Bid Abstract

CP 0837-299737 TST - CP 0837-299737 TST - Reclaim & OverlayKGM Contractors, Inc Hawkinson Construction Co., Inc Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$7,500.00$7,500.00$26,650.00$26,650.00$10,000.00$10,000.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$8,500.00$8,500.00$3,500.00$3,500.00$3,700.00$3,700.00
2104.501REMOVE PIPE CULVERTSLIN FT291$10.00$2,910.00$10.00$2,910.00$25.00$7,275.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD1,068$3.25$3,471.00$3.25$3,471.00$4.50$4,806.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT322$5.00$1,610.00$3.10$998.20$2.30$740.60
2105.604GEOTEXTILE FABRIC TYPE VISQ YD1,190$3.35$3,986.50$3.35$3,986.50$2.30$2,737.00
2105.604GEOGRIDSQ YD450$4.30$1,935.00$4.30$1,935.00$4.50$2,025.00
2106.607GRANULAR EMBANKMENT (CV) (P)CU YD81$18.00$1,458.00$18.00$1,458.00$40.00$3,240.00
2118.501AGGREGATE SURFACING CLASS 5TON1,381$17.70$24,443.70$25.30$34,939.30$23.00$31,763.00
2123.503MOTOR GRADERHOUR30$185.00$5,550.00$190.00$5,700.00$260.00$7,800.00
2123.5070.5 CU YD SHOVELHOUR15$160.00$2,400.00$175.00$2,625.00$290.00$4,350.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR30$160.00$4,800.00$190.00$5,700.00$185.00$5,550.00
2130.501WATERM GALLON60$35.00$2,100.00$45.00$2,700.00$46.00$2,760.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON3,838$1.10$4,221.80$1.10$4,221.80$1.20$4,605.60
2211.501AGGREGATE BASE CLASS 5TON300$11.00$3,300.00$13.50$4,050.00$21.00$6,300.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD410$19.00$7,790.00$19.00$7,790.00$37.00$15,170.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD33,266$0.70$23,286.20$0.60$19,959.60$0.40$13,306.40
2215.501FULL DEPTH RECLAMATIONSQ YD35,826$0.65$23,286.90$0.75$26,869.50$0.47$16,838.22
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON3,404$2.65$9,020.60$3.75$12,765.00$3.90$13,275.60
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON8,764$2.75$24,101.00$2.85$24,977.40$3.00$26,292.00
2356.506BITUMINOUS SEAL COATSQ YD26,558$0.80$21,246.40$0.45$11,951.10$0.47$12,482.26
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON1,721$2.35$4,044.35$2.00$3,442.00$2.20$3,786.20
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON1,302$2.45$3,189.90$2.50$3,255.00$2.40$3,124.80
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON5,974$51.00$304,674.00$51.00$304,674.00$47.00$280,778.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON4$90.00$360.00$145.00$580.00$100.00$400.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD1,806$11.00$19,866.00$10.50$18,963.00$18.00$32,508.00
2451.503GRANULAR BACKFILL (CV) (P)CU YD959$11.75$11,268.25$11.75$11,268.25$38.00$36,442.00
2451.507GRANULAR BEDDING (CV) (P)CU YD139$24.00$3,336.00$24.00$3,336.00$39.00$5,421.00
2501.51524" RC PIPE APRONEACH2$580.00$1,160.00$580.00$1,160.00$800.00$1,600.00
2501.51536" RC PIPE APRONEACH2$985.00$1,970.00$985.00$1,970.00$1,200.00$2,400.00
2501.51518" RC PIPE APRONEACH4$550.00$2,200.00$550.00$2,200.00$700.00$2,800.00
2501.52122" SPAN RC PIPE-ARCH CULV CL IIALIN FT36$72.00$2,592.00$72.00$2,592.00$75.00$2,700.00
2501.52173" SPAN RC PIPE-ARCH CULV CL IIALIN FT48$365.00$17,520.00$365.00$17,520.00$275.00$13,200.00
2501.52522" SPAN RC PIPE-ARCH APRONEACH2$435.00$870.00$435.00$870.00$700.00$1,400.00
2501.52573" SPAN RC PIPE-ARCH APRONEACH2$3,000.00$6,000.00$3,000.00$6,000.00$3,300.00$6,600.00
2501.56136" RC PIPE CULVERT DES 3006LIN FT40$108.00$4,320.00$108.00$4,320.00$124.00$4,960.00
2501.56118" RC PIPE CULVERT DES 3006LIN FT80$57.00$4,560.00$57.00$4,560.00$68.00$5,440.00
2501.56124" RC PIPE CULVERT DES 3006LIN FT50$67.00$3,350.00$67.00$3,350.00$79.00$3,950.00
2540.602MAIL BOX SUPPORTEACH4$135.00$540.00$127.50$510.00$130.00$520.00
2563.601WORK ZONE SPEED LIMITLUMP SUM1$1,050.00$1,050.00$750.00$750.00$770.00$770.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$2,500.00$2,500.00$750.00$750.00$2,100.00$2,100.00
2563.601TRAFFIC CONTROLLUMP SUM1$2,000.00$2,000.00$4,200.00$4,200.00$6,000.00$6,000.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT910$2.50$2,275.00$2.50$2,275.00$3.70$3,367.00
2575.572RAPID STABILIZATION METHOD 4SQ YD1,554$1.50$2,331.00$1.50$2,331.00$1.80$2,797.20
2580.603INTERIM PAVEMENT MARKINGLIN FT12,748$0.20$2,549.60$0.22$2,804.56$0.19$2,422.12
2580.603INTERIM PAVEMENT MARKINGLIN FT12,748$0.15$1,912.20$0.20$2,549.60$0.19$2,422.12
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT3,530$0.20$706.00$0.18$635.40$0.19$670.70
2582.5024" DOUBLE SOLID LINE YELLOW-PAINTLIN FT287$0.15$43.05$0.14$40.18$0.15$43.05
2582.5026" SOLID LINE WHITE-PAINTLIN FT23,114$0.10$2,311.40$0.08$1,849.12$0.09$2,080.26
2582.5024" SOLID LINE YELLOW-PAINTLIN FT3,530$0.10$353.00$0.07$247.10$0.08$282.40
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT2,270$0.20$454.00$0.18$408.60$0.19$431.30
2582.50224" SOLID LINE WHITE-EPOXYLIN FT16$7.35$117.60$7.00$112.00$7.30$116.80
2582.5024" DOUBLE SOLID LINE YELLOW-EPOXYLIN FT287$0.40$114.80$0.36$103.32$0.38$109.06
2582.5026" SOLID LINE WHITE-EPOXYLIN FT23,114$0.25$5,778.50$0.23$5,316.22$0.24$5,547.36
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT2,270$0.10$227.00$0.07$158.90$0.08$181.60
2582.50224" SOLID LINE WHITE-PAINTLIN FT16$3.15$50.40$3.00$48.00$3.10$49.60
 Totals for project CP 0837-299737 TST $603,511.15 $624,306.65 $632,437.25
 
Contract Total:$603,511.15$624,306.65$632,437.25