Bid Abstract

CP 0133-289400 TST - CP 0133-289400 TST (Tied) - Reclaim & OverlayNorthland Constructors of Duluth, Inc. Hawkinson Construction Co., Inc KGM Contractors, Inc 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM1$5,000.00$5,000.00$31,000.00$31,000.00$9,600.00$9,600.00
2021.601MOBILIZATION, SEAL COATLUMP SUM1$3,700.00$3,700.00$3,500.00$3,500.00$9,000.00$9,000.00
2104.501REMOVE PIPE CULVERTSLIN FT54$25.00$1,350.00$10.00$540.00$10.00$540.00
2104.505REMOVE BITUMINOUS PAVEMENTSQ YD930$4.00$3,720.00$3.35$3,115.50$3.35$3,115.50
2104.513SAWING BIT PAVEMENT (FULL DEPTH)LIN FT452$2.30$1,039.60$3.10$1,401.20$3.10$1,401.20
2105.604GEOTEXTILE FABRIC TYPE VISQ YD226$2.60$587.60$3.30$745.80$3.30$745.80
2105.604GEOGRIDSQ YD86$5.50$473.00$4.30$369.80$4.30$369.80
2118.501AGGREGATE SURFACING CLASS 5TON2,187$13.50$29,524.50$19.30$42,209.10$17.70$38,709.90
2123.503MOTOR GRADERHOUR43$260.00$11,180.00$190.00$8,170.00$185.00$7,955.00
2123.5070.5 CU YD SHOVELHOUR15$290.00$4,350.00$175.00$2,625.00$160.00$2,400.00
2123.5258 TON STEEL-WHEELED ROLLERHOUR43$185.00$7,955.00$190.00$8,170.00$165.00$7,095.00
2130.501WATERM GALLON100$46.00$4,600.00$45.00$4,500.00$40.00$4,000.00
2131.502CALCIUM CHLORIDE SOLUTIONGALLON5,695$1.20$6,834.00$1.30$7,403.50$1.10$6,264.50
2211.501AGGREGATE BASE CLASS 5TON1,600$19.00$30,400.00$13.50$21,600.00$10.75$17,200.00
2211.503AGGREGATE BASE (CV) CLASS 5 (P)CU YD110$30.00$3,300.00$19.00$2,090.00$19.00$2,090.00
2211.604AGGREGATE BASE STABILIZATIONSQ YD55,046$0.37$20,367.02$0.60$33,027.60$0.70$38,532.20
2215.501FULL DEPTH RECLAMATIONSQ YD61,793$0.35$21,627.55$0.75$46,344.75$0.75$46,344.75
2232.603MILLED RUMBLE STRIPS-INTERMITTENTLIN FT31,556$0.13$4,102.28$0.12$3,786.72$0.20$6,311.20
2355.502BITUMINOUS MATERIAL FOR FOG SEALGALLON6,150$3.90$23,985.00$3.75$23,062.50$2.65$16,297.50
2356.505BITUMINOUS MATERIAL FOR SEAL COATGALLON14,157$3.00$42,471.00$2.85$40,347.45$2.75$38,931.75
2356.506BITUMINOUS SEAL COATSQ YD42,898$0.47$20,162.06$0.45$19,304.10$0.80$34,318.40
2357.502BITUMINOUS MATERIAL FOR TACK COATGALLON3,240$2.20$7,128.00$2.00$6,480.00$2.30$7,452.00
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGALLON2,068$2.40$4,963.20$2.50$5,170.00$2.40$4,963.20
2360.501TYPE SP 12.5 WEARING COURSE MIX (3,C)TON11,094$43.00$477,042.00$45.80$508,105.20$51.50$571,341.00
2360.505TYPE SP 12.5 BITUMINOUS MIXTURE FOR ENTRANCES (3,C)TON164$70.00$11,480.00$93.00$15,252.00$68.00$11,152.00
2451.501STRUCTURE EXCAVATION CLASS E (P)CU YD205$19.00$3,895.00$10.50$2,152.50$10.50$2,152.50
2451.503GRANULAR BACKFILL (CV) (P)CU YD167$32.00$5,344.00$11.75$1,962.25$11.75$1,962.25
2451.507GRANULAR BEDDING (CV) (P)CU YD19$37.00$703.00$24.00$456.00$24.00$456.00
2501.52128" SPAN RC PIPE-ARCH CULV CL IIALIN FT50$97.00$4,850.00$82.00$4,100.00$82.00$4,100.00
2501.52528" SPAN RC PIPE-ARCH APRONEACH2$1,050.00$2,100.00$585.00$1,170.00$585.00$1,170.00
2540.602MAIL BOX SUPPORTEACH4$130.00$520.00$500.00$2,000.00$133.88$535.52
2563.601WORK ZONE SPEED LIMITLUMP SUM1$770.00$770.00$750.00$750.00$1,050.00$1,050.00
2563.601TRAFFIC CONTROL, SEAL COATLUMP SUM1$2,100.00$2,100.00$850.00$850.00$2,100.00$2,100.00
2563.601TRAFFIC CONTROLLUMP SUM1$9,500.00$9,500.00$2,600.00$2,600.00$3,600.00$3,600.00
2573.533SEDIMENT CONTROL LOG TYPE STRAWLIN FT180$3.70$666.00$2.50$450.00$2.50$450.00
2575.572RAPID STABILIZATION METHOD 4SQ YD164$2.80$459.20$1.50$246.00$1.50$246.00
2580.603INTERIM PAVEMENT MARKINGLIN FT11,430$0.19$2,171.70$0.22$2,514.60$0.15$1,714.50
2580.603INTERIM PAVEMENT MARKINGLIN FT11,430$0.19$2,171.70$0.22$2,514.60$0.15$1,714.50
2582.501PAVT MSSG (STOP AHEAD) EPOXYEACH1$390.00$390.00$375.00$375.00$400.00$400.00
2582.5024" SOLID LINE YELLOW-EPOXYLIN FT2,285$0.19$434.15$0.18$411.30$0.20$457.00
2582.5026" SOLID LINE WHITE-PAINTLIN FT34,769$0.09$3,129.21$0.08$2,781.52$0.10$3,476.90
2582.5026" SOLID LINE WHITE-EPOXYLIN FT34,769$0.24$8,344.56$0.23$7,996.87$0.25$8,692.25
2582.5024" SOLID LINE YELLOW-PAINTLIN FT2,285$0.08$182.80$0.07$159.95$0.10$228.50
2582.5024" BROKEN LINE YELLOW-EPOXYLIN FT3,430$0.19$651.70$0.18$617.40$0.20$686.00
2582.5024" BROKEN LINE YELLOW-PAINTLIN FT3,430$0.08$274.40$0.07$240.10$0.10$343.00
2582.50224" SOLID LINE WHITE-EPOXYLIN FT17$7.30$124.10$7.00$119.00$7.35$124.95
2582.50224" SOLID LINE WHITE-PAINTLIN FT17$3.10$52.70$3.00$51.00$3.15$53.55
 Totals for project CP 0133-289400 TST $796,176.03 $872,838.31 $921,844.12
 
Contract Total:$796,176.03$872,838.31$921,844.12