.20$20.00$9,940.00$19.00$9,443.00$18.10$8,995.70$34.00$16,898.00$21.50$10,685.50$26.00$12,922.00$26.00$12,922.00
2106.522SELECT GRANULAR EMBANKMENT (CV) (P)CU YD385$14.60$5,621.00$20.00$7,700.00$19.00$7,315.00$18.10$6,968.50$34.00$13,090.00$21.50$8,277.50$26.00$10,010.00$26.00$10,010.00
2118.607AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD800$25.00$20,000.00$24.00$19,200.00$31.50$25,200.00$26.95$21,560.00$40.00$32,000.00$23.50$18,800.00$30.00$24,000.00$33.00$26,400.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON95$3.75$356.25$12.00$1,140.00$11.00$1,045.00$5.50$522.50$6.00$570.00$10.00$950.00$10.00$950.00$17.00$1,615.00
2412.51112X6 PRECAST CONCRETE BOX CULVERTLIN FT36$950.00$34,200.00$990.00$35,640.00$855.00$30,780.00$1,000.00$36,000.00$900.00$32,400.00$1,035.00$37,260.00$935.00$33,660.00$861.00$30,996.00
2412.51212X6 PRECAST CONCRETE BOX CULV END SECTEACH2$15,500.00$31,000.00$15,500.00$31,000.00$14,365.00$28,730.00$14,500.00$29,000.00$16,000.00$32,000.00$18,000.00$36,000.00$15,000.00$30,000.00$14,181.00$28,362.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$1,500.00$1,500.00$1,250.00$1,250.00$3,575.00$3,575.00$500.00$500.00$3,000.00$3,000.00$2,000.00$2,000.00$2,000.00$2,000.00$7,435.00$7,435.00
2451.515COARSE AGGREGATE BEDDING (CV) (P)CU YD92$38.00$3,496.00$40.00$3,680.00$45.00$4,140.00$24.35$2,240.20$54.00$4,968.00$40.00$3,680.00$45.00$4,140.00$42.00$3,864.00
2451.515COARSE AGGREGATE BEDDING (CV) (P)CU YD48$38.00$1,824.00$40.00$1,920.00$45.00$2,160.00$24.35$1,168.80$54.00$2,592.00$40.00$1,920.00$45.00$2,160.00$42.00$2,016.00
2501.501CULVERT EXCAVATION CLASS U (P)CU YD691$9.75$6,737.25$9.00$6,219.00$9.00$6,219.00$9.75$6,737.25$16.00$11,056.00$11.00$7,601.00$12.00$8,292.00$22.00$15,202.00
2501.501CULVERT EXCAVATION CLASS U (P)CU YD285$9.75$2,778.75$9.00$2,565.00$9.00$2,565.00$9.75$2,778.75$16.00$4,560.00$11.00$3,135.00$12.00$3,420.00$22.00$6,270.00
2501.52157" SPAN CAS PIPE-ARCH CULVERTLIN FT144$120.00$17,280.00$100.00$14,400.00$114.00$16,416.00$81.25$11,700.00$95.00$13,680.00$129.00$18,576.00$120.00$17,280.00$31.00$4,464.00
2501.52557" SPAN GS PIPE-ARCH APRONEACH8$1,200.00$9,600.00$1,125.00$9,000.00$730.00$5,840.00$875.00$7,000.00$1,200.00$9,600.00$2,000.00$16,000.00$1,200.00$9,600.00$982.00$7,856.00
2501.573INSTALL CULVERT MARKEREACH4$60.00$240.00$125.00$500.00$165.00$660.00$115.00$460.00$160.00$640.00$100.00$400.00$100.00$400.00$877.00$3,508.00
2511.501RANDOM RIPRAP CLASS IIICU YD22$65.00$1,430.00$70.00$1,540.00$70.00$1,540.00$55.75$1,226.50$60.00$1,320.00$60.00$1,320.00$80.00$1,760.00$85.00$1,870.00
2563.601TRAFFIC CONTROLLUMP SUM0.44$2,100.00$924.00$1,200.00$528.00$2,700.00$1,188.00$1,500.00$660.00$1,800.00$792.00$1,435.00$631.40$1,400.00$616.00$3,497.00$1,538.68
2563.601TRAFFIC CONTROLLUMP SUM0.56$2,100.00$1,176.00$1,200.00$672.00$2,700.00$1,512.00$1,500.00$840.00$1,800.00$1,008.00$1,435.00$803.60$1,400.00$784.00$3,497.00$1,958.32
2573.502SILT FENCE, TYPE HILIN FT1,600$3.40$5,440.00$3.00$4,800.00$3.30$5,280.00$4.00$6,400.00$3.70$5,920.00$3.10$4,960.00$3.50$5,600.00$4.00$6,400.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$600.00$600.00$500.00$500.00$1,300.00$1,300.00$950.00$950.00$500.00$500.00$400.00$400.00$1,000.00$1,000.00$5,106.00$5,106.00
2574.508FERTILIZER TYPE 3POUND336$1.05$352.80$1.00$336.00$0.90$302.40$1.15$386.40$1.05$352.80$0.80$268.80$1.00$336.00$0.80$268.80
2574.525COMMON TOPSOIL BORROW (LV)CU YD405$15.00$6,075.00$22.00$8,910.00$27.00$10,935.00$33.50$13,567.50$9.00$3,645.00$24.00$9,720.00$10.00$4,050.00$38.00$15,390.00
2575.501SEEDINGACRE0.96$1,050.00$1,008.00$500.00$480.00$600.00$576.00$700.00$672.00$630.00$604.80$515.00$494.40$600.00$576.00$628.00$602.88
2575.502SEED MIXTURE 25-141POUND57$31.50$1,795.50$6.00$342.00$7.80$444.60$7.00$399.00$6.30$359.10$8.00$456.00$6.00$342.00$5.00$285.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3NSQ YD4,629$3.10$14,349.90$1.75$8,100.75$1.70$7,869.30$2.10$9,720.90$1.90$8,795.10$1.55$7,174.95$1.80$8,332.20$2.25$10,415.25
2575.571RAPID STABILIZATION METHOD 3M GALLON12$105.00$1,260.00$400.00$4,800.00$670.00$8,040.00$470.00$5,640.00$420.00$5,040.00$615.00$7,380.00$400.00$4,800.00$859.00$10,308.00
 Totals for project CP 0421-312073 (Tied) $219,310.25 $227,900.00 $224,080.80 $237,765.25 $247,618.80 $241,096.65 $263,587.20 $310,545.93
 
CP 0375-259415 Br 514 (Low) - CP 0375-259415 (Low) Br 514KGM Contractors, Inc TNT Aggregates LLC Landwehr Construction, Inc. Casper Construction, Inc. Northland Constructors of Duluth, Inc. Hoover Construction Company Ulland Brothers, Inc. George Bougalis and Sons Co. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.26$25,000.00$6,500.00$18,771.25$4,880.53$15,900.00$4,134.00$18,095.05$4,704.71$10,500.00$2,730.00$11,900.00$3,094.00$21,076.80$5,479.97$55,000.00$14,300.00
2021.501MOBILIZATIONLUMP SUM0.74$25,000.00$18,500.00$18,771.25$13,890.73$15,900.00$11,766.00$18,095.05$13,390.34$10,500.00$7,770.00$11,900.00$8,806.00$21,076.80$15,596.83$55,000.00$40,700.00
2031.501FIELD OFFICE TYPE DEACH1$7,000.00$7,000.00$1,500.00$1,500.00$2,500.00$2,500.00$1,250.00$1,250.00$1,500.00$1,500.00$2,400.00$2,400.00$2,000.00$2,000.00$12,782.00$12,782.00
2101.511CLEARING & GRUBBINGLUMP SUM1$1,200.00$1,200.00$2,500.00$2,500.00$3,420.00$3,420.00$500.00$500.00$2,000.00$2,000.00$2,000.00$2,000.00$2,500.00$2,500.00$2,784.00$2,784.00
2104.523SALVAGE SIGNEACH8$60.00$480.00$35.00$280.00$70.00$560.00$30.00$240.00$100.00$800.00$100.00$800.00$25.00$200.00$192.00$1,536.00
2105.601DEWATERINGLUMP SUM1$2,700.00$2,700.00$2,750.00$2,750.00$5,340.00$5,340.00$4,500.00$4,500.00$2,500.00$2,500.00$5,250.00$5,250.00$8,000.00$8,000.00$9,209.00$9,209.00
2105.601TEMPORARY STREAM DIVERSION SYSTEMLUMP SUM1$4,900.00$4,900.00$13,000.00$13,000.00$10,315.00$10,315.00$11,750.00$11,750.00$12,500.00$12,500.00$33,000.00$33,000.00$28,000.00$28,000.00$20,669.00$20,669.00
2105.601ONE LANE BYPASS (14' LANE)LUMP SUM1$5,000.00$5,000.00$20,000.00$20,000.00$23,275.00$23,275.00$20,000.00$20,000.00$14,000.00$14,000.00$28,500.00$28,500.00$14,000.00$14,000.00$29,688.00$29,688.00
2105.604GEOTEXTILE FABRIC TYPE VISQ YD345$3.40$1,173.00$3.50$1,207.50$3.60$1,242.00$3.00$1,035.00$3.00$1,035.00$2.90$1,000.50$3.00$1,035.00$2.00$690.00
2106.501EXCAVATION - COMMON (P)CU YD320$11.00$3,520.00$15.00$4,800.00$5.70$1,824.00$17.10$5,472.00$15.00$4,800.00$14.50$4,640.00$12.00$3,840.00$22.00$7,040.00
2106.521GRANULAR EMBANKMENT (CV) (P)CU YD213$16.40$3,493.20$17.00$3,621.00$14.50$3,088.50$23.15$4,930.95$22.00$4,686.00$14.00$2,982.00$20.00$4,260.00$26.00$5,538.00
2106.522SELECT GRANULAR EMBANKMENT (CV) (P)CU YD500$16.40$8,200.00$21.00$10,500.00$19.30$9,650.00$23.00$11,500.00$28.00$14,000.00$19.50$9,750.00$29.00$14,500.00$26.00$13,000.00
2106.522SELECT GRANULAR EMBANKMENT (CV) (P)CU YD304$16.40$4,985.60$21.00$6,384.00$19.30$5,867.20$23.00$6,992.00$28.00$8,512.00$19.50$5,928.00$29.00$8,816.00$26.00$7,904.00
2118.607AGGREGATE SURFACING (CV) CLASS 5 (P)CU YD760$25.00$19,000.00$24.00$18,240.00$34.50$26,220.00$28.75$21,850.00$30.00$22,800.00$27.00$20,520.00$34.00$25,840.00$33.00$25,080.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON80$3.75$300.00$12.00$960.00$11.20$896.00$5.50$440.00$6.00$480.00$10.00$800.00$10.00$800.00$17.00$1,360.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$5,000.00$5,000.00$8,500.00$8,500.00$7,250.00$7,250.00$16,000.00$16,000.00$7,900.00$7,900.00$19,900.00$19,900.00$14,000.00$14,000.00$7,435.00$7,435.00
2451.515COARSE AGGREGATE BEDDING (CV) (P)CU YD54$38.00$2,052.00$38.00$2,052.00$30.00$1,620.00$22.50$1,215.00$50.00$2,700.00$36.50$1,971.00$50.00$2,700.00$42.00$2,268.00
2451.515COARSE AGGREGATE BEDDING (CV) (P)CU YD80$38.00$3,040.00$38.00$3,040.00$30.00$2,400.00$22.50$1,800.00$50.00$4,000.00$36.50$2,920.00$50.00$4,000.00$42.00$3,360.00
2501.501CULVERT EXCAVATION CLASS U (P)CU YD370$9.75$3,607.50$11.00$4,070.00$17.00$6,290.00$6.25$2,312.50$15.00$5,550.00$11.00$4,070.00$10.00$3,700.00$22.00$8,140.00
2501.501CULVERT EXCAVATION CLASS U (P)CU YD290$9.75$2,827.50$11.00$3,190.00$17.00$4,930.00$6.25$1,812.50$15.00$4,350.00$11.00$3,190.00$10.00$2,900.00$22.00$6,380.00
2501.511120" CAS PIPE CULVERTLIN FT68$300.00$20,400.00$325.00$22,100.00$350.00$23,800.00$280.00$19,040.00$320.00$21,760.00$330.00$22,440.00$335.00$22,780.00$31.00$2,108.00
2501.52171" SPAN CAS PIPE-ARCH CULVERTLIN FT120$160.00$19,200.00$150.00$18,000.00$155.00$18,600.00$120.00$14,400.00$150.00$18,000.00$204.00$24,480.00$165.00$19,800.00$31.00$3,720.00
2501.52571" SPAN GS PIPE-ARCH APRONEACH6$1,500.00$9,000.00$1,700.00$10,200.00$1,250.00$7,500.00$1,325.00$7,950.00$1,600.00$9,600.00$1,700.00$10,200.00$1,700.00$10,200.00$982.00$5,892.00
2501.573INSTALL CULVERT MARKEREACH4$60.00$240.00$125.00$500.00$165.00$660.00$115.00$460.00$160.00$640.00$100.00$400.00$100.00$400.00$877.00$3,508.00
2511.501RANDOM RIPRAP CLASS IIICU YD30$62.00$1,860.00$65.00$1,950.00$65.00$1,950.00$39.00$1,170.00$60.00$1,800.00$54.00$1,620.00$80.00$2,400.00$81.00$2,430.00
2563.601TRAFFIC CONTROLLUMP SUM0.26$1,875.00$487.50$1,400.00$364.00$2,700.00$702.00$1,400.00$364.00$1,800.00$468.00$1,230.00$319.80$1,200.00$312.00$3,497.00$909.22
2563.601TRAFFIC CONTROLLUMP SUM0.74$1,875.00$1,387.50$1,400.00$1,036.00$2,700.00$1,998.00$1,400.00$1,036.00$1,800.00$1,332.00$1,230.00$910.20$1,200.00$888.00$3,497.00$2,587.78
2573.502SILT FENCE, TYPE HILIN FT1,270$3.40$4,318.00$3.00$3,810.00$3.30$4,191.00$4.00$5,080.00$3.70$4,699.00$3.10$3,937.00$3.50$4,445.00$4.00$5,080.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$600.00$600.00$500.00$500.00$1,300.00$1,300.00$950.00$950.00$500.00$500.00$400.00$400.00$1,000.00$1,000.00$5,106.00$5,106.00
2574.508FERTILIZER TYPE 3POUND195$1.05$204.75$1.00$195.00$0.90$175.50$1.15$224.25$1.05$204.75$0.80$156.00$1.00$195.00$0.80$156.00
2574.525COMMON TOPSOIL BORROWCU YD145$15.00$2,175.00$22.00$3,190.00$32.00$4,640.00$30.00$4,350.00$15.00$2,175.00$24.00$3,480.00$10.00$1,450.00$38.00$5,510.00
2575.501SEEDINGACRE0.55$1,050.00$577.50$500.00$275.00$785.00$431.75$700.00$385.00$630.00$346.50$720.00$396.00$600.00$330.00$628.00$345.40
2575.502SEED MIXTURE 25-141POUND33$31.50$1,039.50$6.00$198.00$7.80$257.40$7.00$231.00$6.30$207.90$8.00$264.00$6.00$198.00$5.00$165.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3NSQ YD2,615$3.10$8,106.50$1.75$4,576.25$1.85$4,837.75$2.10$5,491.50$1.90$4,968.50$1.70$4,445.50$1.80$4,707.00$2.25$5,883.75
2575.571RAPID STABILIZATION METHOD 3M GALLON6.6$105.00$693.00$400.00$2,640.00$785.00$5,181.00$470.00$3,102.00$420.00$2,772.00$720.00$4,752.00$400.00$2,640.00$942.00$6,217.20
 Totals for project CP 0375-259415 Br 514 (Low) $173,768.05 $194,900.01 $208,812.10 $195,928.75 $194,086.65 $239,722.00 $233,912.80 $269,481.35
 
Contract Total:$393,078.30$422,800.01$432,892.90$433,694.00$441,705.45$480,818.65$497,500.00$580,027.28