St Louis County Public Works Department

Welcome, Guest!
Log in | Employee Login | License
 

Contract Bid Abstract

CP 0936-213059 - CP 0936-213059 TST (Tied) - Bridge #305Dallco, Inc. Redstone Construction, LLC - OLD Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.64$51,283.33$32,821.33$168,000.00$107,520.00$95,000.00$60,800.00
2021.501MOBILIZATIONLUMP SUM0.36$51,283.33$18,462.00$168,000.00$60,480.00$95,000.00$34,200.00
2031.501FIELD OFFICE TYPE DEACH1$5,000.00$5,000.00$5,000.00$5,000.00$1.00$1.00
2101.511CLEARING & GRUBBINGLUMP SUM1$1,000.00$1,000.00$1,000.00$1,000.00$3,000.00$3,000.00
2104.501REMOVE PIPE CULVERTSLIN FT25$10.00$250.00$25.00$625.00$22.00$550.00
2104.523SALVAGE SIGNEACH4$65.00$260.00$45.00$180.00$50.00$200.00
2104.523SALVAGE STEEL POSTEACH2$75.00$150.00$75.00$150.00$50.00$100.00
2105.601DEWATERINGLUMP SUM1$1.00$1.00$5,000.00$5,000.00$500.00$500.00
2105.601ONE LANE BYPASS (14' LANE)LUMP SUM1$104,190.00$104,190.00$180,000.00$180,000.00$335,000.00$335,000.00
2106.607GRANULAR EMBANKMENT (CV) (P)CU YD311$18.00$5,598.00$20.00$6,220.00$22.00$6,842.00
2106.607SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD496$18.00$8,928.00$24.00$11,904.00$23.00$11,408.00
2106.607EXCAVATION - COMMON (EV) (P)CU YD846$14.00$11,844.00$13.00$10,998.00$15.50$13,113.00
2118.607AGGREGATE SURFACING (CV) CLASS 5CU YD630$26.00$16,380.00$34.00$21,420.00$27.00$17,010.00
2123.509DOZERHOUR40$150.00$6,000.00$155.00$6,200.00$140.00$5,600.00
2401.501STRUCTURAL CONCRETE (3Y43) (P)CU YD149$976.00$145,424.00$800.00$119,200.00$1,250.00$186,250.00
2401.512BRIDGE SLAB CONCRETE (3Y33) (P)SQ FT2,537$51.20$129,894.40$45.00$114,165.00$52.00$131,924.00
2401.513TYPE P-2 (TL-4) RAILING CONCRETE (3Y46) (P)LIN FT206$135.00$27,810.00$105.00$21,630.00$92.00$18,952.00
2401.541REINFORCEMENT BARS (STAINLESS-60 KSI) (P)POUND510$5.00$2,550.00$5.00$2,550.00$4.60$2,346.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)POUND50,030$1.21$60,536.30$1.25$62,537.50$1.30$65,039.00
2401.601FOUNDATION PREP PILE BENT PIERSLUMP SUM1$56,504.00$56,504.00$90,000.00$90,000.00$132,400.00$132,400.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$12,144.00$12,144.00$20,000.00$20,000.00$19,500.00$19,500.00
2401.601SLOPE PREPARATIONLUMP SUM1$10,000.00$10,000.00$5,000.00$5,000.00$3,000.00$3,000.00
2402.546FLOOR DRAIN TYPE B702EACH2$225.00$450.00$275.00$550.00$250.00$500.00
2402.584STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT194$115.00$22,310.00$140.00$27,160.00$120.00$23,280.00
2406.553BRIDGE APPROACH PANELS (P)SQ YD139$270.00$37,530.00$300.00$41,700.00$250.00$34,750.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$16,173.00$16,173.00$18,000.00$18,000.00$34,500.00$34,500.00
2452.510STEEL H-PILING DRIVEN 12"LIN FT1,000$1.00$1,000.00$1.00$1,000.00$1.00$1,000.00
2452.511STEEL H-PILING DELIVERED 12"LIN FT1,000$41.20$41,200.00$40.00$40,000.00$37.00$37,000.00
2452.520STEEL H-TEST PILE 60 FT LONG 12"EACH2$5,000.00$10,000.00$6,000.00$12,000.00$5,500.00$11,000.00
2452.520STEEL H-TEST PILE 70 FT LONG 12"EACH2$5,500.00$11,000.00$7,000.00$14,000.00$6,500.00$13,000.00
2452.530PILE TIP PROTECTION 12"EACH22$120.00$2,640.00$150.00$3,300.00$150.00$3,300.00
2501.51115" CS PIPE CULVERTLIN FT42$30.00$1,260.00$50.00$2,100.00$43.00$1,806.00
2501.51515" CS PIPE APRONEACH2$150.00$300.00$500.00$1,000.00$200.00$400.00
2502.502DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,200.00$1,200.00$2,000.00$2,000.00$2,500.00$2,500.00
2511.501RANDOM RIPRAP CLASS IIICU YD340$65.00$22,100.00$45.00$15,300.00$45.00$15,300.00
2511.501RANDOM RIPRAP CLASS IIICU YD5$65.00$325.00$45.00$225.00$45.00$225.00
2511.515GEOTEXTILE FILTER TYPE VIISQ YD610$2.50$1,525.00$2.00$1,220.00$3.70$2,257.00
2554.501TRAFFIC BARRIER DESIGN B8307LIN FT93$37.50$3,487.50$37.00$3,441.00$39.00$3,627.00
2554.501TRAFFIC BARRIER DESIGN SPECIALLIN FT100$74.00$7,400.00$73.50$7,350.00$77.00$7,700.00
2554.523END TREATMENT TANGENT TERMINALEACH3$2,450.00$7,350.00$2,400.00$7,200.00$2,500.00$7,500.00
2563.601TRAFFIC CONTROLLUMP SUM0.64$5,000.00$3,200.00$3,120.25$1,996.96$4,000.00$2,560.00
2563.601TRAFFIC CONTROLLUMP SUM0.36$5,000.00$1,800.00$3,120.25$1,123.29$4,000.00$1,440.00
2573.502SILT FENCE, TYPE HILIN FT2,890$3.00$8,670.00$3.00$8,670.00$3.20$9,248.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT280$24.00$6,720.00$23.00$6,440.00$25.00$7,000.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$1,000.00$1,000.00$500.00$500.00$500.00$500.00
2574.508FERTILIZER TYPE 3POUND116$3.00$348.00$0.80$92.80$0.84$97.44
2574.525COMMON TOPSOIL BORROWCU YD150$50.00$7,500.00$18.00$2,700.00$35.00$5,250.00
2575.501SEEDINGACRE0.33$1,500.00$495.00$700.00$231.00$730.00$240.90
2575.502SEED MIXTURE 36-311POUND23$10.00$230.00$26.00$598.00$27.00$621.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD2,294$2.50$5,735.00$1.05$2,408.70$1.10$2,523.40
2575.571RAPID STABILIZATION METHOD 3M GALLON0.9$3,500.00$3,150.00$900.00$810.00$950.00$855.00
 Totals for project CP 0936-213059 $881,845.53 $1,074,896.25 $1,277,715.74
 
CP 0597-243861 TST - CP 0597-243861 TST (Low) - Bridge 355Dallco, Inc. Redstone Construction, LLC - OLD Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.61$51,283.33$31,282.83$175,500.00$107,055.00$95,000.00$57,950.00
2021.501MOBILIZATIONLUMP SUM0.39$51,283.33$20,000.50$175,500.00$68,445.00$95,000.00$37,050.00
2031.501FIELD OFFICE TYPE DEACH1$5,000.00$5,000.00$5,000.00$5,000.00$9,000.00$9,000.00
2101.511CLEARING & GRUBBINGLUMP SUM1$1,000.00$1,000.00$2,300.00$2,300.00$2,000.00$2,000.00
2104.501REMOVE BARBED WIRE FENCELIN FT382$2.00$764.00$3.00$1,146.00$2.00$764.00
2104.523SALVAGE SIGNEACH6$65.00$390.00$45.00$270.00$50.00$300.00
2105.601ONE LANE BYPASS (14' LANE)LUMP SUM1$101,525.00$101,525.00$175,000.00$175,000.00$375,000.00$375,000.00
2105.601DEWATERINGLUMP SUM1$1.00$1.00$5,000.00$5,000.00$500.00$500.00
2106.607GRANULAR EMBANKMENT (CV) (P)CU YD239$18.00$4,302.00$20.00$4,780.00$21.00$5,019.00
2106.607SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD469$18.00$8,442.00$24.00$11,256.00$21.00$9,849.00
2106.607EXCAVATION - COMMON (EV) (P)CU YD890$14.00$12,460.00$13.50$12,015.00$14.00$12,460.00
2118.607AGGREGATE SURFACING (CV) CLASS 5CU YD645$26.00$16,770.00$34.00$21,930.00$27.00$17,415.00
2123.509DOZERHOUR40$150.00$6,000.00$155.00$6,200.00$140.00$5,600.00
2401.501STRUCTURAL CONCRETE (3Y43) (P)CU YD136$954.00$129,744.00$850.00$115,600.00$1,200.00$163,200.00
2401.512BRIDGE SLAB CONCRETE (3Y33) (P)SQ FT2,371$51.00$120,921.00$42.00$99,582.00$47.00$111,437.00
2401.513TYPE P-2 (TL-4) RAILING CONCRETE (3Y46) (P)LIN FT199$135.79$27,022.21$105.00$20,895.00$92.00$18,308.00
2401.541REINFORCEMENT BARS (STAINLESS-60 KSI) (P)POUND420$5.00$2,100.00$5.00$2,100.00$4.60$1,932.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)POUND39,590$1.22$48,299.80$1.25$49,487.50$1.30$51,467.00
2401.601SLOPE PREPARATIONLUMP SUM1$10,000.00$10,000.00$1,500.00$1,500.00$3,000.00$3,000.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$12,144.00$12,144.00$15,000.00$15,000.00$10,500.00$10,500.00
2401.601FOUNDATION PREP PILE BENT PIERSLUMP SUM1$56,504.00$56,504.00$90,000.00$90,000.00$122,600.00$122,600.00
2402.584STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT187$115.00$21,505.00$140.00$26,180.00$120.00$22,440.00
2406.553BRIDGE APPROACH PANELS (P)SQ YD137$270.00$36,990.00$325.00$44,525.00$250.00$34,250.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$14,739.00$14,739.00$18,000.00$18,000.00$32,000.00$32,000.00
2452.510STEEL H-PILING DRIVEN 12"LIN FT1,260$1.00$1,260.00$1.00$1,260.00$1.00$1,260.00
2452.511STEEL H-PILING DELIVERED 12"LIN FT1,260$39.15$49,329.00$35.00$44,100.00$38.00$47,880.00
2452.520STEEL H TEST PILE 80 FT LONG 12"EACH4$5,000.00$20,000.00$8,000.00$32,000.00$7,000.00$28,000.00
2452.530PILE TIP PROTECTION 12"EACH22$120.00$2,640.00$150.00$3,300.00$150.00$3,300.00
2502.502DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,200.00$1,200.00$2,000.00$2,000.00$2,500.00$2,500.00
2511.501RANDOM RIPRAP CLASS IIICU YD390$65.00$25,350.00$45.00$17,550.00$45.00$17,550.00
2511.515GEOTEXTILE FILTER TYPE VIISQ YD740$2.50$1,850.00$2.00$1,480.00$3.30$2,442.00
2554.501TRAFFIC BARRIER DESIGN B8307LIN FT100$37.50$3,750.00$37.00$3,700.00$39.00$3,900.00
2554.501TRAFFIC BARRIER DESIGN SPECIALLIN FT100$74.00$7,400.00$73.50$7,350.00$77.00$7,700.00
2554.523END TREATMENT TANGENT TERMINALEACH4$2,450.00$9,800.00$2,400.00$9,600.00$2,500.00$10,000.00
2563.601TRAFFIC CONTROLLUMP SUM0.61$5,000.00$3,050.00$3,120.25$1,903.35$4,000.00$2,440.00
2563.601TRAFFIC CONTROLLUMP SUM0.39$5,000.00$1,950.00$3,120.25$1,216.90$4,000.00$1,560.00
2573.502SILT FENCE, TYPE HILIN FT3,265$3.00$9,795.00$3.00$9,795.00$3.20$10,448.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT350$24.00$8,400.00$23.00$8,050.00$25.00$8,750.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$1,000.00$1,000.00$500.00$500.00$500.00$500.00
2574.508FERTILIZER TYPE 3POUND165$3.00$495.00$0.85$140.25$0.89$146.85
2574.525COMMON TOPSOIL BORROWCU YD189$50.00$9,450.00$18.00$3,402.00$32.00$6,048.00
2575.501SEEDINGACRE0.47$1,000.00$470.00$700.00$329.00$750.00$352.50
2575.502SEED MIXTURE 36-311POUND33$10.00$330.00$26.50$874.50$28.00$924.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD3,221$1.50$4,831.50$1.05$3,382.05$1.20$3,865.20
2575.571RAPID STABILIZATION METHOD 3M GALLON1.14$3,500.00$3,990.00$950.00$1,083.00$1,000.00$1,140.00
 Totals for project CP 0597-243861 TST $854,246.84 $1,056,282.55 $1,264,747.55
 
CP 0779-243926 TST - CP 0779-243926 TST (Tied) - Bridge 369Dallco, Inc. Redstone Construction, LLC - OLD Northland Constructors of Duluth, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLUMP SUM0.38$51,283.33$19,487.67$100,000.00$38,000.00$120,000.00$45,600.00
2021.501MOBILIZATIONLUMP SUM0.62$51,283.33$31,795.66$100,000.00$62,000.00$120,000.00$74,400.00
2031.501FIELD OFFICE TYPE DEACH1$5,000.00$5,000.00$5,000.00$5,000.00$8,000.00$8,000.00
2101.511CLEARING & GRUBBINGLUMP SUM1$2,500.00$2,500.00$2,200.00$2,200.00$3,000.00$3,000.00
2104.501REMOVE BARBED WIRE FENCELIN FT155$2.00$310.00$3.00$465.00$2.00$310.00
2104.523SALVAGE SIGNEACH4$65.00$260.00$45.00$180.00$50.00$200.00
2105.601DEWATERINGLUMP SUM1$1.00$1.00$5,000.00$5,000.00$500.00$500.00
2105.601ONE LANE BYPASS (14' LANE)LUMP SUM1$99,445.00$99,445.00$125,000.00$125,000.00$240,000.00$240,000.00
2106.607SELECT GRANULAR EMBANKMENT MOD 7% (CV) (P)CU YD384$18.00$6,912.00$24.00$9,216.00$25.00$9,600.00
2106.607EXCAVATION - COMMON (EV) (P)CU YD1,199$14.00$16,786.00$13.50$16,186.50$14.00$16,786.00
2106.607GRANULAR EMBANKMENT (CV) (P)CU YD148$18.00$2,664.00$20.00$2,960.00$24.00$3,552.00
2118.607AGGREGATE SURFACING (CV) CLASS 5CU YD500$26.00$13,000.00$34.00$17,000.00$29.00$14,500.00
2123.509DOZERHOUR40$150.00$6,000.00$155.00$6,200.00$140.00$5,600.00
2401.501STRUCTURAL CONCRETE (3Y43) (P)CU YD136$958.00$130,288.00$850.00$115,600.00$1,200.00$163,200.00
2401.512BRIDGE SLAB CONCRETE (3Y33) (P)SQ FT2,371$51.64$122,438.44$40.00$94,840.00$47.00$111,437.00
2401.513TYPE P-2 (TL-4) RAILING CONCRETE (3Y46) (P)LIN FT199$137.00$27,263.00$105.00$20,895.00$92.00$18,308.00
2401.541REINFORCEMENT BARS (STAINLESS-60 KSI) (P)POUND420$5.00$2,100.00$5.00$2,100.00$4.60$1,932.00
2401.541REINFORCEMENT BARS (EPOXY COATED) (P)POUND39,630$1.22$48,348.60$1.25$49,537.50$1.30$51,519.00
2401.601STRUCTURE EXCAVATIONLUMP SUM1$12,144.00$12,144.00$15,000.00$15,000.00$15,500.00$15,500.00
2401.601FOUNDATION PREP PILE BENT PIERSLUMP SUM1$56,504.00$56,504.00$75,000.00$75,000.00$122,600.00$122,600.00
2401.601SLOPE PREPARATIONLUMP SUM1$10,000.00$10,000.00$1,500.00$1,500.00$3,000.00$3,000.00
2402.546FLOOR DRAIN TYPE B702EACH4$200.00$800.00$275.00$1,100.00$250.00$1,000.00
2402.584STRUCTURAL TUBE RAILING DESIGN T-1 (P)LIN FT187$115.00$21,505.00$140.00$26,180.00$120.00$22,440.00
2406.553BRIDGE APPROACH PANELS (P)SQ YD137$272.00$37,264.00$325.00$44,525.00$250.00$34,250.00
2442.501REMOVE EXISTING BRIDGELUMP SUM1$15,500.00$15,500.00$18,000.00$18,000.00$29,500.00$29,500.00
2452.510STEEL H-PILING DRIVEN 12"LIN FT1,260$1.00$1,260.00$1.00$1,260.00$1.00$1,260.00
2452.511STEEL H-PILING DELIVERED 12"LIN FT1,260$41.00$51,660.00$35.00$44,100.00$38.00$47,880.00
2452.520STEEL H TEST PILE 80 FT LONG 12"EACH4$5,000.00$20,000.00$8,000.00$32,000.00$7,000.00$28,000.00
2452.530PILE TIP PROTECTION 12"EACH22$120.00$2,640.00$150.00$3,300.00$150.00$3,300.00
2502.502DRAINAGE SYSTEM TYPE (B910)LUMP SUM1$1,200.00$1,200.00$2,000.00$2,000.00$2,500.00$2,500.00
2511.501RANDOM RIPRAP CLASS IIICU YD370$65.00$24,050.00$45.00$16,650.00$45.00$16,650.00
2511.515GEOTEXTILE FILTER TYPE VIISQ YD670$2.50$1,675.00$2.00$1,340.00$3.50$2,345.00
2554.501TRAFFIC BARRIER DESIGN B8307LIN FT100$37.50$3,750.00$37.00$3,700.00$39.00$3,900.00
2554.501TRAFFIC BARRIER DESIGN SPECIALLIN FT100$74.00$7,400.00$73.50$7,350.00$77.00$7,700.00
2554.523END TREATMENT TANGENT TERMINALEACH4$2,450.00$9,800.00$2,400.00$9,600.00$2,500.00$10,000.00
2563.601TRAFFIC CONTROLLUMP SUM0.62$5,000.00$3,100.00$3,120.25$1,934.56$4,000.00$2,480.00
2563.601TRAFFIC CONTROLLUMP SUM0.38$5,000.00$1,900.00$3,120.25$1,185.70$4,000.00$1,520.00
2573.502SILT FENCE, TYPE HILIN FT2,530$3.00$7,590.00$3.00$7,590.00$3.20$8,096.00
2573.505FLOTATION SILT CURTAIN TYPE MOVING WATERLIN FT300$24.00$7,200.00$23.00$6,900.00$25.00$7,500.00
2573.550EROSION CONTROL SUPERVISORLUMP SUM1$1,000.00$1,000.00$500.00$500.00$500.00$500.00
2574.508FERTILIZER TYPE 3POUND112$3.00$336.00$0.85$95.20$0.89$99.68
2574.525COMMON TOPSOIL BORROWCU YD130$50.00$6,500.00$18.00$2,340.00$40.00$5,200.00
2575.501SEEDINGACRE0.32$1,500.00$480.00$700.00$224.00$750.00$240.00
2575.502SEED MIXTURE 36-311POUND23$10.00$230.00$26.50$609.50$28.00$644.00
2575.523EROSION CONTROL BLANKETS CATEGORY 3SQ YD2,124$1.50$3,186.00$1.05$2,230.20$1.20$2,548.80
2575.571RAPID STABILIZATION METHOD 3M GALLON0.75$4,000.00$3,000.00$1,000.00$750.00$1,050.00$787.50
 Totals for project CP 0779-243926 TST $846,273.37 $899,344.16 $1,149,884.98
 
Contract Total:$2,582,365.74$3,030,522.96$3,692,348.27